Operational And Maintenance Work Of Electrical Infrastruture Iie Pantnagar Street Light Maintenance Transformer Generator Ac Pump House , Street Light Maintenance , Pump House Maintenace With Amc For Electrical Items , Lifting Vehical / Hydra Required For Overhead Street Lights Maintenance Purpose ( On Hire Basis ) ( 05Days / Month ) ( As Per The Requirement ) , Repair Of 60Watt Led Street Lights By Replacement Of Damaged / Diffused Drivers 60Watt Make-C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour Charges . Dlp 6 Months . , Repair Of 60Watt Led Street Lights By Replacement Of Damaged / Diffused Pcb Plates 60Watt Make-C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour Charges . Dlp 6 Months . , Repair Of 150Watt Led High Mast Lights By Replacement Of Damaged / Diffused Drivers 150Watt Make -C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour . Dlp 6 Months . , Repair Of 150Watt Led High Mast Lights Replacing Damaged / Diffused Pcb Plates 150 Watt Make -C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour . Dlp 6 Months . , Repairing Of Street Lights / High Mast Electrical Control Panel Replacing 3Pole Power Contactor Type Mnx-70 Cat Pt No . Cs97076 Including Material Charges But Excluding Labour . One In Each , Total 03 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Street Lights / High Mast Electrical Control Panel Replacing Timer Auto Light , Cat Pt . No . Ta916422 Including Material Charges But Excluding Labour . One In Each , Total 03 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Street Lights / High Mast Electrical Control Panel Replacing 3Pole Mccb , 100Amp Type Dno100c Including Material Charges But Excluding Labour . One In Each , Total 03 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Street Lights / High Mast Electrical Control Panel Replacing Isolator 4Way 40 Amps Including Material Charges But Excluding Labour . Six In Each , Total 03 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Replacing The Burnt / Damage Pvc 1 . 5 Sqmm Single Core Wire By Required Size Of Weather Proof Cable Excluding Labour . ( As Per The Requirement ) , Supply Of Pvc Xlpe Power Cable 1 . 1 Kv Grade 4X 35 Sqmm Excluding Labour , Supply Of Aerial Bunch Cable 4X35 Sqmm ( As Per The Site Requirement ) Including Material For Laying Of The Cables On Poles Excluding Labour Charges . , Laying Of One Number Pvc Insulated And Pvc Sheathed / Xlpe Power Cable 1 . 1 Kv Grade Of Size Up To 35 Sqmm Direct In Ground Including Excavation , Sand Cushioning , Protective Covering And Refilling The Trench Etc As Required . ( Dsr No . 7 . 1 . 1 ) , Pole Painting ( Inclduing Surface Cleaning And Primer Coat ) With Numbering On Poles ( As Per The Site Requirement ) Including Material And Labour Charges , Erection Of Metallic Pole 8Mtr To 11 Mtr ( 10Mtrs ) Height , In Cement Concrete 1:3:6 Foundation Including Excavation And Refilling Etc Including Labour And Material . ( Dsr 11 . 3 . 3 ) , Supply And Fixing Of Pre-Fab Water Proof Street Light Pole Boxes ( Powder Coated Chocolate Colour ) Size 300Mm X 00Mm X150mm Mada Of Crca Sheet Of Thickness 1 . 6Mm With Arrangement / Connection Of 3Phase Incoming And Outgoing Supply And 01 Nos 06Amp B-Curve Mcb Complete In All Respect , Wages / Labour Charges For Electricians To Be Depute At Respective Industrial Estates Of Siidcul For O&M Work ( For 8Months ) , Wages / Labour Charges For Helpers To Be Depute At Respective Industrial Estates Of Siidcul For O&M Work , Annual Maintenance Of Transformer Installed For Main Supply Of Street Lights Inclduing Dehydration Of Transformer Oil , Oti / Wti Calibration Etc . ( Once In Year ) , Annual Maintenance Of 15Kva , Dg Sets Installed At Siidcul Offices Inclduing Material And Labour With Replacemnet Of 1No 100Ah Battery . ( 02 Services Per Year ) , Annual Maintenance / Servicing Of Air Conditioners ( Ductable / Window / Split ) Installed At Siidcul Office Including Labour And Material With Repair Of O1 No Of Pcb And Repair Of 01 No Of Fan Motor Of Outdoor Unit , And Replacement Of 01 No Capacitor With R-22 Gas Refill ( , Inclduing Service ( For Total 12Nos ) ( Capacity 1 . 5Tr Each )