}

Operation , Maintenance And Upkeep Of The 6 . 5Mld Water Scheme And Associated Electro-Mechanical Equipment And Routine And Preventive Maintenance Of Pumps And Motors And Electrical/Plumbing Systems Of Kinfra Park , Kakkanad For 3 Years, Kakkanad, Ernakulam-Kerala

Kerala Industrial Infrastructure Development Corporation has published Operation , Maintenance And Upkeep Of The 6 . 5Mld Water Scheme And Associated Electro-Mechanical Equipment And Routine And Preventive Maintenance Of Pumps And Motors And Electrical/Plumbing Systems Of Kinfra Park , Kakkanad For 3 Years. Submission Date for this Tender is 18-08-2020. Earth Moving Machinery Tenders in Kakkanad, Ernakulam Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

25082079
Operation , Maintenance And Upkeep Of The 6 . 5Mld Water Scheme And Associated Electro-Mechanical Equipment And Routine And Preventive Maintenance Of Pumps And Motors And Electrical/Plumbing Systems Of Kinfra Park , Kakkanad For 3 Years
Open Tender
Indian
Kerala
Kakkanad, Ernakulam
18-08-2020

Tender Details

Operation , Maintenance And Upkeep Of The 6 . 5Mld Water Scheme And Associated Electro-Mechanical Equipment And Routine And Preventive Maintenance Of Pumps And Motors And Electrical/Plumbing Systems Of Kinfra Park , Kakkanad For 3 Years , Engaging Qualified , Experienced Supervisor Male - ( Total 1 Shift Per Day ) , First Year , Second Year , Thrid Year , Engaging Qualified , Experienced Plant Operator ( Wtp ) 1 Each/Shift ( Male ) - Total - 2 Shifts Per Day ) , First Year , Second Year , Thrid Year , Engaging Qualified , Experienced Pump Operator - For Intake Well Site - 2 Each/ Shift ( Men ) - 4 Shifts/Day , First Year , Second Year , Thrid Year , Engaging Qualified , Experienced Helpers ( Male ) - For Wtp - 1 Each/ Shift ( Men ) - 2 Shifts/Day , First Year , Second Year , Thrid Year , Sweepers For Sweeping And Cleaning Of Floors , Walls , Roofs Etc Of Wtp And Two Raw Water Pump Houses And Yard Daily ( Man/Woman ) , First Year , Second Year , Thrid Year , Engaging Qualified , Experienced Pipeline Fitter For Intake Well Site & Wtp ( Men ) , First Year , Second Year , Thrid Year , Engaging Qualified , Experienced Electrician For Electrical Repair Works ( Men ) , First Year , Second Year , Thrid Year , Engaging Qualified , Experienced Painter For Painting Works ( Men ) , First Year , Second Year , Thrid Year , Engaging Qualified , Experienced Chemist ( Wtp-Kepip ) ( Men ) , First Year , Second Year , Thrid Year , Engaging Qualified , Experienced Plumber - For O & M Activities At Kepip , Wss ( Men ) , First Year , Second Year , Thrid Year , Clearing Grass And Removal Of The Rubbish Up To A Distance Of 50 M Outside The Periphery Of The Area Cleared , First Year , Second Year , Thrid Year , Lifting And Carefully Removing Rcc / Heavy Duty Ci Cover Slabs Of Manhole Chambers For Sluice Valves , Air Valves , Scour Valves Etc . Of The Pipelines Removing The Silt Deposit , If Any , Cleaning The Body Of The Valves Chamber Etc . And Replacing The Rcc Cover Slabs After The Work Carefully Without Any Damage Including Seating The Slabs In Cm 1:5 To Lines And Levels Etc . , First Year , Second Year , Thrid Year , Earth Work Excavation By Mechanical Means ( Hydraulic Excavator ) / Manual Means In Foundation Trenches Or Drains ( Not Exceeding 1 . 5M In Width Or 10 Sqm Or On Plan ) , Including Dressing Of Sides And Ramming Of Bottoms , Lift Upto 1 . 5M , Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed , Within A Lead Of 50 M . All Kinds Of Soil , First Year , Second Year , Thrid Year , Filling Available Excavated Earth ( Excluding Rock ) In Trenches , Plinth , Sides Of Foundations Etc . In Layers Not Exceeding 20 Cm In Depth , Consolidating Each Deposited Layer By Ramming And Watering , Lead Up To 50 M And Lift Up To 1 . 5 M . , First Year , Second Year , Thrid Year , Filling With Contractors Own Gravelly Soil /Sand Including Loading , Unloading , And Stacking For Measurements And Filling In Trenches , Plinth , Sides Of Foundations Etc . In Layers Not Exceeding 20 Cm In Depth , Consolidating Each Deposited Layer By Ramming And Watering , Lead Up To 50 M And Lift Up To 1 . 