}

Enit For Hiring Of Tentage Articles Enit No. 7 Of 2020 Dated 06-06-2020, JAMMU DIVISION-Jammu And Kashmir

Department Of Tourism has published Enit For Hiring Of Tentage Articles Enit No. 7 Of 2020 Dated 06-06-2020. Submission Date for this Tender is 20-06-2020. Tent Tenders in JAMMU DIVISION Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

24514072
Enit For Hiring Of Tentage Articles Enit No. 7 Of 2020 Dated 06-06-2020
National Competitive Bid
NCB
Jammu And Kashmir
Jammu Division
20-06-2020

Tender Details

Enit For Hiring Of Tentage Articles Enit No. 7 Of 2020 Dated 06-06-2020 - 2 Temporary Iron Structured Water Proof Tentage Complete ( Rate For Per Sq. Ft. Of Ground Area Covered ) 3 Temporary Iron Structured Tentage Complete ( Rate For Per Sq. Ft. Of Ground Area Covered ) 4 Shamiyana ( Water Proof ) ( 15’X15’ ) 5 Shamiyana ( Water Proof ) ( 30X30’ ) 6 Shamiyana ( Normal ) ( 15’X15’ ) 7 Shamiyana ( Normal ) ( 30X30’ ) 8 Kanath ( 6X15 ) 9 Curtain ( 15’ X 10’ ) 10 Kaleen ( Central Carpet ) ( 8’ X 5’ ) 11 Kaleen ( Central Carpet )   ( 15’X5’ ) 12 Tarpal ( 15’X 15’ ) 13 Farshi Chadder ( White ) ( Rate Per Sq. Ft ) 14 Farshi Chadder ( Printed ) ( Rate Per Sq. Ft ) 15 Masnand ( 12’ X 12’ ) 16 Masnand ( ( 15’ X 15’ ) 17 Passage Carpet ( Runner ) ( 3’Width ) In Rft 18 Passage Carpet ( Runner ) ( 6’Width ) In Rft 19 Dunlop Chair 20 Plastic Chair 21 Chair Cover / Per Piece ( White ) 22 Chair Cover ( White ) With Ribbon ( Color As Per Requirement ) / Per Piece 23 Providing Of Signages ( Rate Per Sft ) 24 Providing Of Lighting Lamp With Material 25 Quilts ( Double ) 26 Quilts ( Single ) 27 Blankets ( Double ) 28 Blankets ( Single ) 29 Bed Sheet ( Single ) 30 Bed Sheet ( Double ) 31 Providing & Installation Of Complete Stage Covered With Matting, Farash Chadder, Drugget, Frill And Stairs On Two Sides Per Sft 4 ½ Feet High 32 Providing & Installation Of Complete Stage Covered With Matting, Farash Chadder, Drugget, Frill And Stairs On Two Sides Per Sft 3 ½ Feet High 33 Providing & Installation Of Complete Stage Covered With Matting, Farash Chadder, Drugget, Frill And Stairs On Two Sides Per Sft 2 ½ Feet High 34 Building Illumination With Ribbons ( Border Niwar Patti ) ( Rate In Rft ) 35 Building Illumination With Ribbons And Special Stripes ( Rft ) 36 Pillows Per Piece ( Flat ) 37 Round Pillow Per Piece 38 Sofa Set For Vips 02 Seater ( Canvas / Velvet ) 39 Sofa Set For Vips Set 03 Seater ( With Cushions Latherite ) 40 Sofa Set Normal 02 Seater ( Canvas / Velvet ) 41 Sofa Set Normal 03 Seater ( With Cusions Latherite ) 42 Mattresses ( 6’X 3’X4’ ) Coir 43 Mattresses ( 6’X 3’X4’ ) Foam 44 Installation And Providing Of Gate Fully Decorated With Chuni, Balooning ( Rate Should Be Quoted In Rft ) . 45 Installtion And Providing Of Gate Fully Decorated With Chuni, Balooning & Fresh Flowers. Rate Should Be Quoted In Rft. 46 Installtion And Providing Of Gate Fully Decorated With Chuni, Balooning Fresh & Artificial Flowers.Rate Should Be Quoted In Rft 47 Table Sun Mica ( Standard Size ) 48 Table Sun Mica ( Standard Size With Cover And Jhallar 49 Centre Table For Sofa Wooden Top 50 Centre Table For Sofa Glass Top 51 Round Tables Wooden 52 Round Tables Plastic 53 Red / Green Carpet ( Per Sft ) 54 Boquets Artificial With 10 Artificial Flower ( Normal ) 55 Boquets Fresh Flowers ( 10 Fresh Flowers, Red Roses ) 56 Complete Wrought Iron Frame At Food Counters 57 Stalls ( Shell Scheme ) Complete 2Mt.X2mt. 58 Stalls ( Shell Scheme ) Complete 2Mt.X3mt 59 Stalls ( Shell Scheme ) Complete 2Mt.X6mt 60 Tube Light ( 40Watt ) 61 Generator 10Kw 62 Generator 25 Kw 63 Generator  62 Kw 64 Pedestal Fan 65 Mist Fan 66 Meta Lights 250 Watt 67 Meta Lights 400 Watt 68 Meta Lights 800 Watt 69 Barricades & Fencing ( M.S. Pipes ) Per Meter 70 Fire Pot With Support Charcoal 71 Heat Pillar 2000 Watt 72 Heat Pillar 3000Watt 73 Heat Pillar 5000Watt 74 A / C 2 Tonne Pedestal 75 A / C 4 Tonne Padestal 76 Dust Bin ( Steel Bucket ) With Stand ( Capacity 10 Kg ) 77 Dust Bin ( Steel Bucket ) With Stand ( Capacity 25Kg ) 78 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 79 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 80 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 81 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 82 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 83 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 84 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 85 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 86 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 87 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 88 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 89 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 90 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 91 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 92 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 93 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 94 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 95 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 96 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 97 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 98 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 99 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 100 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 101 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 102 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 103 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 104 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 105 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 106 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 107 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 108 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 109 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 110 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 111 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 112 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 113 Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete 114 Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete

Key Value

Document Fees
INR 500 /-
EMD
INR 20000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail