Sales : +91-777 804 8217
| Schedule of quantities to accompany the Tender for the work of Package-71- Improvements of Government roads in Paramakudi (Highways) C&M Sub-Division including CD works and Upkeeping for a period of 60 MonthsLIST OF ROAD ATTACHED IN PRICE BID DOCUMENT. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed of the work and including all other incidental charges etc., complete as per MORTH Specification no.111,112,202 | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.01 | ROAD A | 3324.87 | Square Metre | |
| 3 | 1.02 | ROAD B | 2743.33 | Square Metre | |
| 4 | 1.03 | ROAD C | 3752.67 | Square Metre | |
| 5 | 1.04 | ROAD D | 1804.89 | Square Metre | |
| 6 | 1.05 | ROAD E | 2523.23 | Square Metre | |
| 7 | 1.06 | ROAD F | 2492.25 | Square Metre | |
| 8 | 1.07 | ROAD G | 3260.58 | Square Metre | |
| 9 | 1.08 | ROAD H | 182.5 | Square Metre | |
| 10 | 1.09 | ROAD I | 127.5 | Square Metre | |
| 11 | 1.1 | ROAD J | 130.17 | Square Metre | |
| 12 | 1.11 | ROAD K | 118.75 | Square Metre | |
| 13 | 1.12 | ROAD L | 156.25 | Square Metre | |
| 14 | 1.13 | ROAD M | 150 | Square Metre | |
| 15 | 1.14 | ROAD N | 147.5 | Square Metre | |
| 16 | 1.15 | ROAD O | 127.5 | Square Metre | |
| 17 | 1.16 | ROAD P | 295 | Square Metre | |
| 18 | 1.17 | ROAD Q | 295 | Square Metre | |
| 19 | 1.18 | ROAD R | 295.17 | Square Metre | |
| 20 | 1.19 | ROAD S | 120 | Square Metre | |
| 21 | 2 | Advance patch work using 45.00 mm IRC size HBG metal for making the pot holes and patching using VG10 grade bitumen including mixing at the rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc., complete. as per MORTH Vth Revision Specification No. 111, 112, 501, 900, 3004 | |||
| 22 | 2.01 | ROAD H | 33.42 | Cubic Metre | |
| 23 | 2.02 | ROAD I | 10.62 | Cubic Metre | |
| 24 | 2.03 | ROAD J | 34.91 | Cubic Metre | |
| 25 | 2.04 | ROAD K | 17.5 | Cubic Metre | |
| 26 | 2.05 | ROAD L | 25.09 | Cubic Metre | |
| 27 | 2.06 | ROAD M | 23.77 | Cubic Metre | |
| 28 | 2.07 | ROAD N | 19.75 | Cubic Metre | |
| 29 | 2.08 | ROAD O | 14.97 | Cubic Metre | |
| 30 | 2.09 | ROAD P | 18.26 | Cubic Metre | |
| 31 | 2.1 | ROAD Q | 14 | Cubic Metre | |
| 32 | 2.11 | ROAD R | 21.76 | Cubic Metre | |
| 33 | 2.12 | ROAD S | 8.06 | Cubic Metre | |
| 34 | 3 | Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406 of MORTH Vth Revision Specification no.111,112,406,900 | |||
| 35 | 3.01 | ROAD A | 1606.72 | Cubic Metre | |
| 36 | 3.02 | ROAD B | 984.28 | Cubic Metre | |
| 37 | 3.03 | ROAD C | 1337.86 | Cubic Metre | |
| 38 | 3.04 | ROAD D | 824.48 | Cubic Metre | |
| 39 | 3.05 | ROAD E | 772.75 | Cubic Metre | |
| 40 | 3.06 | ROAD F | 1168.89 | Cubic Metre | |
| 41 | 3.07 | ROAD G | 1516.27 | Cubic Metre | |
| 42 | 3.08 | ROAD H | 54.75 | Cubic Metre | |
| 43 | 3.09 | ROAD I | 87.37 | Cubic Metre | |
| 44 | 3.1 | ROAD J | 39.05 | Cubic Metre | |
| 45 | 3.11 | ROAD K | 60.13 | Cubic Metre | |
| 46 | 3.12 | ROAD L | 46.88 | Cubic Metre | |
| 47 | 3.13 | ROAD M | 45.01 | Cubic Metre | |
| 48 | 3.14 | ROAD N | 44.26 | Cubic Metre | |
| 49 | 3.15 | ROAD O | 38.26 | Cubic Metre | |
| 50 | 3.16 | ROAD P | 88.52 | Cubic Metre | |
| 51 | 3.17 | ROAD Q | 88.52 | Cubic Metre | |
| 52 | 3.18 | ROAD R | 88.55 | Cubic Metre | |
| 53 | 3.19 | ROAD S | 36.01 | Cubic Metre | |
| 54 | 4 | Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification no.111,112, 501,502,900- over WMM | |||
| 55 | 4.01 | ROAD A | 10527.2 | Square Metre | |
| 56 | 4.02 | ROAD B | 8291.4 | Square Metre | |
| 57 | 4.03 | ROAD C | 11380.8 | Square Metre | |
| 58 | 4.04 | ROAD D | 5476.07 | Square Metre | |
| 59 | 4.05 | ROAD E | 7648.62 | Square Metre | |
| 60 | 4.06 | ROAD F | 7713.59 | Square Metre | |
| 61 | 4.07 | ROAD G | 10026.7 | Square Metre | |
| 62 | 4.08 | ROAD H | 547.5 | Square Metre | |
| 63 | 4.09 | ROAD I | 628.1 | Square Metre | |
| 64 | 4.1 | ROAD J | 390.5 | Square Metre | |
| 65 | 4.11 | ROAD K | 478.75 | Square Metre | |
| 66 | 4.12 | ROAD L | 468.75 | Square Metre | |
| 67 | 4.13 | ROAD M | 450 | Square Metre | |
| 68 | 4.14 | ROAD N | 442.5 | Square Metre | |
| 69 | 4.15 | ROAD O | 382.5 | Square Metre | |
| 70 | 4.16 | ROAD P | 885 | Square Metre | |
| 71 | 4.17 | ROAD Q | 885 | Square Metre | |
| 72 | 4.18 | ROAD R | 885.5 | Square Metre | |
| 73 | 4.19 | ROAD S | 360 | Square Metre | |
| 74 | 5 | Tack coat - Providing and applying tack coat with bitumen emulsion(RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900- over granular surfaces treated with primer | |||
| 75 | 5.01 | ROAD A | 10527.2 | Square Metre | |
| 76 | 5.02 | ROAD B | 8291.4 | Square Metre | |
| 77 | 5.03 | ROAD C | 11380.8 | Square Metre | |
| 78 | 5.04 | ROAD D | 5476.07 | Square Metre | |
| 79 | 5.05 | ROAD E | 7648.62 | Square Metre | |
| 80 | 5.06 | ROAD F | 7713.59 | Square Metre | |
| 81 | 5.07 | ROAD G | 10026.7 | Square Metre | |
| 82 | 5.08 | ROAD H | 547.5 | Square Metre | |
| 83 | 5.09 | ROAD I | 628.1 | Square Metre | |
| 84 | 5.1 | ROAD J | 390.5 | Square Metre | |
| 85 | 5.11 | ROAD K | 478.75 | Square Metre | |
| 86 | 5.12 | ROAD L | 468.75 | Square Metre | |
| 87 | 5.13 | ROAD M | 450 | Square Metre | |
| 88 | 5.14 | ROAD N | 442.5 | Square Metre | |
| 89 | 5.15 | ROAD O | 382.5 | Square Metre | |
| 90 | 5.16 | ROAD P | 885 | Square Metre | |
| 91 | 5.17 | ROAD Q | 885 | Square Metre | |
| 92 | 5.18 | ROAD R | 885.5 | Square Metre | |
| 93 | 5.19 | ROAD S | 360 | Square Metre | |
| 94 | 6 | Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900 - over bituminous surfaces | |||
| 95 | 6.01 | ROAD H | 6636 | Square Metre | |
| 96 | 6.02 | ROAD I | 7117.5 | Square Metre | |
| 97 | 6.03 | ROAD J | 10516 | Square Metre | |
| 98 | 6.04 | ROAD K | 6429.38 | Square Metre | |
| 99 | 6.05 | ROAD L | 7019.92 | Square Metre | |
| 100 | 6.06 | ROAD M | 7067.6 | Square Metre | |
| 101 | 6.07 | ROAD N | 7261.11 | Square Metre | |
| 102 | 6.08 | ROAD O | 4636.3 | Square Metre | |
| 103 | 6.09 | ROAD P | 2865 | Square Metre | |
| 104 | 6.1 | ROAD Q | 2865 | Square Metre | |
| 105 | 6.11 | ROAD R | 4428.7 | Square Metre | |
| 106 | 6.12 | ROAD S | 4911.25 | Square Metre | |
| 107 | 7 | Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.300 kg per sqm on the Existing Dry Lean Cement surface cleaned with mechanical broom as per clause 503 - Over Dry Lean Cement Surface | |||
| 108 | 7.01 | ROAD A | 3.75 | Square Metre | |
| 109 | 7.02 | ROAD B | 3.75 | Square Metre | |
| 110 | 7.03 | ROAD C | 7.5 | Square Metre | |
| 111 | 7.04 | ROAD D | 3.75 | Square Metre | |
| 112 | 7.05 | ROAD E | 7.5 | Square Metre | |
| 113 | 7.06 | ROAD F | 7.5 | Square Metre | |
| 114 | 7.07 | ROAD G | 76.88 | Square Metre | |
| 115 | 7.08 | ROAD H | 72.75 | Square Metre | |
| 116 | 7.09 | ROAD J | 38.5 | Square Metre | |
| 117 | 7.1 | ROAD L | 16.13 | Square Metre | |
| 118 | 7.11 | ROAD R | 223.3 | Square Metre | |
| 119 | 8 | Bituminous Macadam Providing and laying bituminous macadam with Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade- 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification no.111,112,501,503,900 - Grading II | |||
| 120 | 8.01 | ROAD A | 526.56 | Cubic Metre | |
| 121 | 8.02 | ROAD B | 414.75 | Cubic Metre | |
| 122 | 8.03 | ROAD C | 569.42 | Cubic Metre | |
| 123 | 8.04 | ROAD D | 274 | Cubic Metre | |
| 124 | 8.05 | ROAD E | 382.81 | Cubic Metre | |
| 125 | 8.06 | ROAD F | 386.06 | Cubic Metre | |
| 126 | 8.07 | ROAD G | 501.53 | Cubic Metre | |
| 127 | 8.08 | ROAD H | 27.38 | Cubic Metre | |
| 128 | 8.09 | ROAD I | 31.41 | Cubic Metre | |
| 129 | 8.1 | ROAD J | 19.53 | Cubic Metre | |
| 130 | 8.11 | ROAD K | 23.95 | Cubic Metre | |
| 131 | 8.12 | ROAD L | 23.44 | Cubic Metre | |
| 132 | 8.13 | ROAD M | 22.5 | Cubic Metre | |
| 133 | 8.14 | ROAD N | 22.13 | Cubic Metre | |
| 134 | 8.15 | ROAD O | 19.12 | Cubic Metre | |
| 135 | 8.16 | ROAD P | 44.25 | Cubic Metre | |
| 136 | 8.17 | ROAD Q | 44.25 | Cubic Metre | |
| 137 | 8.18 | ROAD R | 44.29 | Cubic Metre | |
| 138 | 8.19 | ROAD S | 18 | Cubic Metre | |
| 139 | 9 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specificationno.111,112,507, 900 complete in all respects - Grading II | |||
| 140 | 9.01 | ROAD A | 315.93 | Cubic Metre | |
| 141 | 9.02 | ROAD B | 248.85 | Cubic Metre | |
| 142 | 9.03 | ROAD C | 341.65 | Cubic Metre | |
| 143 | 9.04 | ROAD D | 164.41 | Cubic Metre | |
| 144 | 9.05 | ROAD E | 229.69 | Cubic Metre | |
| 145 | 9.06 | ROAD F | 231.63 | Cubic Metre | |
| 146 | 9.07 | ROAD G | 303.11 | Cubic Metre | |
| 147 | 9.08 | ROAD H | 217.69 | Cubic Metre | |
| 148 | 9.09 | ROAD I | 232.37 | Cubic Metre | |
| 149 | 9.1 | ROAD J | 328.35 | Cubic Metre | |
| 150 | 9.11 | ROAD K | 207.25 | Cubic Metre | |
| 151 | 9.12 | ROAD L | 225.15 | Cubic Metre | |
| 152 | 9.13 | ROAD M | 225.53 | Cubic Metre | |
| 153 | 9.14 | ROAD N | 231.12 | Cubic Metre | |
| 154 | 9.15 | ROAD O | 150.56 | Cubic Metre | |
| 155 | 9.16 | ROAD P | 112.5 | Cubic Metre | |
| 156 | 9.17 | ROAD Q | 112.5 | Cubic Metre | |
| 157 | 9.18 | ROAD R | 166.13 | Cubic Metre | |
| 158 | 9.19 | ROAD S | 158.14 | Cubic Metre | |
| 159 | 10 | Excavation \nExcavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per SS20A MORTH Specification no.111,112,301,305,900 for Making up the berms. | |||
| 160 | 10.01 | ROAD A | 800.07 | Cubic Metre | |
| 161 | 10.02 | ROAD B | 650.07 | Cubic Metre | |
| 162 | 10.03 | ROAD C | 898.14 | Cubic Metre | |
| 163 | 10.04 | ROAD D | 431.07 | Cubic Metre | |
| 164 | 10.05 | ROAD E | 598.14 | Cubic Metre | |
| 165 | 10.06 | ROAD F | 598.02 | Cubic Metre | |
| 166 | 10.07 | ROAD G | 779.91 | Cubic Metre | |
| 167 | 10.08 | ROAD H | 574.5 | Cubic Metre | |
| 168 | 10.09 | ROAD I | 600 | Cubic Metre | |
| 169 | 10.1 | ROAD J | 594 | Cubic Metre | |
| 170 | 10.11 | ROAD K | 540 | Cubic Metre | |
| 171 | 10.12 | ROAD L | 598.5 | Cubic Metre | |
| 172 | 10.13 | ROAD M | 600 | Cubic Metre | |
| 173 | 10.14 | ROAD N | 600 | Cubic Metre | |
| 174 | 10.15 | ROAD O | 397.8 | Cubic Metre | |
| 175 | 10.16 | ROAD P | 300 | Cubic Metre | |
| 176 | 10.17 | ROAD Q | 300 | Cubic Metre | |
| 177 | 10.18 | ROAD R | 287.4 | Cubic Metre | |
| 178 | 10.19 | ROAD S | 420 | Cubic Metre | |
| 179 | 11 | Providing RCC M15 Grade precast KM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete as per MORT & H Specification No. 804 | |||
| 180 | 11.01 | ROAD A | 2 | Number | |
| 181 | 11.02 | ROAD B | 2 | Number | |
| 182 | 11.03 | ROAD C | 3 | Number | |
| 183 | 11.04 | ROAD D | 2 | Number | |
| 184 | 11.05 | ROAD E | 3 | Number | |
| 185 | 11.06 | ROAD F | 3 | Number | |
| 186 | 11.07 | ROAD G | 3 | Number | |
| 187 | 11.08 | ROAD H | 1 | Number | |
| 188 | 11.09 | ROAD I | 2 | Number | |
| 189 | 11.1 | ROAD J | 2 | Number | |
| 190 | 11.11 | ROAD K | 1 | Number | |
| 191 | 11.12 | ROAD L | 2 | Number | |
| 192 | 11.13 | ROAD M | 2 | Number | |
| 193 | 11.14 | ROAD N | 2 | Number | |
| 194 | 11.15 | ROAD O | 1 | Number | |
| 195 | 11.16 | ROAD P | 1 | Number | |
| 196 | 11.17 | ROAD Q | 1 | Number | |
| 197 | 11.18 | ROAD R | 1 | Number | |
| 198 | 11.19 | ROAD S | 2 | Number | |
| 199 | 12 | Providing RCC M15 Grade precast HM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete as per MORT & H Specification No. 804 | |||
| 200 | 12.01 | ROAD A | 12 | Numbers | |
| 201 | 12.02 | ROAD B | 10 | Numbers | |
| 202 | 12.03 | ROAD C | 12 | Number | |
| 203 | 12.04 | ROAD D | 7 | Number | |
| 204 | 12.05 | ROAD E | 8 | Number | |
| 205 | 12.06 | ROAD F | 8 | Number | |
| 206 | 12.07 | ROAD G | 11 | Number | |
| 207 | 12.08 | ROAD H | 8 | Number | |
| 208 | 12.09 | ROAD I | 8 | Number | |
| 209 | 12.1 | ROAD J | 8 | Number | |
| 210 | 12.11 | ROAD K | 8 | Number | |
| 211 | 12.12 | ROAD L | 8 | Number | |
| 212 | 12.13 | ROAD M | 8 | Number | |
| 213 | 12.14 | ROAD N | 8 | Number | |
| 214 | 12.15 | ROAD O | 6 | Number | |
| 215 | 12.16 | ROAD P | 4 | Number | |
| 216 | 12.17 | ROAD Q | 4 | Number | |
| 217 | 12.18 | ROAD R | 4 | Number | |
| 218 | 12.19 | ROAD S | 6 | Number | |