5 M . , First Year , Second Year , Thrid Year , Cutting Tarred Surface Of The Road And Disposal Of Debris As Per Direction Of Kepip . , First Year , Second Year , Thrid Year , Cutting 300 Mm Di Pipes Perpendicular To The Axis Of The Pipe In Trenches Using Di Pipe Cutters Wherever Required Without Causing Damages To The Pipe , First Year , Second Year , Thrid Year , Cutting 200 Mm Di Pipes Perpendicular To The Axis Of The Pipe In Trenches Using Di Pipe Cutters Wherever Required Without Causing Damages To The Pipe , First Year , Second Year , Thrid Year , Dismantling The Damaged 200 Mm D . I . / C . I Pipes After Taking Out The Pipes Manually/ Mechanical Means Breaking Lead Caulked Joints / Rubber Rings As The Case May Be Of Pipes And Specials At Site Within 50 M Lead As Per The Direction Of Engineer In Charge Including Stacking , First Year , Second Year , Thrid Year , Dismantling The Damaged 300 Mm D . I . / C . I Pipes After Taking Out The Pipes Manually/ Mechanical Means Breaking Lead Caulked Joints / Rubber Rings As The Case May Be Of Pipes And Specials At Site Within 50 M Lead As Per The Direction Of Engineer In Charge Including Stacking , First Year , Second Year , Thrid Year , Providing And Laying S&S Centrifugally Cast ( Spun ) / Ductile Iron 200 Mm Pipes Conforming To Is: 8329 ( Excluding Cost Of Pipe ) : , First Year , Second Year , Thrid Year , Providing And Laying S&S Centrifugally Cast ( Spun ) / Ductile Iron 300 Mm Pipes Conforming To Is: 8329 ( Excluding Cost Of Pipe ) : , First Year , Second Year , Thrid Year , Providing Joints To Centrifugally ( Spun ) 200 Mm Cast Iron Pipes Or Ductile Iron Pipes Including Testing Of Joints By Providing Lead Caulked Joints To Spun Iron Or C . I . Pipes And Specials Including Testing Of Joints But Excluding The Cost Of Pig Lead And Jointing Materials : , First Year , Second Year , Thrid Year , Providing Joints To Centrifugally ( Spun ) 300 Mm Cast Iron Pipes Or Ductile Iron Pipes Including Testing Of Joints By Providing Lead Caulked Joints To Spun Iron Or C . I . Pipes And Specials Including Testing Of Joints But Excluding The Cost Of Pig Lead And Jointing Materials : , First Year , Second Year , Thrid Year , Providing Flanged Joints To 200 Mm Double Flanged C . I . / D . I . Pipes And Specials , Including Testing Of Joints Excluding Cost Of Jointing Materials: , First Year , Second Year , Thrid Year , Providing Flanged Joints To 300 Mm Double Flanged C . I . / D . I . Pipes And Specials , Including Testing Of Joints Excluding Cost Of Jointing Materials: , First Year , Second Year , Thrid Year , Providing Push On Joints To 200 Mm Di Pipes Including Testing Of Joints Using Rubber Rings , First Year , Second Year , Thrid Year , Providing Push On Joints To 300 Mm Di Pipes Including Testing Of Joints Using Rubber Rings , First Year , Second Year , Thrid Year , Dismantling The Existing Sluice Valves From The Pipeline By Cutting And Removing The Rusted Nuts And Bolts , Disassembling The Valve Using Necessary Chain Pulley Block , Taking Out The Spindle , Shutter Etc . , Cleaning The Shutter , Shutter Groove With Sharp Chisel And Emrine Cloth , Applying Grease And Removing Old Packing Etc And Resetting And Assembling The Valve With New Packing Leather And Gland Packing Rope , Nuts And Bolts Including Servicing , Greasing And Resetting The Valve In The Pipeline . , First Year , Second Year , Thrid Year , Dismantling The Existing Foot Valve Of Motor/Pumps Upto 49 Hp , Taking It Out From The Tank Using Necessary Chain Pulley Block , And Rectifing Leakages Including Replacement Of Flaps And Resetting The Valve And Relaying Into The Tank , First Year , Second Year , Thrid Year , Dismantling The Existing Foot Valve Of Motor/Pumps Of 50 Hp And Above , Taking It Out From The Tank Using Necessary Chain Pulley Block , And Rectifing Leakages Including Replacement Of Flaps And Resetting The Valve And Relaying Into The Tank , First Year , Second Year , Thrid Year , Rectification Of Blockages In 300 Mm - 150Mm Pvc Pipelines By Exposing The Full Pipe Length , Dismantling Existing Cid Joint/Coupling And Removing The Pipe From The Trenches Making Special Wire Brushes And Fitting The Same In 8Mm Steel Road Having 10M Length And Inserting This Tool In The Blocked Pipeline In Both Direction And Scour The Line By Controlling Valves And Repeat The Process Till Free Flow Of Water Is Obtained , Including Bailing Out Water , Shoring The Sides Of Trenches , Refitting The Dsimantled Pipe After Cleaning , Using Dismantled Cid Joints And New Rubber Rings Etc . Complete Excluding Earthwork Excavation And Filling Which Will Be Paid Seperately . , First Year , Second Year , Thrid Year , Rectification Of Blocka

Key Value

Document Fees
INR 2975 /-
EMD
INR 50000.0 /-
Tender Value
INR 79.12 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail