}

Earth Work Excavation In Clayey Soil For Foundation Of Rcc Partition Wall At Inside Of Hup Pond Including Shoring, Shuttering, Strutting, Earth Bund And Driving Departmentally Ms Piles , Wherever Required, Levelling And The Bottom Of Trench To Corr-Kerala

Indian Rare Earths Limited has published Earth Work Excavation In Clayey Soil For Foundation Of Rcc Partition Wall At Inside Of Hup Pond Including Shoring, Shuttering, Strutting, Earth Bund And Driving Departmentally Ms Piles , Wherever Required, Levelling And The Bottom Of Trench To Corr. Submission Date for this Tender is 26-06-2020. Coats and Jackets Tenders in Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

24556271
Earth Work Excavation In Clayey Soil For Foundation Of Rcc Partition Wall At Inside Of Hup Pond Including Shoring, Shuttering, Strutting, Earth Bund And Driving Departmentally Ms Piles , Wherever Required, Levelling And The Bottom Of Trench To Corr
Open Tender
NCB
Kerala
26-06-2020

Tender Details

Earth Work Excavation In Clayey Soil For Foundation Of Rcc Partition Wall At Inside Of Hup Pond Including Shoring, Shuttering, Strutting, Earth Bund And Driving Departmentally Ms Piles , Wherever Required, Levelling And The Bottom Of Trench To Correct Line And Levels, Back Filling, Pumping If Necessary And Depositing The Spoil Earth Within A Lead Of 50 M And Lift Of 2 M As Directed By The Company Authorities Etc. Including All Labour Charges, Hire Charges For Tools & Plants, Pump Set Etc. Complete As Per Standard Specification. Cement Concrete 1:5:10 Using 40Mm And Down Grade Stone Aggregate For Foundation Base Of Rcc Partition Wall Inside Of Hup Pond After Levelling And Consolidating The Trenches, Including All Cost Conveyance Of Materials Hire Charges For Tools And Plants, Hire And Labour For Shuttering, All Labour Charges For , Mixing, Laying, Ramming, Curing Etc. Complete As Per Standard Specification But Excluding Cost Of Cement Reinforced Cement Concrete Graded Mix 1:3:6 For Rcc Partition Wall At Inside Of Hup Pond Etc. By Using 60 % 40Mm And 40% 20Mm Graded Stone Aggregate Including All Cost & Conveyance Of Materials, Loading & Unloading Charges, Hire Charges For Shuttering / Form Work, Labour Charges For Mixing, Laying, Ramming, Watering & Curing, Hire Charges For Mixer Machine, Vibrator Etc. At All Heights And Levels But Excluding Cost Of Cement & M.S Bar Etc. Complete As Per Standard Specification Ms Reinforcement ( Fe 500 ) For Rcc Partition Wall At Inside Of Hup Pond Bent, Tied And Placed In Position For Rcc Works At All Heights & Levels Including All Cost And Conveyance Of Ms Bars & Binding Wire, Loading Unloading Charges, , All Labour Charges For Straightening, Cutting, Bending, Binding With Approved Annealed Binding Wires Etc. Complete As Per Std. Specification Plastering In Cement Mortar 1:4, 12 Mm Thick One Coat For Rcc Partition Wall At Inside Of Hup Pond At All Height And Levels Floated Hard And Trowelled Smooth Including All Cost A

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail