}

Miscellaneous Electrical Works In Cd-Township And Phase 1 2020-21 Miscellaneous Electrical Works In Cd-TownshipAnd Phase 1 2020-21, Ambalamedu-Kerala

Government Departments has published Miscellaneous Electrical Works In Cd-Township And Phase 1 2020-21 Miscellaneous Electrical Works In Cd-TownshipAnd Phase 1 2020-21. Submission Date for this Tender is 22-07-2020. Clothing Accessories Tenders in Ambalamedu Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

24823092
Miscellaneous Electrical Works In Cd-Township And Phase 1 2020-21 Miscellaneous Electrical Works In Cd-TownshipAnd Phase 1 2020-21
Open Tender
Indian
Kerala
Ambalamedu
22-07-2020

Tender Details

Miscellaneous Electrical Works In Cd-Township And Phase 1 2020-21 Miscellaneous Electrical Works In Cd-TownshipAnd Phase 1 2020-21 , Miscellaneous Electrical Works In Cd-Township & Phase 1 2020-21 , Supply Of 11 Kv , Xlpe , 3 X 185 Sq . Mm End Termination Kit . The Scope Of Work Includes Supply Of 11 Kv , 3 X 185 Sq . Mm End Termination Kit With All Accessories , End Termination Of Ht Cable . The Scope Of Work Includes End Termination Of Ht Xlpe Cables Of Size 3 X 185 Sq . Mm . End Termination Shall Be Done By An Approved Cable Jointer . Scope Of Work Also Includes Preparation Of Cable And Site For Carrying Out The Work . , Supply Of 11 Kv , Xlpe , 3 X 185 Sq . Mm Straight Jointing Kit . The Scope Of Work Includes Supply Of 11 Kv , 3 X 185 Sq . Mm Straight Jointing Kit With All Accessories . , Straight Jointing Of Ht Cable . The Scope Of Work Includes Straight Jointing Of 11 Kv , Xlpe , Of Size 3 X 400 Sq . Mm . Cable Jointing Shall Be Done By An Approved Cable Jointer . Scope Of Work Also Includes Preparation Of Cable And Site , Proper Placement Of Cable , Placing Of Joint And All Other Works Required For Carrying Out The Work . , Laying Of Armoured Cable Upto And Including 10 Sq . Mm . The Scope Of Work Includes Laying Of Armoured/ Unarmoured Cables Of All Types And Size Upto And Including 10 Sq . Mm . In Cable Trenches . , Laying Of Armoured Cable Of Size 16-95 Sq . Mm . The Scope Of Work Includes Laying Of Armoured/Unarmoured Cables Of All Types And Size 16 Sq . Mm Upto And Including To 95 Sq . Mm . In Cable Trenches . , Laying Of Armoured Cable Of Size 120-240 Sq . Mm . The Scope Of Work Includes Laying Of Armoured Cables Of Size 120 Sq . Mm Upto And Including To 240 Sq . Mm . In Cable Trenches . , Laying Of Armoured Cable Of Size 300-400 Sq . Mm . The Scope Of Work Includes Laying Of Armoured Cables Of Size 300Sq . Mm Upto And Including To 400 Sq . Mm . In Cable Trenches . , Otdr Test Of Ofc . The Scope Of Work Includes Otdr Test Of Optical Fibre Cable Per Core . , Splicing Of Ofc . The Scope Of Work Includes Splicing Of 12 Core Optical Fibre Cable . The Contractor Should Ensure The Continuity Of The Joint With Suitable Testing Equipments . , Supply Of Ofc Jointing Kit . The Scope Of Work Includes Supply Of Cable Jointing Kit Suitable For 12 Core Ofc . , Digging Of Earth . The Scope Of Work Includes Digging And Removal Of Soil Manually For Various Purposes Such As Locating Cable Faults /Re-Routing Of Cables/Redrawing Old Cables From Trenches/Preparation Of Site For Cable Jointing Etc . And Then Filling Back The Digged Portion And Consolidated With Soil After Completing The Works . , Excavation Of Trench For Cable Laying: The Scope Of Work Includes Excavation Of Under Ground Cable Trench Of Width 300 Mm And Depth Not Less Than 600 Mm , Providing Country Bricks Over The Top Of The Cable And Then Filling Back The Trench After Laying The Cable And Consolidated With Soil . , Clearing Of Bush Growth In Substations:- The Scope Of Work Includes Cleaning Works In And Around The Substation Premises And Over The Substation Fencing In Township And Utility Substations In Phase1 Once In 6 Months By Cutting And Removing The Bush Growth . The Work Includes Removing The Cow Webs , Debris , Dust Etc . Tools For The Work Shall Be Brought By The Contractor . , Clearing Of Bush Growth Around Feeder Pillars:- The Scope Of Work Includes Clearing The Bush Growth Around The Feeder Pillars Once In Six Months By Cutting And Removing The Bush Growth . The Work Includes Removing The Cow Webs , Debris Etc . Tools For The Work Shall Be Brought By The Contractor . , Unskilled Labour Assistance For Cleaning Of 110 Kv Yard Equipments , Earth Umbrella , 11 Kv Voltas & Crompton Switch Gears In Thermal Plant Once In An Year . , Revamping Of Earth Pits . The Scope Of Work Includes Construction Of Earth Pit Chamber And Concrete Covering Slabs For The Earth Pits In Township And Phase1 Area . The Chamber Shall Be Neatly Plastered And The Work Includes Removing The Debris And Cleaning The Earth Pits , Checking The Tightness Of Earth Connections , Replacing The Corroded Nuts & Bolts Etc . The Scope Of Work Includes Supply Of Materials Such As Brick , M-Sand , Rubbles And Cement Required For The Work . However The Nuts & Bolts , Washers And Earth Bus Bars Required For The Work Shall Be Supplied By Fact

Key Value

Document Fees
Refer document
EMD
INR 12000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail