Lowering And Laying Of New Hdpe Pipeline For Drinking Water Supply As Per Requirement On Yearly Basis For Shrirampur Municipal Council , Excavation For Foundation / Pipe Trenches In Earth , Soils Of All Types , Sand , Gravel And Soft Murum , Including Removing The Excavated Material Upto A Distance Of 50 Metres And Lifts As Below , Stacking And Spreading As Directed , Manual Dewatering , Preparing The Bed For Foundation And Excluding Backfilling , Etc . Complete . Lift 0 To 1 . 5M ( Mjp Dsr 2019-20 Section E Item No . 1 ) , Excavation For Foundation / Pipe Trenches In Hard Murum And Boulders , W . B . M . Road Including Removing The Excavated Material Upto A Distance Of 50 M Beyond The Area And Lifts As Below , Stacking And Spreading As Directed By Engineer-In-Charge , Normal Dewatreing , Preparing The Bed For Foundation And Excluding Backfilling , Etc . Complete . ( Mjp Dsr 2019-20 Section E Item No . 3 ) , Excavation For Foundation / Pipe Trenches In Soft Rock And Old Cement And Lime Masonry Foundation Asphalt Road Including Removing The Excavated Material Upto A Distance Of 50 M Beyond Area And Lifts As Below , Stacking As Directed By Engineer-In-Charge , Normal Dewatering , Preparing The Bed For Foundation And Excluding Backfilling , Etc . Complete . ( Mjp Dsr 2019-20 Section E Item No . 5 ) , Providing And Supplying In Standard Lengths Polyethelene Pipes , Confirming To I . S . 4984 / 14151 / 12786 / 13488 With Necessary Jointing Material Like Mechanical Connectors I . E . Thread/Insert Joint / Quick Release Coupler Joint/ Compression Fitting Joint Or Flanged Joint , Including All Local & Central Taxes , Transportation & Freight Charges , Inspection Charges , Loading / Unloading Charges , Conveyance To The Departmental Stores / Site & Stacking The Same In Closed Shade Duely Protecting From Sunrays & Rains , Excluding Gst Levied By Gi & Gom In All Respect Etc . Complete . ( Mjp Dsr 2019-20 Section I ( X ) Item No . 1 A A ) , Pe 100 Dia 110 Mm Hdpe Pipes , Pe 100 Dia 160 Mm Hdpe Pipes , Filling In Plinth And Floors Murum Bedding In Trenches With Approved Murum From Excavated Materials From Foundation 15Cm To 20Cm Layers Including Watering And Compaction Complete . ( Mjp Dsr 2019-20 Section E Item No . 16 ) , Lowering Laying And Jointing Hdpe /Mdpe Pipes In Proper Position Including All Specials By Compression Fitting /Electrofusion And But Fusion Jointing Procedure Including Hydraulic Testing As Per Relevent Is Code Complete With All Materials For Jointing Procedures Like Electrofusion Machine , Electric Mirror/ Heater/Butt Fusion Welding Machine With Hydraulic Jack , Top Laoding Clamp Etc Pump And Accessories For Hydraulic Testing And All Labours As Directed By Engineer Incharge As Per Is - 7634 Part Ii . ( Mjp Dsr2019-20 Section I ( X ) Item No . 2 ) , Pe 100 Dia 110 Mm Hdpe Pipes , Pe 100 Dia 160 Mm Hdpe Pipes , Refilling The Trenches With Available Excavated Stuff With Soft Material First Over Pipeline And Then Hard Material In 15 Cm Layers With All Leads And Lifts Including Consolidation , Surcharging , Etc . Complete . ( Mjp Dsr 2019-20 Section E Item No . 15 ) , Providing And Supplying Double Flange Sluice Valves Confirming For Is 14846 Including Warn Gear Arrangement As Per Test Pressure Stainless Steel Spindle Caps Including Inspection Charges , Transportation Upto Departmetal Store , Unloading , Stacking Excluding Gst Levied By Goi & Gom In All Respect Etc Complete . ( Mjp Dsr 2019-20 Section I ( Xii ) Item No . 2 A A ) , 100Mm Sluice Valve-Pn-1 , 150Mm Sluice Valve-Pn-1 , Lowering , Laying , Jointing In Position Following Cidf Reflux , Butterfly Valves And Sluice Valves Including Cost Of All Labors Jointing Material Including Nutbolts And Giving Satisfactory Hydraulic Testing Etc Complete ( Rates For All Class Of Valves ) ( Mjp Dsr 2019-20 Section I ( Xii ) Item No . 4 ) , 100Mm Sluice Valve-Pn-1 , 150Mm Sluice Valve-Pn-1 , Making Cross Connection To Existing Distribution Main Of Any Type Including Excavation , Breaking And Removing Exiting Pipes , Lowering , Laying Of Specials And Pipes In Their Position , Refilling , Closing The Water Supply In That Area , Dewatering And Restarting The Water Supply , Etc . Complete As Directed By Engineer-In-Charge For Following Diameters Of Existing Pipeline , Irrespective Of Diameter Of Branch Line ( The Number Of Joints Involved Will Be Paid Separately Depending Upon The Nature Of Joints And Required Pipes , Valves And Specials Will Be Supplied Free Of Cost At Stores ) . ( Mjp Dsr 2019-20 Section H Item No . 10 ) , 100Mm , 150Mm , 200Mm , 250Mm , 300Mm , 350Mm , Hdpe Pipe Specials/Joints Required For Making Cross Connection , Repairing Of Damaged Pipeline Etc . % Of Pipe Cost