Operational And Maintenance Work Of Electrical Infra At Iie Haridwar Street Light Generator Transformer Servo Pump House Etc , Street Light Maintenance , Pump House Maintenace With Amc For Electrical Items , Lifting Vehical / Hydra Required For Overhead Street Lights Maintenance Purpose ( On Hire Basis ) ( 05Days / Month ) ( As Per The Requirement ) , Repair Of 60Watt Led Street Lights By Replacement Of Damaged / Diffused Drivers 60Watt Make-C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour Charges . Dlp 6 Month . , Repair Of 60Watt Led Street Lights By Replacement Of Damaged / Diffused Pcb Plates 60Watt Make-C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour Charges . Dlp 6 Month . , Repair Of 150Watt Led High Mast Lights By Replacement Of Damaged / Diffused Drivers 150Watt Make -C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour . Dlp 6 Month . , Repair Of Led High Mast Lights Replacing Damaged / Diffused Pcb Plates 150 Watt Make -C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour . Dlp 6 Month . , Repairing Of Street Lights / High Mast Electrical Control Panel Replacing 3Pole Power Contactor Type Mnx-70 Cat Pt No . Cs97076 Including Material Charges But Excluding Labour . One In Each , Total 03 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Street Lights / High Mast Electrical Control Panel Replacing Timer Auto Light , Cat Pt . No . Ta916422 Including Material Charges But Excluding Labour . One In Each , Total 03 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Street Lights / High Mast Electrical Control Panel Replacing 3Pole Mccb , 100Amp Type Dno100c Including Material Charges But Excluding Labour . One In Each , Total 03 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Street Lights / High Mast Electrical Control Panel Replacing Isolator 4Way 40 Amps Including Material Charges But Excluding Labour . Six In Each , Total 03 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Replacing The Burnt / Damage Pvc 1 . 5 Sqmm Single Core Wire By Required Size Of Weather Proof Cable Excluding Labour . ( As Per The Requirement ) , Supply Of Pvc Xlpe Power Cable 1 . 1 Kv Grade 4X 35 Sqmm Excluding Labour ( As Per The Requirement ) , Laying Of One Number Pvc Insulated And Pvc Sheathed / Xlpe Power Cable 1 . 1 Kv Grade Of Size Up To 35 Sqmm Direct In Ground Including Excavation , Sand Cushioning , Protective Covering And Refilling The Trench Etc As Required . ( Dsr No . 7 . 1 . 1 ) , Supply Of Aerial Bunch Cable 4X35 Sqmm ( As Per The Site Requirement ) Including Material For Laying Of The Cables On Poles Excluding Labour Charges . ( As Per The Requirement Raised By Engineer-In Charge ) , Erection Of Metallic Pole 8Mtr To 11 Mtr ( 10Mtrs ) Height , In Cement Concrete 1:3:6 Foundation Including Excavation And Refilling Etc Including Labour And Material . ( Dsr 11 . 3 . 3 ) ( As Per The Requirement Raised By Engineer-In Charge ) , Pole Painting ( Inclduing Surface Cleaning And Primer Coat ) With Numbering On Poles ( As Per The Site Requirement ) Including Material And Labour Charges , Wages / Labour Charges For Electricians To Be Depute At Respective Industrial Estates Of Siidcul For O&M Work ( For 8Months ) , Wages / Labour Charges For Helpers To Be Depute At Respective Industrial Estates Of Siidcul For O&M Work , Annual Maintenance Of Transformer Installed For Main Supply Of Street Lights Inclduing Dehydration Of Transformer Oil , Oti / Wti Calibration Etc . ( Once In Year ) , Annual Maintenance Of Dg Sets Installed At Siidcul Offices Or For Street Lights Back Up Energy Inclduing Material And Labour . ( 02 Services Per Year ) , Annual Maintenance Of Servo / Apfc Panel / Breaker Installed At Siidcul Offices Or For Street Lights Back Up Energy Inclduing Material And Labourand Labour . ( Once In Year ) , Annual Maintenance / Servicing Of Air Conditioners ( Ductable / Window / Split ) Installed At Siidcul Offices Including Labour And Material By Repair Of 2Nos Of Pcb Card On Each Of 2 . 5T & 5 . 5 / 8 . 5T ( Total 02Nos ) , By Replacement Of Compressor One Each Of 2 . 5T & 5 . 5T And 8 . 5T ( Total 3Nos ) , Repair Of Total 03Nos Of Fan Motor One Each Of 2 . 5T & 5 . 5T And 8 . 5T ( Total 3Nos ) With R-22 Gas Refill ( Total Ac Capacity Is 78 . 8 Tr ) , Comprehensive Annual Maintenance Of 20Kva Ups ( Eaton Make ) Installed At Siidcul Offices Including Labour And Material . ( Including Replacement Of 12V , 18Ah Total 28Nos Battery With Buy Back , Card Reapair Etc . ) , Repairing And Rewinding Of 25Hp Submersibile Tubewell Motor Complete In All Respect Including Lowering And Lifting , Labour & Material ( As Per Requirement ) , Repairing Of 25Hp , 8Stage Submersibile Pump By Repair / Replacement Of Pump-Bush , Sleeves , Necking Etc . Complete In All Respect Inclduing Labour & Material . ( As Per Requirement ) , Repairing Of Submericible Motor Electrical Control Panel Replacing 3Pole Power Contactor Type Mnx-70 Cat Pt No . Cs97076 Including Material Charges But Excluding Labour . One In Each , Total 03 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Submericible Motor Electrical Control Panel Replacing Timer Auto Light , Cat Pt . No . Ta916422 Including Material Charges But Excluding Labour . One In Each , Total 03 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Submericible Motor Electrical Control Panel Replacing 3Pole Mccb , 100Amp Type Dno100c Including Material Charges But Excluding Labour . One In Each , Total 03 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Submericible Motor Electrical Control Panel Replacing Isolator 4Way 40 Amps Including Material Charges But Excluding Labour . Six In Each , Total 03 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Replacement Of Electric Cable For Power Supply To Submersibile Motor Pump Complete In All Respect Including Material & Labour Charges . ( Size 3X6mm2 ) ( As Per Requirement ) , Rewinding & Repairing Of Water Supply 40Hp Motor With Taking Out And Fixing In Position Complete In All Respect Inclduing Material And Labour Charges . , Repairing Of Water Supply Motor Electrical Control Panel Replacing 3Pole Power Contactor Type Mnx-70 Cat Pt No . Cs97076 Including Material Charges But Excluding Labour . One In Each , Total 03 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Water Supply Motor Electrical Control Panel Replacing Timer Auto Light , Cat Pt . No . Ta916422 Including Material Charges But Excluding Labour . One In Each , Total 03 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Water Supply Motor Electrical Control Panel Replacing 3Pole Mccb , 100Amp Type Dno100c Including Material Charges But Excluding Labour . One In Each , Total 03 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Water Supply Motor Electrical Control Panel Replacing Isolator 4Way 40 Amps Including Material Charges But Excluding Labour . Six In Each , Total 03 Panels ( As Per The Requirement Raised By Engineer-In Charge ) , Replacement Of Electric Cable For Power Supply To Submersibile Motor Pump Complete In All Respect Including Material & Labour Charges . ( Size 3X6mm2 ) ( As Per Requirement )