| 219 | 13 | Dismantling \n Dismantling the existing RR masonry with cement mortor selvaging and removal and dispositing of resulting materials and back filling the resulting trenches and pits etc., as per MORTH Specification no. 111,112,202,Sl.No.14 | |||
| 220 | 13.01 | ROAD A (BOX CULVERT) KM 1/6 | 41.52 | Cubic Metre | |
| 221 | 13.02 | ROAD A (BOX CULVERT) KM 2/2 | 6.4 | Cubic Metre | |
| 222 | 13.03 | ROAD B ( BOX CULVERT) | 6.4 | Cubic Metre | |
| 223 | 13.04 | ROAD C ( BOX CULVERT) | 12.8 | Cubic Metre | |
| 224 | 13.05 | ROAD D ( BOX CULVERT) | 6.4 | Cubic Metre | |
| 225 | 13.06 | ROAD E ( BOX CULVERT) | 12.8 | Cubic Metre | |
| 226 | 13.07 | ROAD F ( BOX CULVERT) KM 5/8 | 6.4 | Cubic Metre | |
| 227 | 13.08 | ROAD F ( BOX CULVERT) KM 6/4 | 6.4 | Cubic Metre | |
| 228 | 13.09 | ROAD G ( BOX CULVERT) | 6.4 | Cubic Metre | |
| 229 | 14 | Earth work excavation in all classes of soils except rock requiring blasting depositing on bank,with all leads and lifts as per SS 20B,Including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams sheeting, shoring, bracing,and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation, UNDER ABUTMENTS AND PIERS FOR FOUNDATION. | |||
| 230 | 14.01 | ROAD A (BOX CULVERT) KM 1/6 | 305.08 | Cubic Metre | |
| 231 | 14.02 | ROAD A (BOX CULVERT) KM 2/2 | 142.67 | Cubic Metre | |
| 232 | 14.03 | ROAD B ( BOX CULVERT) | 142.67 | Cubic Metre | |
| 233 | 14.04 | ROAD C ( BOX CULVERT) | 285.34 | Cubic Metre | |
| 234 | 14.05 | ROAD D ( BOX CULVERT) | 142.67 | Cubic Metre | |
| 235 | 14.06 | ROAD E ( BOX CULVERT) | 285.34 | Cubic Metre | |
| 236 | 14.07 | ROAD F ( BOX CULVERT) KM 5/8 | 142.67 | Cubic Metre | |
| 237 | 14.08 | ROAD F ( BOX CULVERT) KM 6/4 | 142.67 | Cubic Metre | |
| 238 | 14.09 | ROAD G ( BOX CULVERT) | 142.67 | Cubic Metre | |
| 239 | 15 | Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification 111,112,304 for foundation | |||
| 240 | 15.01 | ROAD A ( PROTECTIVE WALL) | 226.2 | Cubic Metre | |
| 241 | 15.02 | ROAD B( PROTECTIVE WALL) | 553.32 | Cubic Metre | |
| 242 | 15.03 | ROAD C( PROTECTIVE WALL) | 400.2 | Cubic Metre | |
| 243 | 15.04 | ROAD E( PROTECTIVE WALL) | 330.6 | Cubic Metre | |
| 244 | 15.05 | ROAD G( PROTECTIVE WALL) | 147.9 | Cubic Metre | |
| 245 | 15.06 | ROAD T (RETAINING WALL ) | 417.6 | Cubic Metre | |
| 246 | 15.07 | ROAD W (RETAINING WALL ) | 513.3 | Cubic Metre | |
| 247 | 15.08 | ROAD X (RETAINING WALL WALL) | 196.62 | Cubic Metre | |
| 248 | 15.09 | ROAD Y (RETAINING WALL WALL) | 551.58 | Cubic Metre | |
| 249 | 15.1 | ROAD Z (RETAINING WALL WALL) | 133.98 | Cubic Metre | |
| 250 | 16 | Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification 111,112,304 for foundation | |||
| 251 | 16.01 | ROAD U (RETAINING WALL ) | 38.67 | Cubic Metre | |
| 252 | 16.02 | ROAD V (RETAINING WALL ) | 136.02 | Cubic Metre | |
| 253 | 17 | Filling with good Quarry Dust to required thick below the foundation concrete including cost and conveyance of all material to site form any approved source satisfying the standard and specifications, and all labour charges for filling in layers compacting, ramming to obtain the maximum density by watering to obtain the maximum density by watering with all leads for water including all other incidental charges such as bailing out water if necessary forming protective bunds etc., complete for body wall and cradle portion. | |||
| 254 | 17.01 | ROAD A ( PROTECTIVE WALL) | 28.28 | Cubic Metre | |
| 255 | 17.02 | ROAD B( PROTECTIVE WALL) | 69.17 | Cubic Metre | |
| 256 | 17.03 | ROAD C( PROTECTIVE WALL) | 50.02 | Cubic Metre | |
| 257 | 17.04 | ROAD E( PROTECTIVE WALL) | 41.32 | Cubic Metre | |
| 258 | 17.05 | ROAD G( PROTECTIVE WALL) | 18.49 | Cubic Metre | |
| 259 | 17.06 | ROAD T (RETAINING WALL ) | 52.21 | Cubic Metre | |
| 260 | 17.07 | ROAD U (RETAINING WALL ) | 6.53 | Cubic Metre | |
| 261 | 17.08 | ROAD V (RETAINING WALL ) | 22.95 | Cubic Metre | |
| 262 | 17.09 | ROAD W (RETAINING WALL ) | 64.16 | Cubic Metre | |
| 263 | 17.1 | ROAD X (RETAINING WALL WALL) | 24.58 | Cubic Metre | |
| 264 | 17.11 | ROAD Y (RETAINING WALL WALL) | 68.95 | Cubic Metre | |
| 265 | 17.12 | ROAD Z (RETAINING WALL WALL) | 16.75 | Cubic Metre | |
| 266 | 18 | Vibrated Cement Concrete M15 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., complete for foundation | |||
| 267 | 18.01 | ROAD A ( PROTECTIVE WALL) | 28.28 | Cubic Metre | |
| 268 | 18.02 | ROAD B( PROTECTIVE WALL) | 69.17 | Cubic Metre | |
| 269 | 18.03 | ROAD C( PROTECTIVE WALL) | 50.02 | Cubic Metre | |
| 270 | 18.04 | ROAD E( PROTECTIVE WALL) | 41.32 | Cubic Metre | |
| 271 | 18.05 | ROAD G( PROTECTIVE WALL) | 18.49 | Cubic Metre | |
| 272 | 18.06 | ROAD T (RETAINING WALL ) | 52.21 | Cubic Metre | |
| 273 | 18.07 | ROAD W (RETAINING WALL ) | 64.16 | Cubic Metre | |
| 274 | 18.08 | ROAD X (RETAINING WALL WALL) | 24.58 | Cubic Metre | |
| 275 | 18.09 | ROAD Y (RETAINING WALL WALL) | 68.95 | Cubic Metre | |
| 276 | 18.1 | ROAD Z (RETAINING WALL WALL) | 16.75 | Cubic Metre | |
| 277 | 19 | Cement Concrete M15 (Nominal mix 1:2:4), using 40 mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying, compacting, curing concrete tools and plants and incidental charges such as bailing out water, forming and maintaining of protective bunds, cofferdams, shoring, strutting, etc., complete as per relevant standard specification for LEVELLING COURSE BELOW BOTTOM SLAB and wing wall base course | |||
| 278 | 19.01 | ROAD A (BOX CULVERT) KM 1/6 | 14.76 | Cubic Metre | |
| 279 | 19.02 | ROAD A (BOX CULVERT) KM 2/2 | 8.03 | Cubic Metre | |
| 280 | 19.03 | ROAD B ( BOX CULVERT) | 8.03 | Cubic Metre | |
| 281 | 19.04 | ROAD C ( BOX CULVERT) | 16.06 | Cubic Metre | |
| 282 | 19.05 | ROAD D ( BOX CULVERT) | 8.03 | Cubic Metre | |
| 283 | 19.06 | ROAD E ( BOX CULVERT) | 16.06 | Cubic Metre | |
| 284 | 19.07 | ROAD F ( BOX CULVERT) KM 5/8 | 8.03 | Cubic Metre | |
| 285 | 19.08 | ROAD F ( BOX CULVERT) KM 6/4 | 8.03 | Cubic Metre | |
| 286 | 19.09 | ROAD G ( BOX CULVERT) | 8.03 | Cubic Metre | |
| 287 | 20 | Vibrated reinforced Cement concrete design mix M25 using 20mm and below ISS graded hard granite crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour labour charges for laying, compacting concrete curing concrete wincluding all other incidental charges etc., complete for BOX CULVERT ( below sill) | |||
| 288 | 20.01 | ROAD A (BOX CULVERT) KM 1/6 | 83.62 | Cubic Metre | |
| 289 | 20.02 | ROAD A (BOX CULVERT) KM 2/2 | 31.2 | Cubic Metre | |
| 290 | 20.03 | ROAD B ( BOX CULVERT) | 31.2 | Cubic Metre | |
| 291 | 20.04 | ROAD C ( BOX CULVERT) | 62.4 | Cubic Metre | |
| 292 | 20.05 | ROAD D ( BOX CULVERT) | 31.2 | Cubic Metre | |
| 293 | 20.06 | ROAD E ( BOX CULVERT) | 62.4 | Cubic Metre | |
| 294 | 20.07 | ROAD F ( BOX CULVERT) KM 5/8 | 31.2 | Cubic Metre | |
| 295 | 20.08 | ROAD F ( BOX CULVERT) KM 6/4 | 31.2 | Cubic Metre | |
| 296 | 20.09 | ROAD G ( BOX CULVERT) | 31.2 | Cubic Metre | |
| 297 | 21 | Vibrated reinforced Cement concrete design mix M20 using 20mm and below ISS graded hard granite crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour labour charges for laying, compacting concrete curing concrete wincluding all other incidental charges etc., complete for BOX CULVERT ( above sill) | |||
| 298 | 21.01 | ROAD A (BOX CULVERT) KM 1/6 | 53.93 | Cubic Metre | |
| 299 | 21.02 | ROAD A (BOX CULVERT) KM 2/2 | 35.03 | Cubic Metre | |
| 300 | 21.03 | ROAD B ( BOX CULVERT) | 35.03 | Cubic Metre | |
| 301 | 21.04 | ROAD C ( BOX CULVERT) | 70.06 | Cubic Metre | |
| 302 | 21.05 | ROAD D ( BOX CULVERT) | 35.03 | Cubic Metre | |
| 303 | 21.06 | ROAD E ( BOX CULVERT) | 70.06 | Cubic Metre | |
| 304 | 21.07 | ROAD F ( BOX CULVERT) KM 5/8 | 35.03 | Cubic Metre | |
| 305 | 21.08 | ROAD F ( BOX CULVERT) KM 6/4 | 35.03 | Cubic Metre | |
| 306 | 21.09 | ROAD G ( BOX CULVERT) | 35.03 | Cubic Metre | |
| 307 | 22 | Vibrated Cement Concrete M15 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., complete for below sill level. | |||
| 308 | 22.01 | ROAD A ( PROTECTIVE WALL) | 120.12 | Cubic Metre | |
| 309 | 22.02 | ROAD B( PROTECTIVE WALL) | 293.83 | Cubic Metre | |
| 310 | 22.03 | ROAD C( PROTECTIVE WALL) | 212.52 | Cubic Metre | |
| 311 | 22.04 | ROAD E( PROTECTIVE WALL) | 175.56 | Cubic Metre | |
| 312 | 22.05 | ROAD G( PROTECTIVE WALL) | 78.54 | Cubic Metre | |
| 313 | 22.06 | ROAD T (RETAINING WALL ) | 221.76 | Cubic Metre | |
| 314 | 22.07 | ROAD U (RETAINING WALL ) | 35.41 | Cubic Metre | |
| 315 | 22.08 | ROAD V (RETAINING WALL ) | 124.54 | Cubic Metre | |
| 316 | 22.09 | ROAD W (RETAINING WALL ) | 272.58 | Cubic Metre | |
| 317 | 22.1 | ROAD X (RETAINING WALL WALL) | 104.41 | Cubic Metre | |
| 318 | 22.11 | ROAD Y (RETAINING WALL WALL) | 292.91 | Cubic Metre | |
| 319 | 22.12 | ROAD Z (RETAINING WALL WALL) | 71.15 | Cubic Metre | |
| 320 | 23 | Vibrated Cement Concrete M15 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., complete for Above sill level. | |||
| 321 | 23.01 | ROAD A ( PROTECTIVE WALL) | 71.96 | Cubic Metre | |
| 322 | 23.02 | ROAD B( PROTECTIVE WALL) | 176.01 | Cubic Metre | |
| 323 | 23.03 | ROAD C( PROTECTIVE WALL) | 127.3 | Cubic Metre | |
| 324 | 23.04 | ROAD E( PROTECTIVE WALL) | 105.16 | Cubic Metre | |
| 325 | 23.05 | ROAD G( PROTECTIVE WALL) | 47.05 | Cubic Metre | |
| 326 | 23.06 | ROAD T (RETAINING WALL ) | 132.85 | Cubic Metre | |
| 327 | 23.07 | ROAD U (RETAINING WALL ) | 69.73 | Cubic Metre | |
| 328 | 23.08 | ROAD V (RETAINING WALL ) | 245.21 | Cubic Metre | |
| 329 | 23.09 | ROAD W (RETAINING WALL ) | 163.28 | Cubic Metre | |
| 330 | 23.1 | ROAD X (RETAINING WALL WALL) | 62.55 | Cubic Metre | |
| 331 | 23.11 | ROAD Y (RETAINING WALL WALL) | 175.46 | Cubic Metre | |
| 332 | 23.12 | ROAD Z (RETAINING WALL WALL) | 42.62 | Cubic Metre | |
| 333 | 24 | Providing and fixing 100mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for semi-sperical back fill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the back fill as per standard specifications as per MORTH specification no.2700, 900 | |||
| 334 | 24.01 | ROAD A ( PROTECTIVE WALL) | 128 | RM | |
| 335 | 24.02 | ROAD B( PROTECTIVE WALL) | 316 | RM | |
| 336 | 24.03 | ROAD C( PROTECTIVE WALL) | 226 | RM | |
| 337 | 24.04 | ROAD E( PROTECTIVE WALL) | 186 | RM | |
| 338 | 24.05 | ROAD G( PROTECTIVE WALL) | 83 | RM | |
| 339 | 24.06 | ROAD T (RETAINING WALL ) | 234 | RM | |
| 340 | 24.07 | ROAD U (RETAINING WALL ) | 15 | RM | |
| 341 | 24.08 | ROAD V (RETAINING WALL ) | 51 | RM | |
| 342 | 24.09 | ROAD W (RETAINING WALL ) | 291 | RM | |
| 343 | 24.1 | ROAD X (RETAINING WALL WALL) | 111 | RM | |
| 344 | 24.11 | ROAD Y (RETAINING WALL WALL) | 315 | RM | |
| 345 | 24.12 | ROAD Z (RETAINING WALL WALL) | 75 | RM | |
| 346 | 25 | Refilling the Excavated earth of granular materials saped concentrically to fit the lower part of the cost and conveyance of all materials to site and labour chargfes etc., complete | |||
| 347 | 25.01 | ROAD U (RETAINING WALL ) | 34.8 | Cubic Metre | |
| 348 | 25.02 | ROAD V (RETAINING WALL ) | 122.4 | Cubic Metre | |
| 349 | 26 | Supply and fabrication of steel Grade Fe-500 required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 900 | |||
| 350 | 26.01 | ROAD A (BOX CULVERT) KM 1/6 | 5.65 | Metric tone | |
| 351 | 26.02 | ROAD A (BOX CULVERT) KM 2/2 | 2.288 | Metric tone | |
| 352 | 26.03 | ROAD B ( BOX CULVERT) | 2.288 | Metric tone | |
| 353 | 26.04 | ROAD C ( BOX CULVERT) | 4.58 | Metric tone | |
| 354 | 26.05 | ROAD D ( BOX CULVERT) | 2.288 | Metric tone | |
| 355 | 26.06 | ROAD E ( BOX CULVERT) | 4.58 | Metric tone | |
| 356 | 26.07 | ROAD F ( BOX CULVERT) KM 5/8 | 2.288 | Metric tone | |
| 357 | 26.08 | ROAD F ( BOX CULVERT) KM 6/4 | 2.288 | Metric tone | |
| 358 | 26.09 | ROAD G ( BOX CULVERT) | 2.288 | Metric tone | |
| 359 | 27 | Stone dust FILLING BEHIND THE ABUTMENTS AND Return wall with clean good gritty gravel including cost and conveyance to site including labour charges for filling in layers, water tamping under optium moisture content to get the maximum density all incidental charges etc., complete | |||
| 360 | 27.01 | ROAD A (BOX CULVERT) KM 1/6 | 36.55 | Cubic Metre | |
| 361 | 27.02 | ROAD A (BOX CULVERT) KM 2/2 | 13.76 | Cubic Metre | |
| 362 | 27.03 | ROAD B ( BOX CULVERT) | 13.76 | Cubic Metre | |
| 363 | 27.04 | ROAD C ( BOX CULVERT) | 27.52 | Cubic Metre | |
| 364 | 27.05 | ROAD D ( BOX CULVERT) | 13.76 | Cubic Metre | |
| 365 | 27.06 | ROAD E ( BOX CULVERT) | 27.52 | Cubic Metre | |
| 366 | 27.07 | ROAD F ( BOX CULVERT) KM 5/8 | 13.76 | Cubic Metre | |
| 367 | 27.08 | ROAD F ( BOX CULVERT) KM 6/4 | 13.76 | Cubic Metre | |
| 368 | 27.09 | ROAD G ( BOX CULVERT) | 13.76 | Cubic Metre | |
| 369 | 28 | Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Formation of embankment using carted earth with a lead of 2 km. having CBR value of more than 8 (Diversion Road) | |||
| 370 | 28.01 | ROAD A Km 1/6 ( For Diversion Road)\n | 390 | Cubic Metre | |
| 371 | 28.02 | ROAD A Km 2/2 ( For Diversion Road)\n | 195 | Cubic Metre | |
| 372 | 28.03 | ROAD B (BOX CULVERT) ( For Diversion Road)\n | 195 | Cubic Metre | |
| 373 | 28.04 | ROAD C (BOX CULVERT) ( For Diversion Road)\n | 390 | Cubic Metre | |
| 374 | 28.05 | ROAD D ( BOX CULVERT ) ( For Diversion Road)\n | 195 | Cubic Metre | |
| 375 | 28.06 | ROAD E ( BOX CULVERT) ( For Diversion Road)\n | 390 | Cubic Metre | |
| 376 | 28.07 | ROAD F Km 5/8 ( BOX CULVERT) ( For Diversion Road)\n | 195 | Cubic Metre | |
| 377 | 28.08 | ROAD F Km 6/4( BOX CULVERT) ( For Diversion Road)\n | 195 | Cubic Metre | |
| 378 | 28.09 | ROAD G ( BOX CULVERT) ( For Diversion Road)\n | 195 | Cubic Metre | |
| 379 | 29 | Providing and laying of Gravel including cost and conveyance of the same to work site including stacking the same to departemental gauge for premeasurement including all labour charges for laying, spreading etc., complete and as directed by the departmental engineers for making For diversion road | |||
| 380 | 29.01 | ROAD A Km 1/6 ( For Diversion Road)\n | 49.5 | Cubic Metre | |
| 381 | 29.02 | ROAD A Km 2/2( For Diversion Road)\n | 49.5 | Cubic Metre | |
| 382 | 29.03 | ROAD B (BOX CULVERT) ( For Diversion Road)\n | 49.5 | Cubic Metre | |
| 383 | 29.04 | ROAD C (BOX CULVERT) ( For Diversion Road)\n | 99 | Cubic Metre | |
| 384 | 29.05 | ROAD D ( BOX CULVERT ) ( For Diversion Road)\n | 49.5 | Cubic Metre | |
| 385 | 29.06 | ROAD E ( BOX CULVERT) ( For Diversion Road)\n | 99 | Cubic Metre | |
| 386 | 29.07 | ROAD F Km 5/8 ( BOX CULVERT) ( For Diversion Road)\n | 49.5 | Cubic Metre | |
| 387 | 29.08 | ROAD F Km 6/4( BOX CULVERT) ( For Diversion Road)\n | 49.5 | Cubic Metre | |
| 388 | 29.09 | ROAD G ( BOX CULVERT) ( For Diversion Road)\n | 49.5 | Cubic Metre | |
| 389 | 30 | Vibrated Cement Concrete M30 Grade (Design mix) Using IRC size hard granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, including all incidental charges etc., complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 1700, 2702, 900 for WEARING COAT 75MM uniform thickness OVER DECK SLAB AND APPROACH SLAB | |||
| 390 | 30.01 | ROAD A (BOX CULVERT) KM 1/6 | 55.94 | Square Metre | |
| 391 | 30.02 | ROAD A (BOX CULVERT) KM 2/2 | 19.11 | Square Metre | |
| 392 | 30.03 | ROAD B ( BOX CULVERT) | 19.11 | Square Metre | |
| 393 | 30.04 | ROAD C ( BOX CULVERT) | 38.22 | Square Metre | |
| 394 | 30.05 | ROAD D ( BOX CULVERT) | 19.11 | Square Metre | |
| 395 | 30.06 | ROAD E ( BOX CULVERT) | 38.22 | Square Metre | |
| 396 | 30.07 | ROAD F ( BOX CULVERT) KM 5/8 | 19.11 | Square Metre | |
| 397 | 30.08 | ROAD F ( BOX CULVERT) KM 6/4 | 19.11 | Square Metre | |
| 398 | 30.09 | ROAD G ( BOX CULVERT) | 19.11 | Square Metre | |
| 399 | 31 | Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification no.111,112,501, 503,900 - over bituminous surfaces | |||
| 400 | 31.01 | ROAD A (UPKEEPING 4th YEAR) | 299.24 | Square Metre | |
| 401 | 31.02 | ROAD A (UPKEEPING 5th YEAR) | 498.73 | Square Metre | |
| 402 | 31.03 | ROAD B (UPKEEPING 4th YEAR) | 246.9 | Square Metre | |
| 403 | 31.04 | ROAD B (UPKEEPING 5th YEAR) | 411.5 | Square Metre | |
| 404 | 31.05 | ROAD C (UPKEEPING 4th YEAR) | 341.42 | Square Metre | |
| 405 | 31.06 | ROAD C (UPKEEPING 5th YEAR) | 569.04 | Square Metre | |
| 406 | 31.07 | ROAD D (UPKEEPING 4th YEAR) | 162.44 | Square Metre | |
| 407 | 31.08 | ROAD D (UPKEEPING 5th YEAR) | 270.73 | Square Metre | |
| 408 | 31.09 | ROAD E (UPKEEPING 4th YEAR) | 227.09 | Square Metre | |
| 409 | 31.1 | ROAD E (UPKEEPING 5th YEAR) | 378.49 | Square Metre | |
| 410 | 31.11 | ROAD F (UPKEEPING 4th YEAR) | 224.3 | Square Metre | |
| 411 | 31.12 | ROAD F (UPKEEPING 5th YEAR) | 373.84 | Square Metre | |
| 412 | 31.13 | ROAD G (UPKEEPING 4th YEAR) | 293.45 | Square Metre | |
| 413 | 31.14 | ROAD G (UPKEEPING 5th YEAR) | 489.09 | Square Metre | |
| 414 | 31.15 | ROAD H (UPKEEPING 4th YEAR) | 199.08 | Square Metre | |
| 415 | 31.16 | ROAD H (UPKEEPING 5th YEAR) | 331.8 | Square Metre | |
| 416 | 31.17 | ROAD I (UPKEEPING 4th YEAR) | 219.15 | Square Metre | |
| 417 | 31.18 | ROAD I (UPKEEPING 5th YEAR) | 365.25 | Square Metre | |
| 418 | 31.19 | ROAD J (UPKEEPING 4th YEAR) | 315.48 | Square Metre | |
| 419 | 31.2 | ROAD J(UPKEEPING 5th YEAR) | 525.8 | Square Metre | |
| 420 | 31.21 | ROAD K (UPKEEPING 4th YEAR) | 192.88 | Square Metre | |
| 421 | 31.22 | ROADK (UPKEEPING 5th YEAR) | 321.47 | Square Metre | |
| 422 | 31.23 | ROAD L (UPKEEPING 4th YEAR) | 210.6 | Square Metre | |
| 423 | 31.24 | ROAD L (UPKEEPING 5th YEAR) | 351 | Square Metre | |
| 424 | 31.25 | ROAD M (UPKEEPING 4th YEAR) | 212.03 | Square Metre | |
| 425 | 31.26 | ROAD M (UPKEEPING 5th YEAR) | 353.38 | Square Metre | |
| 426 | 31.27 | ROAD N (UPKEEPING 4th YEAR) | 217.83 | Square Metre | |
| 427 | 31.28 | ROAD N (UPKEEPING 5th YEAR) | 363.06 | Square Metre | |
| 428 | 31.29 | ROAD O (UPKEEPING 4th YEAR) | 139.09 | Square Metre | |
| 429 | 31.3 | ROAD O (UPKEEPING 5th YEAR) | 231.82 | Square Metre | |
| 430 | 31.31 | ROAD P: (UPKEEPING 4th YEAR) | 85.95 | Square Metre | |
| 431 | 31.32 | ROAD P (UPKEEPING 5th YEAR) | 143.25 | Square Metre | |
| 432 | 31.33 | ROAD Q (UPKEEPING 4th YEAR) | 85.95 | Square Metre | |
| 433 | 31.34 | ROAD Q (UPKEEPING 5th YEAR) | 143.25 | Square Metre | |
| 434 | 31.35 | ROAD R(UPKEEPING 4th YEAR) | 132.86 | Square Metre | |
| 435 | 31.36 | ROAD R(UPKEEPING 5th YEAR) | 221.44 | Square Metre | |
| 436 | 31.37 | ROAD S (UPKEEPING 4th YEAR) | 147.34 | Square Metre | |
| 437 | 31.38 | ROAD S (UPKEEPING 5th YEAR) | 245.56 | Square Metre | |
| 438 | 32 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH specificationno.111,112,507, 900 complete in all respects - Grading II for patch Work | |||
| 439 | 32.01 | ROAD A (UPKEEPING 4th YEAR) | 8.98 | Cubic Metre | |
| 440 | 32.02 | ROAD A (UPKEEPING 5th YEAR) | 14.96 | Cubic Metre | |
| 441 | 32.03 | ROAD B (UPKEEPING 4th YEAR) | 7.41 | Cubic Metre | |
| 442 | 32.04 | ROAD B (UPKEEPING 5th YEAR) | 12.35 | Cubic Metre | |
| 443 | 32.05 | ROAD C (UPKEEPING 4th YEAR) | 10.24 | Cubic Metre | |
| 444 | 32.06 | ROAD C (UPKEEPING 5th YEAR) | 17.07 | Cubic Metre | |
| 445 | 32.07 | ROAD D (UPKEEPING 4th YEAR) | 4.87 | Cubic Metre | |
| 446 | 32.08 | ROAD D (UPKEEPING 5th YEAR) | 8.12 | Cubic Metre | |
| 447 | 32.09 | ROAD E (UPKEEPING 4th YEAR) | 6.81 | Cubic Metre | |
| 448 | 32.1 | ROAD E (UPKEEPING 5th YEAR) | 11.35 | Cubic Metre | |
| 449 | 32.11 | ROAD F (UPKEEPING 4th YEAR) | 6.73 | Cubic Metre | |
| 450 | 32.12 | ROAD F (UPKEEPING 5th YEAR) | 11.22 | Cubic Metre | |
| 451 | 32.13 | ROAD G (UPKEEPING 4th YEAR) | 8.8 | Cubic Metre | |
| 452 | 32.14 | ROAD G (UPKEEPING 5th YEAR) | 14.67 | Cubic Metre | |
| 453 | 32.15 | ROAD H (UPKEEPING 4th YEAR) | 5.97 | Cubic Metre | |
| 454 | 32.16 | ROAD H (UPKEEPING 5th YEAR) | 9.95 | Cubic Metre | |
| 455 | 32.17 | ROAD I (UPKEEPING 4th YEAR) | 6.57 | Cubic Metre | |
| 456 | 32.18 | ROAD I (UPKEEPING 5th YEAR) | 10.96 | Cubic Metre | |
| 457 | 32.19 | ROAD J (UPKEEPING 4th YEAR) | 9.46 | Cubic Metre | |
| 458 | 32.2 | ROAD J(UPKEEPING 5th YEAR) | 15.77 | Cubic Metre | |
| 459 | 32.21 | ROAD K (UPKEEPING 4th YEAR) | 5.79 | Cubic Metre | |
| 460 | 32.22 | ROADK (UPKEEPING 5th YEAR) | 9.64 | Cubic Metre | |
| 461 | 32.23 | ROAD L (UPKEEPING 4th YEAR) | 6.32 | Cubic Metre | |
| 462 | 32.24 | ROAD L (UPKEEPING 5th YEAR) | 10.53 | Cubic Metre | |
| 463 | 32.25 | ROAD M (UPKEEPING 4th YEAR) | 6.36 | Cubic Metre | |
| 464 | 32.26 | ROAD M (UPKEEPING 5th YEAR) | 10.6 | Cubic Metre | |
| 465 | 32.27 | ROAD N (UPKEEPING 4th YEAR) | 6.53 | Cubic Metre | |
| 466 | 32.28 | ROAD N (UPKEEPING 5th YEAR) | 10.89 | Cubic Metre | |
| 467 | 32.29 | ROAD O (UPKEEPING 4th YEAR) | 4.17 | Cubic Metre | |
| 468 | 32.3 | ROAD O (UPKEEPING 5th YEAR) | 6.95 | Cubic Metre | |
| 469 | 32.31 | ROAD P: (UPKEEPING 4th YEAR) | 2.58 | Cubic Metre | |
| 470 | 32.32 | ROAD P (UPKEEPING 5th YEAR) | 4.3 | Cubic Metre | |
| 471 | 32.33 | ROAD Q (UPKEEPING 4th YEAR) | 2.58 | Cubic Metre | |
| 472 | 32.34 | ROAD Q (UPKEEPING 5th YEAR) | 4.3 | Cubic Metre | |
| 473 | 32.35 | ROAD R(UPKEEPING 4th YEAR) | 3.99 | Cubic Metre | |
| 474 | 32.36 | ROAD R(UPKEEPING 5th YEAR) | 6.64 | Cubic Metre | |
| 475 | 32.37 | ROAD S (UPKEEPING 4th YEAR) | 4.42 | Cubic Metre | |
| 476 | 32.38 | ROAD S (UPKEEPING 5th YEAR) | 7.37 | Cubic Metre | |
| 477 | 33 | Excavation \nExcavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer including compaction by power roller rolling as per SS20B MORTH Specification no.111,112,301,305,900 for Making up the berms. (Yearly Two Times) | |||
| 478 | 33.01 | ROAD A (UPKEEPING 2nd YEAR) | 480.04 | Cubic Metre | |
| 479 | 33.02 | ROAD A (UPKEEPING 3rd YEAR) | 480.04 | Cubic Metre | |
| 480 | 33.03 | ROAD A (UPKEEPING 4th YEAR) | 480.04 | Cubic Metre | |
| 481 | 33.04 | ROAD A (UPKEEPING 5th YEAR) | 480.04 | Cubic Metre | |
| 482 | 33.05 | ROAD B (UPKEEPING 2nd YEAR) | 390.04 | Cubic Metre | |
| 483 | 33.06 | ROAD B (UPKEEPING 3rd YEAR) | 390.04 | Cubic Metre | |
| 484 | 33.07 | ROAD B (UPKEEPING 4th YEAR) | 390.04 | Cubic Metre | |
| 485 | 33.08 | ROAD B (UPKEEPING 5th YEAR) | 390.04 | Cubic Metre | |
| 486 | 33.09 | ROAD C (UPKEEPING 2nd YEAR) | 538.88 | Cubic Metre | |
| 487 | 33.1 | ROAD C (UPKEEPING 3rd YEAR) | 538.88 | Cubic Metre | |
| 488 | 33.11 | ROAD C (UPKEEPING 4th YEAR) | 538.88 | Cubic Metre | |
| 489 | 33.12 | ROAD C (UPKEEPING 5th YEAR) | 538.88 | Cubic Metre | |
| 490 | 33.13 | ROAD D (UPKEEPING 2nd YEAR) | 258.64 | Cubic Metre | |
| 491 | 33.14 | ROAD D (UPKEEPING 3rd YEAR) | 258.64 | Cubic Metre | |
| 492 | 33.15 | ROAD D(UPKEEPING 4th YEAR) | 258.64 | Cubic Metre | |
| 493 | 33.16 | ROAD D (UPKEEPING 5th YEAR) | 258.64 | Cubic Metre | |
| 494 | 33.17 | ROAD E (UPKEEPING 2nd YEAR) | 358.88 | Cubic Metre | |
| 495 | 33.18 | ROAD E (UPKEEPING 3rd YEAR) | 358.88 | Cubic Metre | |
| 496 | 33.19 | ROAD E (UPKEEPING 4th YEAR) | 358.88 | Cubic Metre | |
| 497 | 33.2 | ROAD E (UPKEEPING 5th YEAR) | 358.88 | Cubic Metre | |
| 498 | 33.21 | ROAD F (UPKEEPING 2nd YEAR) | 358.81 | Cubic Metre | |
| 499 | 33.22 | ROAD F (UPKEEPING 3rd YEAR) | 358.81 | Cubic Metre | |
| 500 | 33.23 | ROAD F (UPKEEPING 4th YEAR) | 358.81 | Cubic Metre | |
| 501 | 33.24 | ROAD F (UPKEEPING 5th YEAR) | 358.81 | Cubic Metre | |
| 502 | 33.25 | ROAD G (UPKEEPING 2nd YEAR) | 467.95 | Cubic Metre | |
| 503 | 33.26 | ROAD G (UPKEEPING 3rd YEAR) | 467.95 | Cubic Metre | |
| 504 | 33.27 | ROAD G (UPKEEPING 4th YEAR) | 467.95 | Cubic Metre | |
| 505 | 33.28 | ROAD G (UPKEEPING 5th YEAR) | 467.95 | Cubic Metre | |
| 506 | 33.29 | ROAD H (UPKEEPING 2nd YEAR) | 344.7 | Cubic Metre | |
| 507 | 33.3 | ROAD H(UPKEEPING 3rd YEAR) | 344.7 | Cubic Metre | |
| 508 | 33.31 | ROAD H (UPKEEPING 4th YEAR) | 344.7 | Cubic Metre | |
| 509 | 33.32 | ROAD H (UPKEEPING 5th YEAR) | 344.7 | Cubic Metre | |
| 510 | 33.33 | ROAD I (UPKEEPING 2nd YEAR) | 360 | Cubic Metre | |
