}

Annual Operation & Maintenance Of Electrical Infrastructure Of Street Lights And Water Supply At Iie-Selaqui, Selaqui Dehradun-Uttarakhand

State Infrastructure And Industrial Development Corporation Of Uttarakhand Limited has published Annual Operation & Maintenance Of Electrical Infrastructure Of Street Lights And Water Supply At Iie-Selaqui. Submission Date for this Tender is 25-08-2020. Coats and Jackets Tenders in Selaqui Dehradun Uttarakhand. Bidders can get complete Tender details and download the document.




Tender Notice

25097161
Annual Operation & Maintenance Of Electrical Infrastructure Of Street Lights And Water Supply At Iie-Selaqui
Open Tender
Indian
Uttarakhand
Selaqui Dehradun
25-08-2020

Tender Details

Annual Operation & Maintenance Of Electrical Infrastructure Of Street Lights And Water Supply At Iie-Selaqui , Street Light Maintenance , Pump House Maintenance With Amc Of Electrical Items , Lifting Vehical / Hydra Required For Overhead Street Lights Maintenance Purpose ( On Hire Basis ) ( 02Days / Month ) , Repair Of 60Watt Led Street Lights By Replacement Of Damaged / Diffused Drivers 60Watt Make-C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour Charges , For Pharma City Selaqui . Dlp 6 Months , Repair Of 60Watt Led Street Lights By Replacement Of Damaged / Diffused Pcb Plates 60Watt Make-C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour Charges For Pharma City , Selaqui . Dlp 6 Months . , Repair Of 90Watt Led Street Lights By Replacement Of Damaged / Diffused Drivers 90Watt Make-C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour Charges For Sidc Selaqui . Dlp 6 Months . , Repair Of 90Watt Led Street Lights By Replacement Of Damaged / Diffused Pcb Plates 90Watt Make-C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour Charges . Dlp 6 Months . , Repair Of 150Watt Led High Mast Lights By Replacement Of Damaged / Diffused Drivers 150Watt Make -C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour . Dlp 6 Months , Repair Of Led High Mast Lights Replacing Damaged / Diffused Pcb Plates 150Watt Make -C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour . Dlp 6 Months . , Repairing Of Street Lights / High Mast Electrical Control Panel Replacing 3Pole Power Contactor 100Amp Including Material Charges But Excluding Labour . One In Each , Total 02 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Street Lights / High Mast Electrical Control Panel Replacing Timer Auto Light , Including Material Charges But Excluding Labour . One In Each , Total 02 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Street Lights / High Mast Electrical Control Panel Replacing 3Pole Mccb , 100Amp Including Material Charges But Excluding Labour . One In Each , Total 02 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Street Lights / High Mast Electrical Control Panel Replacing Isolator 02 Way 40 Amps Including Material Charges But Excluding Labour . 02 In Each , Total 02 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Replacing The Burnt / Damage Pvc 1 . 5 Sqmm Single Core Wire By Required Size Of Frls Copper Cable Excluding Labour . , Supply Of Pvc Xlpe Power Cable 1 . 1 Kv Grade Armoured Size 4X 16 Sqmm Excluding Labour , Laying Of One Number Pvc Insulated & Pvc Sheatehed / Xlpe Power Cable 1 . 1 Kv Grade Upt O 35Sqmm Size Direct In Ground Inclduing Excavation Sand Cushioning Protective Covering And Refilling The Trench Extra As Required . , Erection Of Steel Tubler Or Rail Pole Strut In Cement Concrete 1:3:6 Foundation I ( Aggregate 40Mm Nominal Size ) Including Excavation And Refilling And Secured With Holding Clamps , Bolts , Nuts Etc Required ( Dsr 11 . 4 ) , Supply And Fixing Of Pre-Fab Water Proof Street Light Pole Boxes ( Powder Coated Chocolate Colour ) Size 300Mm X 00Mm X150mm Mada Of Crca Sheet Of Thickness 1 . 6Mm With Arrangement / Connection Of 3Phase Incoming And Outgoing Supply And 01 Nos 06Amp B-Curve Mcb Complete In All Respect , Wages / Labour Charges Paid To Electricians Deputed At Respective Industrial Estates Of Siidcul For O&M Work ( For 8Months ) , Wages / Labour Charges Paid To Helpers Deputed At Respective Industrial Estates Of Siidcul For O&M Work ( For 8 Months ) , Annual Maintenance Of Main Supply Transformer For Street Lights Inclduing Dehydration Of Transformer Oil , Oti / Wti Calibration Etc . ( Once In Year ) , Service Charges Of Dg Sets ( 50Kva ) Installed At Siidcul Offices / Back Up Projects Of Street Lights Inclduing Material And Labour . ( 02 Services Per Year ) , Repairing And Rewinding Of 35Hp Motor Submersibile Tubewell Complete In All Respect Including Lowering And Lifting Upto 150 Meter , Labour & Material ( As Per Requirement ) , Repairing Of 35Hp / 10 Stage Submersibile Pump By Repair / Replacement Of Pump-Bush , Sleeves , Necking Etc . Complete In All Respect Inclduing Labour & Material . ( As Per Requirement ) , Repairing Of Submersibile Motor Control Electrical Panel By Replacing 01 No Ml4 Contactor Including Material & Excluding Labour ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Submersibile Motor Control Electrical Panel Replacing 01 No 200Amp Kit Kat Switch Complete In All Respect Including Material & Excluding Labour . ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Submersibile Motor Control Electrical Panel By Replacing 200Amp Tpn Sfu Complete In All Respect Including Material & Excluding Labour . ( As Per The Requirement Raised By Engineer-In Charge ) , Replacement Of Power Cable ( 3X6sqmm ) For Supply To Submersibile Motor Pump Complete In All Respect Including Material & Labour Charges . ( As Per Requirement ) , Rewinding & Repairing Of 15Hp Water Supply Motor With Taking Out And Fixing In Position Complete In All Respect Inclduing Material And Labour Charges . , Repairing Of Water Supply Motor Control Electrical Panel Replacing 01 No 200Amp Kit Kat Switch Complete In All Respect Including Material & Excluding Labour . ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Water Supply Motor Control Electrical Panel By Replacing 200Amp Tpn Sfu Complete In All Respect Including Material & Excluding Labour . ( As Per The Requirement Raised By Engineer-In Charge )

Key Value

Document Fees
INR 1180 /-
EMD
INR 16000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail