| 1 | 1 | Schedule A | | | |
|---|
| 2 | 1.1 | Submission and approval of Surveys, Soil Investigations ,Designs, Working Drawings including all layout, sections, typical details, Shop Drawings, as Built drawings ..etc complete for all components of works \"Design, supply, construction, installation, testing and commissioning of Faecal Sludge Treatment Plant (FSTP) of 2.5 KLD capacity at the Location of Lalpani STP with all contingent civil, electrical, mechanical, piping and instrumentation works with three months trial run and Operation & Maintenance for Five Years including One-year defect liability period at Shimla, Himachal Pradesh.\". Contractor shall submit working Drawing and Implementation schedule as per Priority given by Engineer-In-Charge for approval. Payment shall be released on Prorata basis only after approval of working Drawings as per implementation schedule | | 1 | Lumpsum |
|---|
| 3 | 2 | Schedule B | | | |
|---|
| 4 | 2.1 | “Design, supply, construction, installation, testing and commissioning of Faecal Sludge Treatment Plant (FSTP) of 2.5 KLD capacity at the Location of Lalpani STP with all contingent civil, electrical, mechanical, piping and instrumentation works with three months trial run and Operation & Maintenance for Five Years including One-year defect liability period at Shimla, Himachal Pradesh.” This item is inclusive of Design and Construction of all allied works, Design approval from IIT, Site Development including any cutting, filling, grading etc. at site, All approach Roads / Access to Site, Piling/Anchoring with all labour, material as per Standard CPWD/HP-IPH specifications and design approved by engineer in charge including all taxes (GST and other) and levies etc\n | | 2.5 | KLD |
|---|
| 5 | 3 | Schedule C | | | |
|---|
| 6 | 3.1 | Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for 2.5 KLD Faecal Sludge Treatment Plant For 1st year O&M. | | 12 | Per Month |
|---|
| 7 | 3.2 | Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for 2.5 KLD Faecal Sludge Treatment Plant For 2nd year O&M. | | 12 | Per Month |
|---|
| 8 | 3.3 | Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for 2.5 KLD Faecal Sludge Treatment Plant For 3rd year O&M. | | 12 | Per Month |
|---|
| 9 | 3.4 | Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for 2.5 KLD Faecal Sludge Treatment Plant For 4th year O&M. | | 12 | Per Month |
|---|
| 10 | 3.5 | Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for 2.5 KLD Faecal Sludge Treatment Plant For 5th year O&M. | | 12 | Per Month |
|---|