| 511 | 33.34 | ROAD I(UPKEEPING 3rd YEAR) | 360 | Cubic Metre | |
| 512 | 33.35 | ROAD I (UPKEEPING 4th YEAR) | 360 | Cubic Metre | |
| 513 | 33.36 | ROAD I (UPKEEPING 5th YEAR) | 360 | Cubic Metre | |
| 514 | 33.37 | ROAD J(UPKEEPING 2nd YEAR) | 356.4 | Cubic Metre | |
| 515 | 33.38 | ROAD J(UPKEEPING 3rd YEAR) | 356.4 | Cubic Metre | |
| 516 | 33.39 | ROAD J (UPKEEPING 4th YEAR) | 356.4 | Cubic Metre | |
| 517 | 33.4 | ROAD J (UPKEEPING 5th YEAR) | 356.4 | Cubic Metre | |
| 518 | 33.41 | ROAD K(UPKEEPING 2nd YEAR) | 324 | Cubic Metre | |
| 519 | 33.42 | ROAD K(UPKEEPING 3rd YEAR) | 324 | Cubic Metre | |
| 520 | 33.43 | ROAD K(UPKEEPING 4th YEAR) | 324 | Cubic Metre | |
| 521 | 33.44 | ROADK (UPKEEPING 5th YEAR) | 324 | Cubic Metre | |
| 522 | 33.45 | ROAD L (UPKEEPING 2nd YEAR) | 359.1 | Cubic Metre | |
| 523 | 33.46 | ROAD L (UPKEEPING 3rd YEAR) | 359.1 | Cubic Metre | |
| 524 | 33.47 | ROAD L (UPKEEPING 4th YEAR) | 359.1 | Cubic Metre | |
| 525 | 33.48 | ROAD L (UPKEEPING 5th YEAR) | 359.1 | Cubic Metre | |
| 526 | 33.49 | ROAD M(UPKEEPING 2nd YEAR) | 360 | Cubic Metre | |
| 527 | 33.5 | ROAD M(UPKEEPING ( 3rd YEAR) | 360 | Cubic Metre | |
| 528 | 33.51 | ROAD M (UPKEEPING 4th YEAR) | 360 | Cubic Metre | |
| 529 | 33.52 | ROAD M (UPKEEPING 5th YEAR) | 360 | Cubic Metre | |
| 530 | 33.53 | ROAD N(UPKEEPING 2nd YEAR) | 360 | Cubic Metre | |
| 531 | 33.54 | ROAD N(UPKEEPING 3rd YEAR) | 360 | Cubic Metre | |
| 532 | 33.55 | ROAD N(UPKEEPING 4th YEAR) | 360 | Cubic Metre | |
| 533 | 33.56 | ROAD N (UPKEEPING 5th YEAR) | 360 | Cubic Metre | |
| 534 | 33.57 | ROAD O(UPKEEPING 2nd YEAR) | 238.68 | Cubic Metre | |
| 535 | 33.58 | ROAD O(UPKEEPING 3rd YEAR) | 238.68 | Cubic Metre | |
| 536 | 33.59 | ROAD O(UPKEEPING 4th YEAR) | 238.68 | Cubic Metre | |
| 537 | 33.6 | ROAD O (UPKEEPING 5th YEAR) | 238.68 | Cubic Metre | |
| 538 | 33.61 | ROAD P(UPKEEPING 2nd YEAR) | 180 | Cubic Metre | |
| 539 | 33.62 | ROAD P(UPKEEPING 3rd YEAR) | 180 | Cubic Metre | |
| 540 | 33.63 | ROAD P(UPKEEPING 4th YEAR) | 180 | Cubic Metre | |
| 541 | 33.64 | ROAD P (UPKEEPING 5th YEAR) | 180 | Cubic Metre | |
| 542 | 33.65 | ROAD Q(UPKEEPING 2nd YEAR) | 180 | Cubic Metre | |
| 543 | 33.66 | ROAD Q(UPKEEPING 3rd YEAR) | 180 | Cubic Metre | |
| 544 | 33.67 | ROAD Q(UPKEEPING 4th YEAR) | 180 | Cubic Metre | |
| 545 | 33.68 | ROAD Q (UPKEEPING 5th YEAR) | 180 | Cubic Metre | |
| 546 | 33.69 | ROAD R(UPKEEPING 2nd YEAR) | 172.44 | Cubic Metre | |
| 547 | 33.7 | ROAD R(UPKEEPING 3rd YEAR) | 172.44 | Cubic Metre | |
| 548 | 33.71 | ROAD R(UPKEEPING 4th YEAR) | 172.44 | Cubic Metre | |
| 549 | 33.72 | ROAD R (UPKEEPING 5th YEAR) | 172.44 | Cubic Metre | |
| 550 | 33.73 | ROAD S(UPKEEPING 2nd YEAR) | 252 | Cubic Metre | |
| 551 | 33.74 | ROAD S(UPKEEPING 3rd YEAR) | 252 | Cubic Metre | |
| 552 | 33.75 | ROAD S(UPKEEPING 4th YEAR) | 252 | Cubic Metre | |
| 553 | 33.76 | ROAD S (UPKEEPING 5th YEAR) | 252 | Cubic Metre | |
| 554 | 34 | Clearing the Light jungles including weeding out shrubs bushes, egetables, growth etc., as per spcifications and directions of Engineer in charge (Twice a year) for 60 months | |||
| 555 | 34.01 | ROAD A (UPKEEPING 1st YEAR) | 9840 | Square metre | |
| 556 | 34.02 | ROAD A (UPKEEPING 2nd YEAR) | 9840 | Square metre | |
| 557 | 34.03 | ROAD A (UPKEEPING 3rd YEAR) | 9840 | Square metre | |
| 558 | 34.04 | ROAD A (UPKEEPING 4th YEAR) | 9840 | Square metre | |
| 559 | 34.05 | ROAD A (UPKEEPING 5th YEAR) | 9840 | Square metre | |
| 560 | 34.06 | ROAD B (UPKEEPING 1st YEAR) | 7488 | Square metre | |
| 561 | 34.07 | ROAD B (UPKEEPING 2nd YEAR) | 7488 | Square metre | |
| 562 | 34.08 | ROAD B (UPKEEPING 3rd YEAR) | 7488 | Square metre | |
| 563 | 34.09 | ROAD B (UPKEEPING 4th YEAR) | 7488 | Square metre | |
| 564 | 34.1 | ROAD B (UPKEEPING 5th YEAR) | 7488 | Square metre | |
| 565 | 34.11 | ROAD C (UPKEEPING Ist YEAR) | 13440 | Square metre | |
| 566 | 34.12 | ROAD C (UPKEEPING 2nd YEAR) | 13440 | Square metre | |
| 567 | 34.13 | ROAD C (UPKEEPING 3rd YEAR) | 13440 | Square metre | |
| 568 | 34.14 | ROAD C (UPKEEPING 4th YEAR) | 13440 | Square metre | |
| 569 | 34.15 | ROAD C (UPKEEPING 5th YEAR) | 13440 | Square metre | |
| 570 | 34.16 | ROAD D (UPKEEPING 1st YEAR) | 6912 | Square metre | |
| 571 | 34.17 | ROAD D (UPKEEPING 2nd YEAR) | 6912 | Square metre | |
| 572 | 34.18 | ROAD D (UPKEEPING 3rd YEAR) | 6912 | Square metre | |
| 573 | 34.19 | ROAD D (UPKEEPING 4th YEAR) | 6912 | Square metre | |
| 574 | 34.2 | ROAD D (UPKEEPING 5th YEAR) | 6912 | Square metre | |
| 575 | 34.21 | ROAD E (UPKEEPING 1st YEAR) | 9312 | Square metre | |
| 576 | 34.22 | ROAD E (UPKEEPING 2nd YEAR) | 9312 | Square metre | |
| 577 | 34.23 | ROAD E (UPKEEPING 3rd YEAR) | 9312 | Square metre | |
| 578 | 34.24 | ROAD E (UPKEEPING 4th YEAR) | 9312 | Square metre | |
| 579 | 34.25 | ROAD E (UPKEEPING 5th YEAR) | 9312 | Square metre | |
| 580 | 34.26 | ROAD F (UPKEEPING 1st YEAR) | 7200 | Square metre | |
| 581 | 34.27 | ROAD F (UPKEEPING 2nd YEAR) | 7200 | Square metre | |
| 582 | 34.28 | ROAD F (UPKEEPING 3rd YEAR) | 7200 | Square metre | |
| 583 | 34.29 | ROAD F (UPKEEPING 4th YEAR) | 7200 | Square metre | |
| 584 | 34.3 | ROAD F (UPKEEPING 5th YEAR) | 7200 | Square metre | |
| 585 | 34.31 | ROAD G (UPKEEPING 1st YEAR) | 10200 | Square metre | |
| 586 | 34.32 | ROAD G (UPKEEPING 2nd YEAR) | 10200 | Square metre | |
| 587 | 34.33 | ROAD G (UPKEEPING 3rd YEAR) | 10200 | Square metre | |
| 588 | 34.34 | ROAD G(UPKEEPING 4th YEAR) | 10200 | Square metre | |
| 589 | 34.35 | ROAD G (UPKEEPING 5th YEAR) | 10200 | Square metre | |
| 590 | 34.36 | ROAD H (UPKEEPING Ist YEAR) | 9288 | Square metre | |
| 591 | 34.37 | ROAD H (UPKEEPING 2nd YEAR) | 9288 | Square metre | |
| 592 | 34.38 | ROAD H(UPKEEPING 3rd YEAR) | 9288 | Square metre | |
| 593 | 34.39 | ROAD H (UPKEEPING 4th YEAR) | 9288 | Square metre | |
| 594 | 34.4 | ROAD H (UPKEEPING 5th YEAR) | 9288 | Square metre | |
| 595 | 34.41 | ROAD I (UPKEEPING I st YEAR) | 9600 | Square metre | |
| 596 | 34.42 | ROAD I (UPKEEPING 2nd YEAR) | 9600 | Square metre | |
| 597 | 34.43 | ROAD I(UPKEEPING 3rd YEAR) | 9600 | Square metre | |
| 598 | 34.44 | ROAD I (UPKEEPING 4th YEAR) | 9600 | Square metre | |
| 599 | 34.45 | ROAD I (UPKEEPING 5th YEAR) | 9600 | Square metre | |
| 600 | 34.46 | ROAD J (UPKEEPING I stYEAR) | 9600 | Square metre | |
| 601 | 34.47 | ROAD J(UPKEEPING 2nd YEAR) | 9600 | Square metre | |
| 602 | 34.48 | ROAD J(UPKEEPING 3rd YEAR) | 9600 | Square metre | |
| 603 | 34.49 | ROAD J (UPKEEPING 4th YEAR) | 9600 | Square metre | |
| 604 | 34.5 | ROAD J (UPKEEPING 5th YEAR) | 9600 | Square metre | |
| 605 | 34.51 | ROAD K (UPKEEPING I st YEAR) | 8448 | Square metre | |
| 606 | 34.52 | ROAD K(UPKEEPING 2nd YEAR) | 8448 | Square metre | |
| 607 | 34.53 | ROAD K(UPKEEPING 3rd YEAR) | 8448 | Square metre | |
| 608 | 34.54 | ROAD K(UPKEEPING 4th YEAR) | 8448 | Square metre | |
| 609 | 34.55 | ROADK (UPKEEPING 5th YEAR) | 8448 | Square metre | |
| 610 | 34.56 | ROAD L (UPKEEPING I st YEAR) | 8832 | Square metre | |
| 611 | 34.57 | ROAD L (UPKEEPING 2nd YEAR) | 8832 | Square metre | |
| 612 | 34.58 | ROAD L (UPKEEPING 3rd YEAR) | 8832 | Square metre | |
| 613 | 34.59 | ROAD L (UPKEEPING 4th YEAR) | 8832 | Square metre | |
| 614 | 34.6 | ROAD L (UPKEEPING 5th YEAR) | 8832 | Square metre | |
| 615 | 34.61 | ROAD M(UPKEEPING ( I st YEAR) | 9600 | Square metre | |
| 616 | 34.62 | ROAD M(UPKEEPING 2nd YEAR) | 9600 | Square metre | |
| 617 | 34.63 | ROAD M(UPKEEPING ( 3rd YEAR) | 9600 | Square metre | |
| 618 | 34.64 | ROAD M (UPKEEPING 4th YEAR) | 9600 | Square metre | |
| 619 | 34.65 | ROAD M (UPKEEPING 5th YEAR) | 9600 | Square metre | |
| 620 | 34.66 | ROAD N(UPKEEPING I stYEAR) | 8832 | Square metre | |
| 621 | 34.67 | ROAD N(UPKEEPING 2nd YEAR) | 8832 | Square metre | |
| 622 | 34.68 | ROAD N(UPKEEPING 3rd YEAR) | 8832 | Square metre | |
| 623 | 34.69 | ROAD N(UPKEEPING 4th YEAR) | 8832 | Square metre | |
| 624 | 34.7 | ROAD N (UPKEEPING 5th YEAR) | 8832 | Square metre | |
| 625 | 34.71 | ROAD O(UPKEEPING I stYEAR) | 4944 | Square metre | |
| 626 | 34.72 | ROAD O(UPKEEPING 2nd YEAR) | 4944 | Square metre | |
| 627 | 34.73 | ROAD O(UPKEEPING 3rd YEAR) | 4944 | Square metre | |
| 628 | 34.74 | ROAD O(UPKEEPING 4th YEAR) | 4944 | Square metre | |
| 629 | 34.75 | ROAD O (UPKEEPING 5th YEAR) | 4944 | Square metre | |
| 630 | 34.76 | ROAD P(UPKEEPING I stYEAR) | 4800 | Square metre | |
| 631 | 34.77 | ROAD P(UPKEEPING 2nd YEAR) | 4800 | Square metre | |
| 632 | 34.78 | ROAD P(UPKEEPING 3rd YEAR) | 4800 | Square metre | |
| 633 | 34.79 | ROAD P(UPKEEPING 4th YEAR) | 4800 | Square metre | |
| 634 | 34.8 | ROAD P (UPKEEPING 5th YEAR) | 4800 | Square metre | |
| 635 | 34.81 | ROAD Q(UPKEEPING I stYEAR) | 4800 | Square metre | |
| 636 | 34.82 | ROAD Q(UPKEEPING 2nd YEAR) | 4800 | Square metre | |
| 637 | 34.83 | ROAD Q(UPKEEPING 3rd YEAR) | 4800 | Square metre | |
| 638 | 34.84 | ROAD Q(UPKEEPING 4th YEAR) | 4800 | Square metre | |
| 639 | 34.85 | ROAD Q (UPKEEPING 5th YEAR) | 4800 | Square metre | |
| 640 | 34.86 | ROAD R(UPKEEPING I stYEAR) | 4800 | Square metre | |
| 641 | 34.87 | ROAD R(UPKEEPING 2nd YEAR) | 4800 | Square metre | |
| 642 | 34.88 | ROAD R(UPKEEPING 3rd YEAR) | 4800 | Square metre | |
| 643 | 34.89 | ROAD R(UPKEEPING 4th YEAR) | 4800 | Square metre | |
| 644 | 34.9 | ROAD R (UPKEEPING 5th YEAR) | 4800 | Square metre | |
| 645 | 34.91 | ROAD S(UPKEEPING I stYEAR) | 3840 | Square metre | |
| 646 | 34.92 | ROAD S(UPKEEPING 2nd YEAR) | 3840 | Square metre | |
| 647 | 34.93 | ROAD S(UPKEEPING 3rd YEAR) | 3840 | Square metre | |
| 648 | 34.94 | ROAD S(UPKEEPING 4th YEAR) | 3840 | Square metre | |
| 649 | 34.95 | ROAD S (UPKEEPING 5th YEAR) | 3840 | Square metre | |
| 650 | 35 | Deploying earth moving machinery for desilting channal and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. For U/s and D/s culvert Clearance using JCB (Sl.No:XI-18) | |||
| 651 | 35.01 | ROAD A (UPKEEPING 1st YEAR) | 5 | Hour | |
| 652 | 35.02 | ROAD A (UPKEEPING 2nd YEAR) | 5 | Hour | |
| 653 | 35.03 | ROAD A (UPKEEPING 3rd YEAR) | 5 | Hour | |
| 654 | 35.04 | ROAD A (UPKEEPING 4th YEAR) | 5 | Hour | |
| 655 | 35.05 | ROAD A (UPKEEPING 5th YEAR) | 5 | Hour | |
| 656 | 35.06 | ROAD B (UPKEEPING 1st YEAR) | 10 | Hour | |
| 657 | 35.07 | ROAD B (UPKEEPING 2nd YEAR) | 11 | Hour | |
| 658 | 35.08 | ROAD B (UPKEEPING 3rd YEAR) | 11 | Hour | |
| 659 | 35.09 | ROAD B (UPKEEPING 4th YEAR) | 11 | Hour | |
| 660 | 35.1 | ROAD B (UPKEEPING 5th YEAR) | 11 | Hour | |
| 661 | 35.11 | ROAD C (UPKEEPING Ist YEAR) | 7 | Hour | |
| 662 | 35.12 | ROAD C (UPKEEPING 2nd YEAR) | 9 | Hour | |
| 663 | 35.13 | ROAD C (UPKEEPING 3rd YEAR) | 9 | Hour | |
| 664 | 35.14 | ROAD C (UPKEEPING 4th YEAR) | 9 | Hour | |
| 665 | 35.15 | ROAD C (UPKEEPING 5th YEAR) | 9 | Hour | |
| 666 | 35.16 | ROAD D (UPKEEPING 1ST YEAR) | 3 | Hour | |
| 667 | 35.17 | ROAD D (UPKEEPING 2nd YEAR) | 4 | Hour | |
| 668 | 35.18 | ROAD D (UPKEEPING 3rd YEAR) | 4 | Hour | |
| 669 | 35.19 | ROAD D (UPKEEPING 4th YEAR) | 4 | Hour | |
| 670 | 35.2 | ROAD D (UPKEEPING 5th YEAR) | 4 | Hour | |
| 671 | 35.21 | ROAD E (UPKEEPING 1st YEAR) | 6 | Hour | |
| 672 | 35.22 | ROAD E (UPKEEPING 2nd YEAR) | 8 | Hour | |
| 673 | 35.23 | ROAD E (UPKEEPING 3rd YEAR) | 8 | Hour | |
| 674 | 35.24 | ROAD E (UPKEEPING 4th YEAR) | 8 | Hour | |
| 675 | 35.25 | ROAD E (UPKEEPING 5th YEAR) | 8 | Hour | |
| 676 | 35.26 | ROAD F (UPKEEPING 1ST YEAR) | 5 | Hour | |
| 677 | 35.27 | ROAD F(UPKEEPING 2nd YEAR) | 6 | Hour | |
| 678 | 35.28 | ROAD F (UPKEEPING 3rd YEAR) | 6 | Hour | |
| 679 | 35.29 | ROAD F (UPKEEPING 4th YEAR) | 6 | Hour | |
| 680 | 35.3 | ROAD F (UPKEEPING 5th YEAR) | 6 | Hour | |
| 681 | 35.31 | ROAD G (UPKEEPING 1ST YEAR) | 8 | Hour | |
| 682 | 35.32 | ROAD GUPKEEPING 2nd YEAR) | 9 | Hour | |
| 683 | 35.33 | ROAD G (UPKEEPING 3rd YEAR) | 9 | Hour | |
| 684 | 35.34 | ROAD G(UPKEEPING 4th YEAR) | 9 | Hour | |
| 685 | 35.35 | ROAD G (UPKEEPING 5th YEAR) | 9 | Hour | |
| 686 | 35.36 | ROAD H (UPKEEPING Ist YEAR) | 6 | Hour | |
| 687 | 35.37 | ROAD H (UPKEEPING 2nd YEAR) | 6 | Hour | |
| 688 | 35.38 | ROAD H(UPKEEPING 3rd YEAR) | 6 | Hour | |
| 689 | 35.39 | ROAD H (UPKEEPING 4th YEAR) | 6 | Hour | |
| 690 | 35.4 | ROAD H (UPKEEPING 5th YEAR) | 6 | Hour | |
| 691 | 35.41 | ROAD I (UPKEEPING I st YEAR) | 5 | Hour | |
| 692 | 35.42 | ROAD I (UPKEEPING 2nd YEAR) | 5 | Hour | |
| 693 | 35.43 | ROAD I(UPKEEPING 3rd YEAR) | 5 | Hour | |
| 694 | 35.44 | ROAD I (UPKEEPING 4th YEAR) | 5 | Hour | |
| 695 | 35.45 | ROAD I (UPKEEPING 5th YEAR) | 5 | Hour | |
| 696 | 35.46 | ROAD J (UPKEEPING I stYEAR) | 8 | Hour | |
| 697 | 35.47 | ROAD J(UPKEEPING 2nd YEAR) | 8 | Hour | |
| 698 | 35.48 | ROAD J(UPKEEPING 3rd YEAR) | 8 | Hour | |
| 699 | 35.49 | ROAD J (UPKEEPING 4th YEAR) | 8 | Hour | |
| 700 | 35.5 | ROAD J (UPKEEPING 5th YEAR) | 8 | Hour | |
| 701 | 35.51 | ROAD K (UPKEEPING I st YEAR) | 1 | Hour | |
| 702 | 35.52 | ROAD K(UPKEEPING 2nd YEAR) | 1 | Hour | |
| 703 | 35.53 | ROAD K(UPKEEPING 3rd YEAR) | 1 | Hour | |
| 704 | 35.54 | ROAD K(UPKEEPING 4th YEAR) | 1 | Hour | |
| 705 | 35.55 | ROADK (UPKEEPING 5th YEAR) | 1 | Hour | |
| 706 | 35.56 | ROAD L (UPKEEPING I st YEAR) | 5 | Hour | |
| 707 | 35.57 | ROAD L (UPKEEPING 2nd YEAR) | 5 | Hour | |
| 708 | 35.58 | ROAD L (UPKEEPING 3rd YEAR) | 5 | Hour | |
| 709 | 35.59 | ROAD L (UPKEEPING 4th YEAR) | 5 | Hour | |
| 710 | 35.6 | ROAD L (UPKEEPING 5th YEAR) | 5 | Hour | |
| 711 | 35.61 | ROAD M(UPKEEPING ( I st YEAR) | 5 | Hour | |
| 712 | 35.62 | ROAD M(UPKEEPING 2nd YEAR) | 5 | Hour | |
| 713 | 35.63 | ROAD M(UPKEEPING ( 3rd YEAR) | 5 | Hour | |
| 714 | 35.64 | ROAD M (UPKEEPING 4th YEAR) | 5 | Hour | |
| 715 | 35.65 | ROAD M (UPKEEPING 5th YEAR) | 5 | Hour | |
| 716 | 35.66 | ROAD N(UPKEEPING I stYEAR) | 4 | Hour | |
| 717 | 35.67 | ROAD N(UPKEEPING 2nd YEAR) | 4 | Hour | |
| 718 | 35.68 | ROAD N(UPKEEPING 3rd YEAR) | 4 | Hour | |
| 719 | 35.69 | ROAD N(UPKEEPING 4th YEAR) | 4 | Hour | |
| 720 | 35.7 | ROAD N (UPKEEPING 5th YEAR) | 4 | Hour | |
| 721 | 35.71 | ROAD O(UPKEEPING I stYEAR) | 3 | Hour | |
| 722 | 35.72 | ROAD O(UPKEEPING 2nd YEAR) | 3 | Hour | |
| 723 | 35.73 | ROAD O(UPKEEPING 3rd YEAR) | 3 | Hour | |
| 724 | 35.74 | ROAD O(UPKEEPING 4th YEAR) | 3 | Hour | |
| 725 | 35.75 | ROAD O (UPKEEPING 5th YEAR) | 3 | Hour | |
| 726 | 35.76 | ROAD P(UPKEEPING I stYEAR) | 1 | Hour | |
| 727 | 35.77 | ROAD P(UPKEEPING 2nd YEAR) | 1 | Hour | |
| 728 | 35.78 | ROAD P(UPKEEPING 3rd YEAR) | 1 | Hour | |
| 729 | 35.79 | ROAD P(UPKEEPING 4th YEAR) | 1 | Hour | |
| 730 | 35.8 | ROAD P (UPKEEPING 5th YEAR) | 1 | Hour | |
| 731 | 35.81 | ROAD Q(UPKEEPING I st YEAR) | 1 | Hour | |
| 732 | 35.82 | ROAD Q(UPKEEPING 2nd YEAR) | 1 | Hour | |
| 733 | 35.83 | ROAD Q(UPKEEPING 3rd YEAR) | 1 | Hour | |
| 734 | 35.84 | ROAD Q(UPKEEPING 4th YEAR) | 1 | Hour | |
| 735 | 35.85 | ROAD Q (UPKEEPING 5th YEAR) | 1 | Hour | |
| 736 | 35.86 | ROAD R(UPKEEPING I stYEAR) | 2 | Hour | |
| 737 | 35.87 | ROAD R(UPKEEPING 2nd YEAR) | 2 | Hour | |
| 738 | 35.88 | ROAD R(UPKEEPING 3rd YEAR) | 2 | Hour | |
| 739 | 35.89 | ROAD R(UPKEEPING 4th YEAR) | 2 | Hour | |
| 740 | 35.9 | ROAD R (UPKEEPING 5th YEAR) | 2 | Hour | |
| 741 | 35.91 | ROAD S(UPKEEPING I stYEAR) | 4 | Hour | |
| 742 | 35.92 | ROAD S(UPKEEPING 2nd YEAR) | 4 | Hour | |
| 743 | 35.93 | ROAD S(UPKEEPING 3rd YEAR) | 4 | Hour | |
| 744 | 35.94 | ROAD S(UPKEEPING 4th YEAR) | 4 | Hour | |
| 745 | 35.95 | ROAD S (UPKEEPING 5th YEAR) | 4 | Hour | |
| 746 | 36 | White washing two coats with freshly burnt white shell lime inclusing cost of lime, blue powder fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specification and as directed. | |||
| 747 | 36.01 | ROAD A (UPKEEPING 1ST YEAR) | 51.58 | Square metre | |
| 748 | 36.02 | ROAD A (UPKEEPING 2nd YEAR) | 51.58 | Square metre | |
| 749 | 36.03 | ROAD A (UPKEEPING 3rd YEAR) | 51.58 | Square metre | |
| 750 | 36.04 | ROAD A (UPKEEPING 4th YEAR) | 51.58 | Square metre | |
| 751 | 36.05 | ROAD A (UPKEEPING 5th YEAR) | 51.58 | Square metre | |
| 752 | 36.06 | ROAD B (UPKEEPING 1ST YEAR) | 111.82 | Square metre | |
| 753 | 36.07 | ROAD B (UPKEEPING 2nd YEAR) | 111.82 | Square metre | |
| 754 | 36.08 | ROAD B (UPKEEPING 3rd YEAR) | 111.82 | Square metre | |
| 755 | 36.09 | ROAD B (UPKEEPING 4th YEAR) | 111.82 | Square metre | |
| 756 | 36.1 | ROAD B (UPKEEPING 5th YEAR) | 111.82 | Square metre | |
| 757 | 36.11 | ROAD C (UPKEEPING Ist YEAR) | 71.67 | Square metre | |
| 758 | 36.12 | ROAD C (UPKEEPING 2nd YEAR) | 71.67 | Square metre | |
| 759 | 36.13 | ROAD C (UPKEEPING 3rd YEAR) | 71.67 | Square metre | |
| 760 | 36.14 | ROAD C (UPKEEPING 4th YEAR) | 71.67 | Square metre | |
| 761 | 36.15 | ROAD C (UPKEEPING 5th YEAR) | 71.67 | Square metre | |
| 762 | 36.16 | ROAD D (UPKEEPING 1ST YEAR) | 42.94 | Square metre | |
| 763 | 36.17 | ROAD D (UPKEEPING 2nd YEAR) | 42.94 | Square metre | |
| 764 | 36.18 | ROAD D (UPKEEPING 3rd YEAR) | 42.94 | Square metre | |
| 765 | 36.19 | ROAD D (UPKEEPING 4th YEAR) | 42.94 | Square metre | |
| 766 | 36.2 | ROAD D (UPKEEPING 5th YEAR) | 42.94 | Square metre | |
| 767 | 36.21 | ROAD E (UPKEEPING 1st YEAR) | 47.36 | Square metre | |
| 768 | 36.22 | ROAD E (UPKEEPING 2nd YEAR) | 47.36 | Square metre | |
| 769 | 36.23 | ROAD E (UPKEEPING 3rd YEAR) | 47.36 | Square metre | |
| 770 | 36.24 | ROAD E (UPKEEPING 4th YEAR) | 47.36 | Square metre | |
| 771 | 36.25 | ROAD E (UPKEEPING 5th YEAR) | 47.36 | Square metre | |
| 772 | 36.26 | ROAD F (UPKEEPING 1st YEAR) | 39.27 | Square metre | |
| 773 | 36.27 | ROAD F (UPKEEPING 2nd YEAR) | 39.27 | Square metre | |
| 774 | 36.28 | ROAD F (UPKEEPING 3rd YEAR) | 39.27 | Square metre | |
| 775 | 36.29 | ROAD F (UPKEEPING 4th YEAR) | 39.27 | Square metre | |
| 776 | 36.3 | ROAD F (UPKEEPING 5th YEAR) | 39.27 | Square metre | |
| 777 | 36.31 | ROAD G (UPKEEPING 1st YEAR) | 63.4 | Square metre | |
| 778 | 36.32 | ROAD G (UPKEEPING 2nd YEAR) | 63.4 | Square metre | |
| 779 | 36.33 | ROAD G (UPKEEPING 3rd YEAR) | 63.4 | Square metre | |
| 780 | 36.34 | ROAD G (UPKEEPING 4th YEAR) | 63.4 | Square metre | |
| 781 | 36.35 | ROAD G (UPKEEPING 5th YEAR) | 63.4 | Square metre | |
| 782 | 36.36 | ROAD H (UPKEEPING Ist YEAR) | 43.33 | Square metre | |
| 783 | 36.37 | ROAD H (UPKEEPING 2nd YEAR) | 43.33 | Square metre | |
| 784 | 36.38 | ROAD H(UPKEEPING 3rd YEAR) | 43.33 | Square metre | |
| 785 | 36.39 | ROAD H (UPKEEPING 4th YEAR) | 43.33 | Square metre | |
| 786 | 36.4 | ROAD H (UPKEEPING 5th YEAR) | 43.33 | Square metre | |
| 787 | 36.41 | ROAD I (UPKEEPING I st YEAR) | 39.88 | Square metre | |
| 788 | 36.42 | ROAD I (UPKEEPING 2nd YEAR) | 39.88 | Square metre | |
| 789 | 36.43 | ROAD I(UPKEEPING 3rd YEAR) | 39.88 | Square metre | |
| 790 | 36.44 | ROAD I (UPKEEPING 4th YEAR) | 39.88 | Square metre | |
| 791 | 36.45 | ROAD I (UPKEEPING 5th YEAR) | 39.88 | Square metre | |
| 792 | 36.46 | ROAD J (UPKEEPING I stYEAR) | 79.12 | Square metre | |
| 793 | 36.47 | ROAD J(UPKEEPING 2nd YEAR) | 79.12 | Square metre | |
| 794 | 36.48 | ROAD J(UPKEEPING 3rd YEAR) | 79.12 | Square metre | |
| 795 | 36.49 | ROAD J (UPKEEPING 4th YEAR) | 79.12 | Square metre | |
| 796 | 36.5 | ROAD J (UPKEEPING 5th YEAR) | 79.12 | Square metre | |
| 797 | 36.51 | ROAD K (UPKEEPING I st YEAR) | 18.6 | Square metre | |
| 798 | 36.52 | ROAD K(UPKEEPING 2nd YEAR) | 18.6 | Square metre | |
| 799 | 36.53 | ROAD K(UPKEEPING 3rd YEAR) | 18.6 | Square metre | |
| 800 | 36.54 | ROAD K(UPKEEPING 4th YEAR) | 18.6 | Square metre | |
| 801 | 36.55 | ROADK (UPKEEPING 5th YEAR) | 18.6 | Square metre | |
| 802 | 36.56 | ROAD L (UPKEEPING I st YEAR) | 55.12 | Square metre | |
| 803 | 36.57 | ROAD L (UPKEEPING 2nd YEAR) | 55.12 | Square metre | |
| 804 | 36.58 | ROAD L (UPKEEPING 3rd YEAR) | 55.12 | Square metre | |
| 805 | 36.59 | ROAD L (UPKEEPING 4th YEAR) | 55.12 | Square metre | |
| 806 | 36.6 | ROAD L (UPKEEPING 5th YEAR) | 55.12 | Square metre | |
| 807 | 36.61 | ROAD M(UPKEEPING ( I st YEAR) | 49.1 | Square metre | |
| 808 | 36.62 | ROAD M(UPKEEPING 2nd YEAR) | 49.1 | Square metre | |
| 809 | 36.63 | ROAD M(UPKEEPING ( 3rd YEAR) | 49.1 | Square metre | |
| 810 | 36.64 | ROAD M (UPKEEPING 4th YEAR) | 49.1 | Square metre | |
| 811 | 36.65 | ROAD M (UPKEEPING 5th YEAR) | 49.1 | Square metre | |
| 812 | 36.66 | ROAD N(UPKEEPING I stYEAR) | 38.82 | Square metre | |
| 813 | 36.67 | ROAD N(UPKEEPING 2nd YEAR) | 38.82 | Square metre | |
| 814 | 36.68 | ROAD N(UPKEEPING 3rd YEAR) | 38.82 | Square metre | |
| 815 | 36.69 | ROAD N(UPKEEPING 4th YEAR) | 38.82 | Square metre | |
| 816 | 36.7 | ROAD N (UPKEEPING 5th YEAR) | 38.82 | Square metre | |
| 817 | 36.71 | ROAD O(UPKEEPING I stYEAR) | 41.34 | Square metre | |
| 818 | 36.72 | ROAD O(UPKEEPING 2nd YEAR) | 41.34 | Square metre | |
| 819 | 36.73 | ROAD O(UPKEEPING 3rd YEAR) | 41.34 | Square metre | |
| 820 | 36.74 | ROAD O(UPKEEPING 4th YEAR) | 41.34 | Square metre | |
| 821 | 36.75 | ROAD O (UPKEEPING 5th YEAR) | 41.34 | Square metre | |
| 822 | 36.76 | ROAD P(UPKEEPING I stYEAR) | 15.04 | Square metre | |
| 823 | 36.77 | ROAD P(UPKEEPING 2nd YEAR) | 15.04 | Square metre | |
| 824 | 36.78 | ROAD P(UPKEEPING 3rd YEAR) | 15.04 | Square metre | |
| 825 | 36.79 | ROAD P(UPKEEPING 4th YEAR) | 15.04 | Square metre | |
| 826 | 36.8 | ROAD P (UPKEEPING 5th YEAR) | 15.04 | Square metre | |
| 827 | 36.81 | ROAD Q(UPKEEPING I stYEAR) | 15.59 | Square metre | |
| 828 | 36.82 | ROAD Q(UPKEEPING 2nd YEAR) | 15.59 | Square metre | |
| 829 | 36.83 | ROAD Q(UPKEEPING 3rd YEAR) | 15.59 | Square metre | |
| 830 | 36.84 | ROAD Q(UPKEEPING 4th YEAR) | 15.59 | Square metre | |
| 831 | 36.85 | ROAD Q (UPKEEPING 5th YEAR) | 15.59 | Square metre | |
| 832 | 36.86 | ROAD R(UPKEEPING I stYEAR) | 129.62 | Square metre | |
| 833 | 36.87 | ROAD R(UPKEEPING 2nd YEAR) | 129.62 | Square metre | |
| 834 | 36.88 | ROAD R(UPKEEPING 3rd YEAR) | 129.62 | Square metre | |
| 835 | 36.89 | ROAD R(UPKEEPING 4th YEAR) | 129.62 | Square metre | |
| 836 | 36.9 | ROAD R (UPKEEPING 5th YEAR) | 129.62 | Square metre | |
| 837 | 36.91 | ROAD S(UPKEEPING I stYEAR) | 35.79 | Square metre | |
| 838 | 36.92 | ROAD S(UPKEEPING 2nd YEAR) | 35.79 | Square metre | |
| 839 | 36.93 | ROAD S(UPKEEPING 3rd YEAR) | 35.79 | Square metre | |
| 840 | 36.94 | ROAD S(UPKEEPING 4th YEAR) | 35.79 | Square metre | |
| 841 | 36.95 | ROAD S (UPKEEPING 5th YEAR) | 35.79 | Square metre | |
| 842 | 37 | Tree/EB pole /culvert / Retaining wall banding using Coal with standard dimension including all matyerials and labour and all other incidental charges etc., | |||
| 843 | 37.01 | ROAD A (UPKEEPING 1ST YEAR) | 20.37 | Square metre | |
| 844 | 37.02 | ROAD A (UPKEEPING 2nd YEAR) | 20.37 | Square metre | |
| 845 | 37.03 | ROAD A (UPKEEPING 3rd YEAR) | 20.37 | Square metre | |
| 846 | 37.04 | ROAD A (UPKEEPING 4th YEAR) | 20.37 | Square metre | |
| 847 | 37.05 | ROAD A (UPKEEPING 5th YEAR) | 20.37 | Square metre | |
| 848 | 37.06 | ROAD B (UPKEEPING 1ST YEAR) | 29.43 | Square metre | |
| 849 | 37.07 | ROAD B (UPKEEPING 2nd YEAR) | 29.43 | Square metre | |
| 850 | 37.08 | ROAD B (UPKEEPING 3rd YEAR) | 29.43 | Square metre | |
| 851 | 37.09 | ROAD B (UPKEEPING 4th YEAR) | 29.43 | Square metre | |
| 852 | 37.1 | ROAD B (UPKEEPING 5th YEAR) | 29.43 | Square metre | |
| 853 | 37.11 | ROAD C (UPKEEPING Ist YEAR) | 22.06 | Square metre | |
| 854 | 37.12 | ROAD C (UPKEEPING 2nd YEAR) | 22.06 | Square metre | |
| 855 | 37.13 | ROAD C (UPKEEPING 3rd YEAR) | 22.06 | Square metre | |
| 856 | 37.14 | ROAD C (UPKEEPING 4th YEAR) | 22.06 | Square metre | |
| 857 | 37.15 | ROAD C (UPKEEPING 5th YEAR) | 22.06 | Square metre | |
| 858 | 37.16 | ROAD D (UPKEEPING 1ST YEAR) | 11.92 | Square metre | |
| 859 | 37.17 | ROAD D (UPKEEPING 2nd YEAR) | 11.92 | Square metre | |
| 860 | 37.18 | ROAD D (UPKEEPING 3rd YEAR) | 11.92 | Square metre | |
| 861 | 37.19 | ROAD D (UPKEEPING 4th YEAR) | 11.92 | Square metre | |
| 862 | 37.2 | ROAD D (UPKEEPING 5th YEAR) | 11.92 | Square metre | |
| 863 | 37.21 | ROAD E (UPKEEPING 1st YEAR) | 7.08 | Square metre | |
| 864 | 37.22 | ROAD E (UPKEEPING 2nd YEAR) | 7.08 | Square metre | |
| 865 | 37.23 | ROAD E (UPKEEPING 3rd YEAR) | 7.08 | Square metre | |
| 866 | 37.24 | ROAD E (UPKEEPING 4th YEAR) | 7.08 | Square metre | |
| 867 | 37.25 | ROAD E (UPKEEPING 5th YEAR) | 7.08 | Square metre | |
| 868 | 37.26 | ROAD F (UPKEEPING 1ST YEAR) | 5.73 | Square metre | |
| 869 | 37.27 | ROAD F (UPKEEPING 2nd YEAR) | 5.73 | Square metre | |
| 870 | 37.28 | ROAD F (UPKEEPING 3rd YEAR) | 5.73 | Square metre | |
| 871 | 37.29 | ROAD F (UPKEEPING 4th YEAR) | 5.73 | Square metre | |
| 872 | 37.3 | ROAD F (UPKEEPING 5th YEAR) | 5.73 | Square metre | |
| 873 | 37.31 | ROAD G (UPKEEPING 1ST YEAR) | 9.43 | Square metre | |
| 874 | 37.32 | ROAD G (UPKEEPING 2nd YEAR) | 9.43 | Square metre | |
| 875 | 37.33 | ROAD G (UPKEEPING 3rd YEAR) | 9.43 | Square metre | |
| 876 | 37.34 | ROAD G (UPKEEPING 4th YEAR) | 9.43 | Square metre | |
| 877 | 37.35 | ROAD G (UPKEEPING 5th YEAR) | 9.43 | Square metre | |
| 878 | 37.36 | ROAD H (UPKEEPING I st YEAR) | 5.47 | Square metre | |
| 879 | 37.37 | ROAD H (UPKEEPING 2nd YEAR) | 5.47 | Square metre | |
| 880 | 37.38 | ROAD H(UPKEEPING 3rd YEAR) | 5.47 | Square metre | |
| 881 | 37.39 | ROAD H (UPKEEPING 4th YEAR) | 5.47 | Square metre | |
| 882 | 37.4 | ROAD H (UPKEEPING 5th YEAR) | 5.47 | Square metre | |
| 883 | 37.41 | ROAD I (UPKEEPING I st YEAR) | 6.44 | Square metre | |
| 884 | 37.42 | ROAD I (UPKEEPING 2nd YEAR) | 6.44 | Square metre | |
| 885 | 37.43 | ROAD I(UPKEEPING 3rd YEAR) | 6.44 | Square metre | |
| 886 | 37.44 | ROAD I (UPKEEPING 4th YEAR) | 6.44 | Square metre | |
| 887 | 37.45 | ROAD I (UPKEEPING 5th YEAR) | 6.44 | Square metre | |
| 888 | 37.46 | ROAD J (UPKEEPING I stYEAR) | 19.62 | Square metre | |
| 889 | 37.47 | ROAD J(UPKEEPING 2nd YEAR) | 19.62 | Square metre | |
| 890 | 37.48 | ROAD J(UPKEEPING 3rd YEAR) | 19.62 | Square metre | |
| 891 | 37.49 | ROAD J (UPKEEPING 4th YEAR) | 19.62 | Square metre | |
| 892 | 37.5 | ROAD J (UPKEEPING 5th YEAR) | 19.62 | Square metre | |
| 893 | 37.51 | ROAD K (UPKEEPING I st YEAR) | 3.9 | Square metre | |
| 894 | 37.52 | ROAD K(UPKEEPING 2nd YEAR) | 3.9 | Square metre | |
| 895 | 37.53 | ROAD K(UPKEEPING 3rd YEAR) | 3.9 | Square metre | |
| 896 | 37.54 | ROAD K(UPKEEPING 4th YEAR) | 3.9 | Square metre | |
| 897 | 37.55 | ROADK (UPKEEPING 5th YEAR) | 3.9 | Square metre | |
| 898 | 37.56 | ROAD L (UPKEEPING I st YEAR) | 12.31 | Square metre | |
| 899 | 37.57 | ROAD L (UPKEEPING 2nd YEAR) | 12.31 | Square metre | |
| 900 | 37.58 | ROAD L (UPKEEPING 3rd YEAR) | 12.31 | Square metre | |
| 901 | 37.59 | ROAD L (UPKEEPING 4th YEAR) | 12.31 | Square metre | |
| 902 | 37.6 | ROAD L (UPKEEPING 5th YEAR) | 12.31 | Square metre | |
| 903 | 37.61 | ROAD M(UPKEEPING ( I st YEAR) | 10.14 | Square metre | |
| 904 | 37.62 | ROAD M(UPKEEPING 2nd YEAR) | 10.14 | Square metre | |
| 905 | 37.63 | ROAD M(UPKEEPING ( 3rd YEAR) | 10.14 | Square metre | |
| 906 | 37.64 | ROAD M (UPKEEPING 4th YEAR) | 10.14 | Square metre | |
| 907 | 37.65 | ROAD M (UPKEEPING 5th YEAR) | 10.14 | Square metre | |
| 908 | 37.66 | ROAD N(UPKEEPING I stYEAR) | 8.47 | Square metre | |
| 909 | 37.67 | ROAD N(UPKEEPING 2nd YEAR) | 8.47 | Square metre | |
| 910 | 37.68 | ROAD N(UPKEEPING 3rd YEAR) | 8.47 | Square metre | |
| 911 | 37.69 | ROAD N(UPKEEPING 4th YEAR) | 8.47 | Square metre | |
| 912 | 37.7 | ROAD N (UPKEEPING 5th YEAR) | 8.47 | Square metre | |
| 913 | 37.71 | ROAD O(UPKEEPING I stYEAR) | 12.3 | Square metre | |
| 914 | 37.72 | ROAD O(UPKEEPING 2nd YEAR) | 12.3 | Square metre | |
| 915 | 37.73 | ROAD O(UPKEEPING 3rd YEAR) | 12.3 | Square metre | |
| 916 | 37.74 | ROAD O(UPKEEPING 4th YEAR) | 12.3 | Square metre | |
| 917 | 37.75 | ROAD O (UPKEEPING 5th YEAR) | 12.3 | Square metre | |
| 918 | 37.76 | ROAD P(UPKEEPING I stYEAR) | 4.82 | Square metre | |
| 919 | 37.77 | ROAD P(UPKEEPING 2nd YEAR) | 4.82 | Square metre | |
| 920 | 37.78 | ROAD P(UPKEEPING 3rd YEAR) | 4.82 | Square metre | |
| 921 | 37.79 | ROAD P(UPKEEPING 4th YEAR) | 4.82 | Square metre | |
| 922 | 37.8 | ROAD P (UPKEEPING 5th YEAR) | 4.82 | Square metre | |
| 923 | 37.81 | ROAD Q(UPKEEPING I stYEAR) | 5.1 | Square metre | |
| 924 | 37.82 | ROAD Q(UPKEEPING 2nd YEAR) | 5.1 | Square metre | |
| 925 | 37.83 | ROAD Q(UPKEEPING 3rd YEAR) | 5.1 | Square metre | |
| 926 | 37.84 | ROAD Q(UPKEEPING 4th YEAR) | 5.1 | Square metre | |
| 927 | 37.85 | ROAD Q (UPKEEPING 5th YEAR) | 5.1 | Square metre | |
| 928 | 37.86 | ROAD R(UPKEEPING I stYEAR) | 5.41 | Square metre | |
| 929 | 37.87 | ROAD R(UPKEEPING 2nd YEAR) | 5.41 | Square metre | |
| 930 | 37.88 | ROAD R(UPKEEPING 3rd YEAR) | 5.41 | Square metre | |
| 931 | 37.89 | ROAD R(UPKEEPING 4th YEAR) | 5.41 | Square metre | |
| 932 | 37.9 | ROAD R (UPKEEPING 5th YEAR) | 5.41 | Square metre | |
| 933 | 37.91 | ROAD S(UPKEEPING I stYEAR) | 7.09 | Square metre | |
| 934 | 37.92 | ROAD S(UPKEEPING 2nd YEAR) | 7.09 | Square metre | |
| 935 | 37.93 | ROAD S(UPKEEPING 3rd YEAR) | 7.09 | Square metre | |
| 936 | 37.94 | ROAD S(UPKEEPING 4th YEAR) | 7.09 | Square metre | |
| 937 | 37.95 | ROAD S (UPKEEPING 5th YEAR) | 7.09 | Square metre | |
| 938 | 38 | Painting the KM Stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | |||
| 939 | 38.01 | ROAD A (UPKEEPING 2nd YEAR) | 0.54 | Square metre | |
| 940 | 38.02 | ROAD A (UPKEEPING 3rd YEAR) | 0.54 | Square metre | |
| 941 | 38.03 | ROAD A (UPKEEPING 4th YEAR) | 0.54 | Square metre | |
| 942 | 38.04 | ROAD A (UPKEEPING 5th YEAR) | 0.54 | Square metre | |
| 943 | 38.05 | ROAD B (UPKEEPING 2nd YEAR) | 0.99 | Square metre | |
| 944 | 38.06 | ROAD B (UPKEEPING 3rd YEAR) | 0.99 | Square metre | |
| 945 | 38.07 | ROAD B (UPKEEPING 4th YEAR) | 0.99 | Square metre | |
| 946 | 38.08 | ROAD B (UPKEEPING 5th YEAR) | 0.99 | Square metre | |
| 947 | 38.09 | ROAD C (UPKEEPING 2nd YEAR) | 1.49 | Square metre | |
| 948 | 38.1 | ROAD C (UPKEEPING 3rd YEAR) | 1.49 | Square metre | |
| 949 | 38.11 | ROAD C (UPKEEPING 4th YEAR) | 1.49 | Square metre | |
| 950 | 38.12 | ROAD C (UPKEEPING 5th YEAR) | 1.49 | Square metre | |
| 951 | 38.13 | ROAD D (UPKEEPING 2nd YEAR) | 0.99 | Square metre | |
| 952 | 38.14 | ROAD D (UPKEEPING 3rd YEAR) | 0.99 | Square metre | |
| 953 | 38.15 | ROAD D (UPKEEPING 4th YEAR) | 0.99 | Square metre | |
| 954 | 38.16 | ROAD D (UPKEEPING 5th YEAR) | 0.99 | Square metre | |
| 955 | 38.17 | ROAD E (UPKEEPING 2nd YEAR) | 1.49 | Square metre | |
| 956 | 38.18 | ROAD E (UPKEEPING 3rd YEAR) | 1.49 | Square metre | |
| 957 | 38.19 | ROAD E (UPKEEPING 4th YEAR) | 1.49 | Square metre | |
| 958 | 38.2 | ROAD E (UPKEEPING 5th YEAR) | 1.49 | Square metre | |
| 959 | 38.21 | ROAD F (UPKEEPING 2nd YEAR) | 1.49 | Square metre | |
| 960 | 38.22 | ROAD F (UPKEEPING 3rd YEAR) | 1.49 | Square metre | |
| 961 | 38.23 | ROAD F (UPKEEPING 4th YEAR) | 1.49 | Square metre | |
| 962 | 38.24 | ROAD F (UPKEEPING 5th YEAR) | 1.49 | Square metre | |
| 963 | 38.25 | ROAD G (UPKEEPING 2nd YEAR) | 1.49 | Square metre | |
| 964 | 38.26 | ROAD G (UPKEEPING 3rd YEAR) | 1.49 | Square metre | |
| 965 | 38.27 | ROAD G (UPKEEPING 4th YEAR) | 1.49 | Square metre | |
| 966 | 38.28 | ROAD G (UPKEEPING 5th YEAR) | 1.49 | Square metre | |
| 967 | 38.29 | ROAD H (UPKEEPING 2nd YEAR) | 0.5 | Square metre | |
| 968 | 38.3 | ROAD H(UPKEEPING 3rd YEAR) | 0.5 | Square metre | |
| 969 | 38.31 | ROAD H (UPKEEPING 4th YEAR) | 0.5 | Square metre | |
| 970 | 38.32 | ROAD H (UPKEEPING 5th YEAR) | 0.5 | Square metre | |
| 971 | 38.33 | ROAD I (UPKEEPING 2nd YEAR) | 0.99 | Square metre | |
| 972 | 38.34 | ROAD I(UPKEEPING 3rd YEAR) | 0.99 | Square metre | |
| 973 | 38.35 | ROAD I (UPKEEPING 4th YEAR) | 0.99 | Square metre | |
| 974 | 38.36 | ROAD I (UPKEEPING 5th YEAR) | 0.99 | Square metre | |
| 975 | 38.37 | ROAD J(UPKEEPING 2nd YEAR) | 0.99 | Square metre | |
| 976 | 38.38 | ROAD J(UPKEEPING 3rd YEAR) | 0.99 | Square metre | |
| 977 | 38.39 | ROAD J (UPKEEPING 4th YEAR) | 0.99 | Square metre | |
| 978 | 38.4 | ROAD J (UPKEEPING 5th YEAR) | 0.99 | Square metre | |
| 979 | 38.41 | ROAD K(UPKEEPING 2nd YEAR) | 0.5 | Square metre | |
| 980 | 38.42 | ROAD K(UPKEEPING 3rd YEAR) | 0.5 | Square metre | |
| 981 | 38.43 | ROAD K(UPKEEPING 4th YEAR) | 0.5 | Square metre | |
| 982 | 38.44 | ROADK (UPKEEPING 5th YEAR) | 0.5 | Square metre | |
| 983 | 38.45 | ROAD L (UPKEEPING 2nd YEAR) | 0.99 | Square metre | |
| 984 | 38.46 | ROAD L (UPKEEPING 3rd YEAR) | 0.99 | Square metre | |
| 985 | 38.47 | ROAD L (UPKEEPING 4th YEAR) | 0.99 | Square metre | |
| 986 | 38.48 | ROAD L (UPKEEPING 5th YEAR) | 0.99 | Square metre | |
| 987 | 38.49 | ROAD M(UPKEEPING 2nd YEAR) | 0.99 | Square metre | |
| 988 | 38.5 | ROAD M(UPKEEPING ( 3rd YEAR) | 0.99 | Square metre | |
| 989 | 38.51 | ROAD M (UPKEEPING 4th YEAR) | 0.99 | Square metre | |
| 990 | 38.52 | ROAD M (UPKEEPING 5th YEAR) | 0.99 | Square metre | |
| 991 | 38.53 | ROAD N(UPKEEPING 2nd YEAR) | 0.99 | Square metre | |
| 992 | 38.54 | ROAD N(UPKEEPING 3rd YEAR) | 0.99 | Square metre | |
| 993 | 38.55 | ROAD N(UPKEEPING 4th YEAR) | 0.99 | Square metre | |
| 994 | 38.56 | ROAD N (UPKEEPING 5th YEAR) | 0.99 | Square metre | |
| 995 | 38.57 | ROAD O(UPKEEPING 2nd YEAR) | 0.5 | Square metre | |
| 996 | 38.58 | ROAD O(UPKEEPING 3rd YEAR) | 0.5 | Square metre | |
| 997 | 38.59 | ROAD O(UPKEEPING 4th YEAR) | 0.5 | Square metre | |
| 998 | 38.6 | ROAD O (UPKEEPING 5th YEAR) | 0.5 | Square metre | |
| 999 | 38.61 | ROAD P(UPKEEPING 2nd YEAR) | 0.5 | Square metre | |
| 1000 | 38.62 | ROAD P(UPKEEPING 3rd YEAR) | 0.5 | Square metre | |
| 1001 | 38.63 | ROAD P(UPKEEPING 4th YEAR) | 0.5 | Square metre | |
| 1002 | 38.64 | ROAD P (UPKEEPING 5th YEAR) | 0.5 | Square metre | |
| 1003 | 38.65 | ROAD Q(UPKEEPING 2nd YEAR) | 0.5 | Square metre | |
| 1004 | 38.66 | ROAD Q(UPKEEPING 3rd YEAR) | 0.5 | Square metre | |
| 1005 | 38.67 | ROAD Q(UPKEEPING 4th YEAR) | 0.5 | Square metre | |
| 1006 | 38.68 | ROAD Q (UPKEEPING 5th YEAR) | 0.5 | Square metre | |
| 1007 | 38.69 | ROAD R(UPKEEPING 2nd YEAR) | 0.5 | Square metre | |
| 1008 | 38.7 | ROAD R(UPKEEPING 3rd YEAR) | 0.5 | Square metre | |
| 1009 | 38.71 | ROAD R(UPKEEPING 4th YEAR) | 0.5 | Square metre | |
| 1010 | 38.72 | ROAD R (UPKEEPING 5th YEAR) | 0.5 | Square metre | |
| 1011 | 38.73 | ROAD S(UPKEEPING 2nd YEAR) | 0.99 | Square metre | |
| 1012 | 38.74 | ROAD S(UPKEEPING 3rd YEAR) | 0.99 | Square metre | |
| 1013 | 38.75 | ROAD S(UPKEEPING 4th YEAR) | 0.99 | Square metre | |
| 1014 | 38.76 | ROAD S (UPKEEPING 5th YEAR) | 0.99 | Square metre | |
| 1015 | 39 | Painting the HM Stone and culverts per IRC standard for numbering including the cost of Labour charges and material etc., complete | |||
| 1016 | 39.01 | ROAD A (UPKEEPING 1nd YEAR) | 7.83 | Square metre | |
| 1017 | 39.02 | ROAD A (UPKEEPING 2nd YEAR) | 17.91 | Square metre | |
| 1018 | 39.03 | ROAD A (UPKEEPING 3rd YEAR) | 17.91 | Square metre | |
| 1019 | 39.04 | ROAD A (UPKEEPING 4th YEAR) | 17.91 | Square metre | |
| 1020 | 39.05 | ROAD A (UPKEEPING 5th YEAR) | 17.91 | Square metre | |
| 1021 | 39.06 | ROAD B (UPKEEPING 1st YEAR) | 26.1 | Square metre | |
| 1022 | 39.07 | ROAD B (UPKEEPING 2nd YEAR) | 30.61 | Square metre | |
| 1023 | 39.08 | ROAD B (UPKEEPING 3rd YEAR) | 30.61 | Square metre | |
| 1024 | 39.09 | ROAD B (UPKEEPING 4th YEAR) | 30.61 | Square metre | |
| 1025 | 39.1 | ROAD B (UPKEEPING 5th YEAR) | 30.61 | Square metre | |
| 1026 | 39.11 | ROAD C (UPKEEPING Ist YEAR) | 18.27 | Square metre | |
| 1027 | 39.12 | ROAD C (UPKEEPING 2nd YEAR) | 25.77 | Square metre | |
| 1028 | 39.13 | ROAD C (UPKEEPING 3rd YEAR) | 25.77 | Square metre | |
| 1029 | 39.14 | ROAD C (UPKEEPING 4th YEAR) | 25.77 | Square metre | |
| 1030 | 39.15 | ROAD C (UPKEEPING 5th YEAR) | 25.77 | Square metre | |
| 1031 | 39.16 | ROAD D (UPKEEPING 1st YEAR) | 7.82 | Square metre | |
| 1032 | 39.17 | ROAD D (UPKEEPING 2nd YEAR) | 11.77 | Square metre | |
| 1033 | 39.18 | ROAD D (UPKEEPING 3rd YEAR) | 11.77 | Square metre | |
| 1034 | 39.19 | ROAD D (UPKEEPING 4th YEAR) | 11.77 | Square metre | |
| 1035 | 39.2 | ROAD D (UPKEEPING 5th YEAR) | 11.77 | Square metre | |
| 1036 | 39.21 | ROAD E (UPKEEPING 1st YEAR) | 15.66 | Square metre | |
| 1037 | 39.22 | ROAD E (UPKEEPING 2nd YEAR) | 22.4 | Square metre | |
| 1038 | 39.23 | ROAD E (UPKEEPING 3rd YEAR) | 22.4 | Square metre | |
| 1039 | 39.24 | ROAD E (UPKEEPING 4th YEAR) | 22.4 | Square metre | |
| 1040 | 39.25 | ROAD E (UPKEEPING 5th YEAR) | 22.4 | Square metre | |
| 1041 | 39.26 | ROAD F (UPKEEPING 1st YEAR) | 13.05 | Square metre | |
| 1042 | 39.27 | ROAD F (UPKEEPING 2nd YEAR) | 17.18 | Square metre | |
| 1043 | 39.28 | ROAD F (UPKEEPING 3rd YEAR) | 17.18 | Square metre | |
| 1044 | 39.29 | ROAD F (UPKEEPING 4th YEAR) | 17.18 | Square metre | |
| 1045 | 39.3 | ROAD F (UPKEEPING 5th YEAR) | 17.18 | Square metre | |
| 1046 | 39.31 | ROAD G (UPKEEPING 1st YEAR) | 20.88 | Square metre | |
| 1047 | 39.32 | ROAD G (UPKEEPING 2nd YEAR) | 25.58 | Square metre | |
| 1048 | 39.33 | ROAD G (UPKEEPING 3rd YEAR) | 25.58 | Square metre | |
| 1049 | 39.34 | ROAD G (UPKEEPING 4th YEAR) | 25.58 | Square metre | |
| 1050 | 39.35 | ROAD G(UPKEEPING 5th YEAR) | 25.58 | Square metre | |
| 1051 | 39.36 | ROAD H (UPKEEPING 1st YEAR) | 15.66 | Square metre | |
| 1052 | 39.37 | ROAD H (UPKEEPING 2nd YEAR) | 17.18 | Square metre | |
| 1053 | 39.38 | ROAD H(UPKEEPING 3rd YEAR) | 17.18 | Square metre | |
| 1054 | 39.39 | ROAD H (UPKEEPING 4th YEAR) | 17.18 | Square metre | |
| 1055 | 39.4 | ROAD H (UPKEEPING 5th YEAR) | 17.18 | Square metre | |
| 1056 | 39.41 | ROAD I (UPKEEPING Ist YEAR) | 13.05 | Square metre | |
| 1057 | 39.42 | ROAD I (UPKEEPING 2nd YEAR) | 14.57 | Square metre | |
| 1058 | 39.43 | ROAD I(UPKEEPING 3rd YEAR) | 14.57 | Square metre | |
| 1059 | 39.44 | ROAD I (UPKEEPING 4th YEAR) | 14.57 | Square metre | |
| 1060 | 39.45 | ROAD I (UPKEEPING 5th YEAR) | 14.57 | Square metre | |
| 1061 | 39.46 | ROAD J(UPKEEPING Ist YEAR) | 20.88 | Square metre | |
| 1062 | 39.47 | ROAD J(UPKEEPING 2nd YEAR) | 22.4 | Square metre | |
| 1063 | 39.48 | ROAD J(UPKEEPING 3rd YEAR) | 22.4 | Square metre | |
| 1064 | 39.49 | ROAD J (UPKEEPING 4th YEAR) | 22.4 | Square metre | |
| 1065 | 39.5 | ROAD J (UPKEEPING 5th YEAR) | 22.4 | Square metre | |
| 1066 | 39.51 | ROAD K (UPKEEPING I st YEAR) | 2.61 | Square metre | |
| 1067 | 39.52 | ROAD K(UPKEEPING 2nd YEAR) | 4.13 | Square metre | |
| 1068 | 39.53 | ROAD K(UPKEEPING 3rd YEAR) | 4.13 | Square metre | |
| 1069 | 39.54 | ROAD K(UPKEEPING 4th YEAR) | 4.13 | Square metre | |
| 1070 | 39.55 | ROADK (UPKEEPING 5th YEAR) | 4.13 | Square metre | |
| 1071 | 39.56 | ROAD L (UPKEEPING I st YEAR) | 13.05 | Square metre | |
| 1072 | 39.57 | ROAD L (UPKEEPING 2nd YEAR) | 14.57 | Square metre | |
| 1073 | 39.58 | ROAD L (UPKEEPING 3rd YEAR) | 14.57 | Square metre | |
| 1074 | 39.59 | ROAD L (UPKEEPING 4th YEAR) | 14.57 | Square metre | |
| 1075 | 39.6 | ROAD L (UPKEEPING 5th YEAR) | 14.57 | Square metre | |
| 1076 | 39.61 | ROAD M(UPKEEPING ( I st YEAR) | 13.05 | Square metre | |
| 1077 | 39.62 | ROAD M(UPKEEPING 2nd YEAR) | 14.57 | Square metre | |
| 1078 | 39.63 | ROAD M(UPKEEPING ( 3rd YEAR) | 14.57 | Square metre | |
| 1079 | 39.64 | ROAD M (UPKEEPING 4th YEAR) | 14.57 | Square metre | |
| 1080 | 39.65 | ROAD M (UPKEEPING 5th YEAR) | 14.57 | Square metre | |
| 1081 | 39.66 | ROAD N(UPKEEPING 1st YEAR) | 10.44 | Square metre | |
| 1082 | 39.67 | ROAD N(UPKEEPING 2nd YEAR) | 11.96 | Square metre | |
| 1083 | 39.68 | ROAD N(UPKEEPING 3rd YEAR) | 11.96 | Square metre | |
| 1084 | 39.69 | ROAD N(UPKEEPING 4th YEAR) | 11.96 | Square metre | |
| 1085 | 39.7 | ROAD N (UPKEEPING 5th YEAR) | 11.96 | Square metre | |
| 1086 | 39.71 | ROAD O(UPKEEPING 1st YEAR) | 7.83 | Square metre | |
| 1087 | 39.72 | ROAD O(UPKEEPING 2nd YEAR) | 8.97 | Square metre | |
| 1088 | 39.73 | ROAD O(UPKEEPING 3rd YEAR) | 8.97 | Square metre | |
| 1089 | 39.74 | ROAD O(UPKEEPING 4th YEAR) | 8.97 | Square metre | |
| 1090 | 39.75 | ROAD O (UPKEEPING 5th YEAR) | 8.97 | Square metre | |
| 1091 | 39.76 | ROAD P(UPKEEPING 1 st YEAR) | 2.61 | Square metre | |
| 1092 | 39.77 | ROAD P(UPKEEPING 2nd YEAR) | 3.37 | Square metre | |
| 1093 | 39.78 | ROAD P(UPKEEPING 3rd YEAR) | 3.37 | Square metre | |
| 1094 | 39.79 | ROAD P(UPKEEPING 4th YEAR) | 3.37 | Square metre | |
| 1095 | 39.8 | ROAD P (UPKEEPING 5th YEAR) | 3.37 | Square metre | |
| 1096 | 39.81 | ROAD Q(UPKEEPING 1 st YEAR) | 2.61 | Square metre | |
| 1097 | 39.82 | ROAD Q(UPKEEPING 2nd YEAR) | 3.37 | Square metre | |
| 1098 | 39.83 | ROAD Q(UPKEEPING 3rd YEAR) | 3.37 | Square metre | |
| 1099 | 39.84 | ROAD Q(UPKEEPING 4th YEAR) | 3.37 | Square metre | |
| 1100 | 39.85 | ROAD Q (UPKEEPING 5th YEAR) | 3.37 | Square metre | |
| 1101 | 39.86 | ROAD R(UPKEEPING 1 st YEAR) | 5.22 | Square metre | |
| 1102 | 39.87 | ROAD R(UPKEEPING 2nd YEAR) | 5.98 | Square metre | |
| 1103 | 39.88 | ROAD R(UPKEEPING 3rd YEAR) | 5.98 | Square metre | |
| 1104 | 39.89 | ROAD R(UPKEEPING 4th YEAR) | 5.98 | Square metre | |
| 1105 | 39.9 | ROAD R (UPKEEPING 5th YEAR) | 5.98 | Square metre | |
| 1106 | 39.91 | ROAD S(UPKEEPING 1 st YEAR) | 10.44 | Square metre | |
| 1107 | 39.92 | ROAD S(UPKEEPING 2nd YEAR) | 11.58 | Square metre | |
| 1108 | 39.93 | ROAD S(UPKEEPING 3rd YEAR) | 11.58 | Square metre | |
| 1109 | 39.94 | ROAD S(UPKEEPING 4th YEAR) | 11.58 | Square metre | |
| 1110 | 39.95 | ROAD S (UPKEEPING 5th YEAR) | 11.58 | Square metre | |
| 1111 | 40 | Chiseling the tree barks upto a size of 15cm x 15cm and painting with first class enamel paint and numbering the trees as per avenue register complete | |||
| 1112 | 40.01 | ROAD A (UPKEEPING 1st YEAR) | 27 | Number | |
| 1113 | 40.02 | ROAD B (UPKEEPING 1st YEAR) | 57 | Number | |
| 1114 | 40.03 | ROAD C (UPKEEPING Ist YEAR) | 30 | Number | |
| 1115 | 40.04 | ROAD D (UPKEEPING 1st YEAR) | 13 | Number | |
| 1116 | 40.05 | ROAD E (UPKEEPING 1st YEAR) | 9 | Number | |
| 1117 | 40.06 | ROAD F (UPKEEPING 1st YEAR) | 4 | Number | |
| 1118 | 40.07 | ROAD G (UPKEEPING 1st YEAR) | 9 | Number | |
| 1119 | 40.08 | ROAD H (UPKEEPING 1st YEAR) | 7 | Number | |
| 1120 | 40.09 | ROAD I (UPKEEPING 1st YEAR) | 14 | Number | |
| 1121 | 40.1 | ROAD J (UPKEEPING 1st YEAR) | 40 | Number | |
| 1122 | 40.11 | ROAD K (UPKEEPING I st YEAR) | 6 | Number | |
| 1123 | 40.12 | ROAD L (UPKEEPING I st YEAR) | 30 | Number | |
| 1124 | 40.13 | ROAD M(UPKEEPING ( I st YEAR) | 23 | Number | |
| 1125 | 40.14 | ROAD N (UPKEEPING 1st YEAR) | 9 | Number | |
| 1126 | 40.15 | ROAD O (UPKEEPING 1st YEAR) | 25 | Number | |
| 1127 | 40.16 | ROAD P (UPKEEPING 1st YEAR) | 12 | Number | |
| 1128 | 40.17 | ROAD Q (UPKEEPING 1st YEAR) | 11 | Number | |
| 1129 | 40.18 | ROAD R (UPKEEPING 1st YEAR) | 12 | Number | |
| 1130 | 40.19 | ROAD S (UPKEEPING 1st YEAR) | 9 | Number | |
| 1131 | 41 | painting the tree barks upto a size of 15cm x 15cm and painting with first class enamel paint as per avenue register complete | |||
| 1132 | 41.01 | ROAD A (UPKEEPING 2nd YEAR) | 0.61 | Square metre | |
| 1133 | 41.02 | ROAD A (UPKEEPING 3rd YEAR) | 0.61 | Square metre | |
| 1134 | 41.03 | ROAD A (UPKEEPING 4th YEAR) | 0.61 | Square metre | |
| 1135 | 41.04 | ROAD A (UPKEEPING 5th YEAR) | 0.61 | Square metre | |
| 1136 | 41.05 | ROAD B (UPKEEPING 2nd YEAR) | 1.28 | Square metre | |
| 1137 | 41.06 | ROAD B (UPKEEPING 3rd YEAR) | 1.28 | Square metre | |
| 1138 | 41.07 | ROAD B (UPKEEPING 4th YEAR) | 1.28 | Square metre | |
| 1139 | 41.08 | ROAD B (UPKEEPING 5th YEAR) | 1.28 | Square metre | |
| 1140 | 41.09 | ROAD C (UPKEEPING 2nd YEAR) | 0.68 | Square metre | |
| 1141 | 41.1 | ROAD C (UPKEEPING 3rd YEAR) | 0.68 | Square metre | |
| 1142 | 41.11 | ROAD C (UPKEEPING 4th YEAR) | 0.68 | Square metre | |
| 1143 | 41.12 | ROAD C (UPKEEPING 5th YEAR) | 0.68 | Square metre | |
| 1144 | 41.13 | ROAD D (UPKEEPING 2nd YEAR) | 0.29 | Square metre | |
| 1145 | 41.14 | ROAD D (UPKEEPING 3rd YEAR) | 0.29 | Square metre | |
| 1146 | 41.15 | ROAD D (UPKEEPING 4th YEAR) | 0.29 | Square metre | |
| 1147 | 41.16 | ROAD D (UPKEEPING 5th YEAR) | 0.29 | Square metre | |
| 1148 | 41.17 | ROAD E (UPKEEPING 2nd YEAR) | 0.2 | Square metre | |
| 1149 | 41.18 | ROAD E (UPKEEPING 3rd YEAR) | 0.2 | Square metre | |
| 1150 | 41.19 | ROAD E (UPKEEPING 4th YEAR) | 0.2 | Square metre | |
| 1151 | 41.2 | ROAD E (UPKEEPING 5th YEAR) | 0.2 | Square metre | |
| 1152 | 41.21 | ROAD F (UPKEEPING 2nd YEAR) | 0.09 | Square metre | |
| 1153 | 41.22 | ROAD F (UPKEEPING 3rd YEAR) | 0.09 | Square metre | |
| 1154 | 41.23 | ROAD F (UPKEEPING 4th YEAR) | 0.09 | Square metre | |
| 1155 | 41.24 | ROAD F (UPKEEPING 5th YEAR) | 0.09 | Square metre | |
| 1156 | 41.25 | ROAD G (UPKEEPING 2nd YEAR) | 0.2 | Square metre | |
| 1157 | 41.26 | ROAD G (UPKEEPING 3rd YEAR) | 0.2 | Square metre | |
| 1158 | 41.27 | ROAD G (UPKEEPING 4th YEAR) | 0.2 | Square metre | |
| 1159 | 41.28 | ROAD G (UPKEEPING 5th YEAR) | 0.2 | Square metre | |
| 1160 | 41.29 | ROAD H (UPKEEPING 2nd YEAR) | 0.16 | Square metre | |
| 1161 | 41.3 | ROAD H(UPKEEPING 3rd YEAR) | 0.16 | Square metre | |
| 1162 | 41.31 | ROAD H (UPKEEPING 4th YEAR) | 0.16 | Square metre | |
| 1163 | 41.32 | ROAD H (UPKEEPING 5th YEAR) | 0.16 | Square metre | |
| 1164 | 41.33 | ROAD I (UPKEEPING 2nd YEAR) | 0.32 | Square metre | |
| 1165 | 41.34 | ROAD I(UPKEEPING 3rd YEAR) | 0.32 | Square metre | |
| 1166 | 41.35 | ROAD I (UPKEEPING 4th YEAR) | 0.32 | Square metre | |
| 1167 | 41.36 | ROAD I (UPKEEPING 5th YEAR) | 0.32 | Square metre | |
| 1168 | 41.37 | ROAD J(UPKEEPING 2nd YEAR) | 0.9 | Square metre | |
| 1169 | 41.38 | ROAD J(UPKEEPING 3rd YEAR) | 0.9 | Square metre | |
| 1170 | 41.39 | ROAD J (UPKEEPING 4th YEAR) | 0.9 | Square metre | |
| 1171 | 41.4 | ROAD J (UPKEEPING 5th YEAR) | 0.9 | Square metre | |
| 1172 | 41.41 | ROAD K(UPKEEPING 2nd YEAR) | 0.14 | Square metre | |
| 1173 | 41.42 | ROAD K(UPKEEPING 3rd YEAR) | 0.14 | Square metre | |
| 1174 | 41.43 | ROAD K(UPKEEPING 4th YEAR) | 0.14 | Square metre | |
| 1175 | 41.44 | ROADK (UPKEEPING 5th YEAR) | 0.14 | Square metre | |
| 1176 | 41.45 | ROAD L (UPKEEPING 2nd YEAR) | 0.68 | Square metre | |
| 1177 | 41.46 | ROAD L (UPKEEPING 3rd YEAR) | 0.68 | Square metre | |
| 1178 | 41.47 | ROAD L (UPKEEPING 4th YEAR) | 0.68 | Square metre | |
| 1179 | 41.48 | ROAD L (UPKEEPING 5th YEAR) | 0.68 | Square metre | |
| 1180 | 41.49 | ROAD M(UPKEEPING 2nd YEAR) | 0.52 | Square metre | |
| 1181 | 41.5 | ROAD M(UPKEEPING ( 3rd YEAR) | 0.52 | Square metre | |
| 1182 | 41.51 | ROAD M (UPKEEPING 4th YEAR) | 0.52 | Square metre | |
| 1183 | 41.52 | ROAD M (UPKEEPING 5th YEAR) | 0.52 | Square metre | |
| 1184 | 41.53 | ROAD N(UPKEEPING 2nd YEAR) | 0.2 | Square metre | |
| 1185 | 41.54 | ROAD N(UPKEEPING 3rd YEAR) | 0.2 | Square metre | |
| 1186 | 41.55 | ROAD N(UPKEEPING 4th YEAR) | 0.2 | Square metre | |
| 1187 | 41.56 | ROAD N (UPKEEPING 5th YEAR) | 0.2 | Square metre | |
| 1188 | 41.57 | ROAD O(UPKEEPING 2nd YEAR) | 0.56 | Square metre | |
| 1189 | 41.58 | ROAD O(UPKEEPING 3rd YEAR) | 0.56 | Square metre | |
| 1190 | 41.59 | ROAD O(UPKEEPING 4th YEAR) | 0.56 | Square metre | |
| 1191 | 41.6 | ROAD O (UPKEEPING 5th YEAR) | 0.56 | Square metre | |
| 1192 | 41.61 | ROAD P(UPKEEPING 2nd YEAR) | 0.27 | Square metre | |
| 1193 | 41.62 | ROAD P(UPKEEPING 3rd YEAR) | 0.27 | Square metre | |
| 1194 | 41.63 | ROAD P(UPKEEPING 4th YEAR) | 0.27 | Square metre | |
| 1195 | 41.64 | ROAD P (UPKEEPING 5th YEAR) | 0.27 | Square metre | |
| 1196 | 41.65 | ROAD Q(UPKEEPING 2nd YEAR) | 0.25 | Square metre | |
| 1197 | 41.66 | ROAD Q(UPKEEPING 3rd YEAR) | 0.25 | Square metre | |
| 1198 | 41.67 | ROAD Q(UPKEEPING 4th YEAR) | 0.25 | Square metre | |
| 1199 | 41.68 | ROAD Q (UPKEEPING 5th YEAR) | 0.25 | Square metre | |
| 1200 | 41.69 | ROAD R(UPKEEPING 2nd YEAR) | 0.27 | Square metre | |
| 1201 | 41.7 | ROAD R(UPKEEPING 3rd YEAR) | 0.27 | Square metre | |
| 1202 | 41.71 | ROAD R(UPKEEPING 4th YEAR) | 0.27 | Square metre | |
| 1203 | 41.72 | ROAD R (UPKEEPING 5th YEAR) | 0.27 | Square metre | |
| 1204 | 41.73 | ROAD S(UPKEEPING 2nd YEAR) | 0.2 | Square metre | |
| 1205 | 41.74 | ROAD S(UPKEEPING 3rd YEAR) | 0.2 | Square metre | |
| 1206 | 41.75 | ROAD S(UPKEEPING 4th YEAR) | 0.2 | Square metre | |
| 1207 | 41.76 | ROAD S (UPKEEPING 5th YEAR) | 0.2 | Square metre | |
| 1208 | 42 | Lettering the tree barks upto a size of 15cm x 15cm and painting with first class enamel paint as per avenue register complete | |||
| 1209 | 42.01 | ROAD A (UPKEEPING 2nd YEAR) | 54 | Number | |
| 1210 | 42.02 | ROAD A (UPKEEPING 3rd YEAR) | 54 | Number | |
| 1211 | 42.03 | ROAD A (UPKEEPING 4th YEAR) | 54 | Number | |
| 1212 | 42.04 | ROAD A (UPKEEPING 5th YEAR) | 54 | Number | |
| 1213 | 42.05 | ROAD B (UPKEEPING 2nd YEAR) | 114 | Number | |
| 1214 | 42.06 | ROAD B (UPKEEPING 3rd YEAR) | 114 | Number | |
| 1215 | 42.07 | ROAD B (UPKEEPING 4th YEAR) | 114 | Number | |
| 1216 | 42.08 | ROAD B (UPKEEPING 5th YEAR) | 114 | Number | |
| 1217 | 42.09 | ROAD C (UPKEEPING 2nd YEAR) | 60 | Number | |
| 1218 | 42.1 | ROAD C (UPKEEPING 3rd YEAR) | 60 | Number | |
| 1219 | 42.11 | ROAD C (UPKEEPING 4th YEAR) | 60 | Number | |
| 1220 | 42.12 | ROAD C (UPKEEPING 5th YEAR) | 60 | Number | |
| 1221 | 42.13 | ROAD D (UPKEEPING 2nd YEAR) | 26 | Number | |
| 1222 | 42.14 | ROAD D (UPKEEPING 3rd YEAR) | 26 | Number | |
| 1223 | 42.15 | ROAD D (UPKEEPING 4th YEAR) | 26 | Number | |
| 1224 | 42.16 | ROAD D (UPKEEPING 5th YEAR) | 26 | Number | |
| 1225 | 42.17 | ROAD E (UPKEEPING 2nd YEAR) | 18 | Number | |
| 1226 | 42.18 | ROAD E (UPKEEPING 3rd YEAR) | 18 | Number | |
| 1227 | 42.19 | ROAD E (UPKEEPING 4th YEAR) | 18 | Number | |
| 1228 | 42.2 | ROAD E (UPKEEPING 5th YEAR) | 18 | Number | |
| 1229 | 42.21 | ROAD F (UPKEEPING 2nd YEAR) | 8 | Number | |
| 1230 | 42.22 | ROAD F (UPKEEPING 3rd YEAR) | 8 | Number | |
| 1231 | 42.23 | ROAD F (UPKEEPING 4th YEAR) | 8 | Number | |
| 1232 | 42.24 | ROAD F (UPKEEPING 5th YEAR) | 8 | Number | |
| 1233 | 42.25 | ROAD G (UPKEEPING 2nd YEAR) | 18 | Number | |
| 1234 | 42.26 | ROAD G (UPKEEPING 3rd YEAR) | 18 | Number | |
| 1235 | 42.27 | ROAD G (UPKEEPING 4th YEAR) | 18 | Number | |
| 1236 | 42.28 | ROAD G (UPKEEPING 5th YEAR) | 18 | Number | |
| 1237 | 42.29 | ROAD H (UPKEEPING 2nd YEAR) | 14 | Number | |
| 1238 | 42.3 | ROAD H(UPKEEPING 3rd YEAR) | 14 | Number | |
| 1239 | 42.31 | ROAD H (UPKEEPING 4th YEAR) | 14 | Number | |
| 1240 | 42.32 | ROAD H (UPKEEPING 5th YEAR) | 14 | Number | |
| 1241 | 42.33 | ROAD I (UPKEEPING 2nd YEAR) | 28 | Number | |
| 1242 | 42.34 | ROAD I(UPKEEPING 3rd YEAR) | 28 | Number | |
| 1243 | 42.35 | ROAD I (UPKEEPING 4th YEAR) | 28 | Number | |
| 1244 | 42.36 | ROAD I (UPKEEPING 5th YEAR) | 28 | Number | |
| 1245 | 42.37 | ROAD J(UPKEEPING 2nd YEAR) | 80 | Number | |
| 1246 | 42.38 | ROAD J(UPKEEPING 3rd YEAR) | 80 | Number | |
| 1247 | 42.39 | ROAD J (UPKEEPING 4th YEAR) | 80 | Number | |
| 1248 | 42.4 | ROAD J (UPKEEPING 5th YEAR) | 80 | Number | |
| 1249 | 42.41 | ROAD K(UPKEEPING 2nd YEAR) | 12 | Number | |
| 1250 | 42.42 | ROAD K(UPKEEPING 3rd YEAR) | 12 | Number | |
| 1251 | 42.43 | ROAD K(UPKEEPING 4th YEAR) | 12 | Number | |
| 1252 | 42.44 | ROADK (UPKEEPING 5th YEAR) | 12 | Number | |
| 1253 | 42.45 | ROAD L (UPKEEPING 2nd YEAR) | 60 | Number | |
| 1254 | 42.46 | ROAD L (UPKEEPING 3rd YEAR) | 60 | Number | |
| 1255 | 42.47 | ROAD L (UPKEEPING 4th YEAR) | 60 | Number | |
| 1256 | 42.48 | ROAD L (UPKEEPING 5th YEAR) | 60 | Number | |
| 1257 | 42.49 | ROAD M(UPKEEPING 2nd YEAR) | 46 | Number | |
| 1258 | 42.5 | ROAD M(UPKEEPING ( 3rd YEAR) | 46 | Number | |
| 1259 | 42.51 | ROAD M (UPKEEPING 4th YEAR) | 46 | Number | |
| 1260 | 42.52 | ROAD M (UPKEEPING 5th YEAR) | 46 | Number | |
| 1261 | 42.53 | ROAD N(UPKEEPING 2nd YEAR) | 18 | Number | |
| 1262 | 42.54 | ROAD N(UPKEEPING 3rd YEAR) | 18 | Number | |
| 1263 | 42.55 | ROAD N(UPKEEPING 4th YEAR) | 18 | Number | |
| 1264 | 42.56 | ROAD N (UPKEEPING 5th YEAR) | 18 | Number | |
| 1265 | 42.57 | ROAD O(UPKEEPING 2nd YEAR) | 50 | Number | |
| 1266 | 42.58 | ROAD O(UPKEEPING 3rd YEAR) | 50 | Number | |
| 1267 | 42.59 | ROAD O(UPKEEPING 4th YEAR) | 50 | Number | |
| 1268 | 42.6 | ROAD O (UPKEEPING 5th YEAR) | 50 | Number | |
| 1269 | 42.61 | ROAD P(UPKEEPING 2nd YEAR) | 24 | Number | |
| 1270 | 42.62 | ROAD P(UPKEEPING 3rd YEAR) | 24 | Number | |
| 1271 | 42.63 | ROAD P(UPKEEPING 4th YEAR) | 24 | Number | |
| 1272 | 42.64 | ROAD P (UPKEEPING 5th YEAR) | 24 | Number | |
| 1273 | 42.65 | ROAD Q(UPKEEPING 2nd YEAR) | 22 | Number | |
| 1274 | 42.66 | ROAD Q(UPKEEPING 3rd YEAR) | 22 | Number | |
| 1275 | 42.67 | ROAD Q(UPKEEPING 4th YEAR) | 22 | Number | |
| 1276 | 42.68 | ROAD Q (UPKEEPING 5th YEAR) | 22 | Number | |
| 1277 | 42.69 | ROAD R(UPKEEPING 2nd YEAR) | 24 | Number | |
| 1278 | 42.7 | ROAD R(UPKEEPING 3rd YEAR) | 24 | Number | |
| 1279 | 42.71 | ROAD R(UPKEEPING 4th YEAR) | 24 | Number | |
| 1280 | 42.72 | ROAD R (UPKEEPING 5th YEAR) | 24 | Number | |
| 1281 | 42.73 | ROAD S(UPKEEPING 2nd YEAR) | 18 | Number | |
| 1282 | 42.74 | ROAD S(UPKEEPING 3rd YEAR) | 18 | Number | |
| 1283 | 42.75 | ROAD S(UPKEEPING 4th YEAR) | 18 | Number | |
| 1284 | 42.76 | ROAD S (UPKEEPING 5th YEAR) | 18 | Number | |
| 1285 | 43 | Lettering the KM Stone as per IRC standard including the cost of Labour charges and material etc., complete | |||
| 1286 | 43.001 | ROAD A (UPKEEPING 2nd YEAR) (5 to 10 CM) | 30 | Number | |
| 1287 | 43.002 | ROAD A (UPKEEPING 2nd YEAR) (10 to 15 CM) | 4 | Number | |
| 1288 | 43.003 | ROAD A (UPKEEPING 3rd YEAR) (5 to 10 CM) | 30 | Number | |
| 1289 | 43.004 | ROAD A (UPKEEPING 3rd YEAR) (10 to 15 CM) | 4 | Number | |
| 1290 | 43.005 | ROAD A (UPKEEPING 4th YEAR) (5 to 10 CM) | 30 | Number | |
| 1291 | 43.006 | ROAD A (UPKEEPING 4th YEAR) (10 to 15 CM) | 4 | Number | |
| 1292 | 43.007 | ROAD A (UPKEEPING 5th YEAR) (5 to 10 CM) | 30 | Number | |
| 1293 | 43.008 | ROAD A (UPKEEPING 5th YEAR) (10 to 15 CM) | 4 | Number | |
| 1294 | 43.009 | ROAD B (UPKEEPING 2nd YEAR) (5 to 10 CM) | 30 | Number | |
| 1295 | 43.01 | ROAD B (UPKEEPING 2nd YEAR) (10 to 15 CM) | 4 | Number | |
| 1296 | 43.011 | ROAD B (UPKEEPING 3rd YEAR) (5 to 10 CM) | 30 | Number | |
| 1297 | 43.012 | ROAD B (UPKEEPING 3rd YEAR) (10 to 15 CM) | 4 | Number | |
| 1298 | 43.013 | ROAD B (UPKEEPING 4th YEAR) (5 to 10 CM) | 30 | Number | |
| 1299 | 43.014 | ROAD B (UPKEEPING 4th YEAR) (10 to 15 CM) | 4 | Number | |
| 1300 | 43.015 | ROAD B (UPKEEPING 5th YEAR) (5 to 10 CM) | 30 | Number | |
| 1301 | 43.016 | ROAD B (UPKEEPING 5th YEAR) (10 to 15 CM) | 4 | Number | |
| 1302 | 43.017 | ROAD C (UPKEEPING 2nd YEAR) (5 to 10 CM) | 45 | Number | |
| 1303 | 43.018 | ROAD C (UPKEEPING 2nd YEAR) (10 to 15 CM) | 6 | Number | |
| 1304 | 43.019 | ROAD C (UPKEEPING 3rd YEAR) (5 to 10 CM) | 45 | Number | |
| 1305 | 43.02 | ROAD C (UPKEEPING 3rd YEAR) (10 to 15 CM) | 6 | Number | |
| 1306 | 43.021 | ROAD C (UPKEEPING 4th YEAR) (5 to 10 CM) | 45 | Number | |
| 1307 | 43.022 | ROAD C (UPKEEPING 4th YEAR) (10 to 15 CM) | 6 | Number | |
| 1308 | 43.023 | ROAD C (UPKEEPING 5th YEAR) (5 to 10 CM) | 45 | Number | |
| 1309 | 43.024 | ROAD C (UPKEEPING 5th YEAR) (10 to 15 CM) | 6 | Number | |
| 1310 | 43.025 | ROAD D (UPKEEPING 2nd YEAR) (5 to 10 CM) | 30 | Number | |
| 1311 | 43.026 | ROAD D (UPKEEPING 2nd YEAR) (10 to 15 CM) | 4 | Number | |
| 1312 | 43.027 | ROAD D (UPKEEPING 3rd YEAR) (5 to 10 CM) | 30 | Number | |
| 1313 | 43.028 | ROAD D (UPKEEPING 3rd YEAR) (10 to 15 CM) | 4 | Number | |
| 1314 | 43.029 | ROAD D (UPKEEPING 4th YEAR) (5 to 10 CM) | 30 | Number | |
| 1315 | 43.03 | ROAD D (UPKEEPING 4th YEAR) (10 to 15 CM) | 4 | Number | |
| 1316 | 43.031 | ROAD D (UPKEEPING 5th YEAR) (5 to 10 CM) | 30 | Number | |
| 1317 | 43.032 | ROAD D (UPKEEPING 5th YEAR) (10 to 15 CM) | 4 | Number | |
| 1318 | 43.033 | ROAD E (UPKEEPING 2nd YEAR) (5 to 10 CM) | 45 | Number | |
| 1319 | 43.034 | ROAD E (UPKEEPING 2nd YEAR) (10 to 15 CM) | 6 | Number | |
| 1320 | 43.035 | ROAD E (UPKEEPING 3rd YEAR) (5 to 10 CM) | 45 | Number | |
| 1321 | 43.036 | ROAD E (UPKEEPING 3rd YEAR) (10 to 15 CM) | 6 | Number | |
| 1322 | 43.037 | ROAD E (UPKEEPING 4th YEAR) (5 to 10 CM) | 45 | Number | |
| 1323 | 43.038 | ROAD E (UPKEEPING 4th YEAR) (10 to 15 CM) | 6 | Number | |
| 1324 | 43.039 | ROAD E (UPKEEPING 5th YEAR) (5 to 10 CM) | 45 | Number | |
| 1325 | 43.04 | ROAD E (UPKEEPING 5th YEAR) (10 to 15 CM) | 6 | Number | |
| 1326 | 43.041 | ROAD F (UPKEEPING 2nd YEAR) (5 to 10 CM) | 45 | Number | |
| 1327 | 43.042 | ROAD F (UPKEEPING 2nd YEAR) (10 to 15 CM) | 6 | Number | |
| 1328 | 43.043 | ROAD F (UPKEEPING 3rd YEAR) (5 to 10 CM) | 45 | Number | |
| 1329 | 43.044 | ROAD F (UPKEEPING 3rd YEAR) (10 to 15 CM) | 6 | Number | |
| 1330 | 43.045 | ROAD F (UPKEEPING 4th YEAR) (5 to 10 CM) | 45 | Number | |
| 1331 | 43.046 | ROAD F (UPKEEPING 4th YEAR) (10 to 15 CM) | 6 | Number | |
| 1332 | 43.047 | ROAD F (UPKEEPING 5th YEAR) (5 to 10 CM) | 45 | Number | |
| 1333 | 43.048 | ROAD F (UPKEEPING 5th YEAR) (10 to 15 CM) | 6 | Number | |
| 1334 | 43.049 | ROAD G (UPKEEPING 2nd YEAR) (5 to 10 CM) | 45 | Number | |
| 1335 | 43.05 | ROAD G (UPKEEPING 2nd YEAR) (10 to 15 CM) | 6 | Number | |
| 1336 | 43.051 | ROAD G (UPKEEPING 3rd YEAR) (5 to 10 CM) | 45 | Number | |
| 1337 | 43.052 | ROAD G (UPKEEPING 3rd YEAR) (10 to 15 CM) | 6 | Number | |
| 1338 | 43.053 | ROAD G (UPKEEPING 4th YEAR) (5 to 10 CM) | 45 | Number | |
| 1339 | 43.054 | ROAD G (UPKEEPING 4th YEAR) (10 to 15 CM) | 6 | Number | |
| 1340 | 43.055 | ROAD G (UPKEEPING 5th YEAR) (5 to 10 CM) | 45 | Number | |
| 1341 | 43.056 | ROAD G (UPKEEPING 5th YEAR) (10 to 15 CM) | 6 | Number | |
| 1342 | 43.057 | ROAD H (UPKEEPING 2th YEAR) (5 to 10 CM) | 15 | Number | |
| 1343 | 43.058 | ROAD H (UPKEEPING 2nd YEAR) (10 to 15 CM) | 2 | Number | |
| 1344 | 43.059 | ROAD H (UPKEEPING 3rd YEAR) (5 to 10 CM) | 15 | Number | |
| 1345 | 43.06 | ROAD H (UPKEEPING 3TH YEAR) (10 to 15 CM) | 2 | Number | |
| 1346 | 43.061 | ROAD H(UPKEEPING 4th YEAR) (5 to 10 CM) | 15 | Number | |
| 1347 | 43.062 | ROAD H (UPKEEPING 4th YEAR) (10 to 15 CM) | 2 | Number | |
| 1348 | 43.063 | ROAD H (UPKEEPING 5th YEAR) (5 to 10 CM) | 15 | Number | |
| 1349 | 43.064 | ROAD H (UPKEEPING 5th YEAR) (10 to 15 CM) | 2 | Number | |
| 1350 | 43.065 | ROAD I (UPKEEPING 2rd YEAR) (5 to 10 CM) | 30 | Number | |
| 1351 | 43.066 | ROAD I (UPKEEPING 2nd YEAR) (10 to 15 CM) | 4 | Number | |
| 1352 | 43.067 | ROAD I (UPKEEPING 3rd YEAR) (5 to 10 CM) | 30 | Number | |
| 1353 | 43.068 | ROAD I (UPKEEPING 3TH YEAR) (10 to 15 CM) | 4 | Number | |
| 1354 | 43.069 | ROAD I (UPKEEPING 4th YEAR) (5 to 10 CM) | 30 | Number | |
| 1355 | 43.07 | ROAD I (UPKEEPING 4th YEAR) (10 to 15 CM) | 4 | Number | |
| 1356 | 43.071 | ROAD I (UPKEEPING 5th YEAR) (5 to 10 CM) | 30 | Number | |
| 1357 | 43.072 | ROAD I (UPKEEPING 5th YEAR) (10 to 15 CM) | 4 | Number | |
| 1358 | 43.073 | ROAD J (UPKEEPING 2rd YEAR) (5 to 10 CM) | 30 | Number | |
| 1359 | 43.074 | ROAD J (UPKEEPING 2nd YEAR) (10 to 15 CM) | 4 | Number | |
| 1360 | 43.075 | ROAD J (UPKEEPING 3rd YEAR) (5 to 10 CM) | 30 | Number | |
| 1361 | 43.076 | ROAD J (UPKEEPING 3TH YEAR) (10 to 15 CM) | 4 | Number | |
| 1362 | 43.077 | ROAD J(UPKEEPING 4th YEAR) (5 to 10 CM) | 30 | Number | |
| 1363 | 43.078 | ROAD J (UPKEEPING 4th YEAR) (10 to 15 CM) | 4 | Number | |
| 1364 | 43.079 | ROAD J (UPKEEPING 5th YEAR) (5 to 10 CM) | 30 | Number | |
| 1365 | 43.08 | ROAD J (UPKEEPING 5th YEAR) (10 to 15 CM) | 4 | Number | |
| 1366 | 43.081 | ROAD K(UPKEEPING 2rd YEAR) (5 to 10 CM) | 15 | Number | |
| 1367 | 43.082 | ROAD K (UPKEEPING 2nd YEAR) (10 to 15 CM) | 2 | Number | |
| 1368 | 43.083 | ROAD K (UPKEEPING 3rd YEAR) (5 to 10 CM) | 15 | Number | |
| 1369 | 43.084 | ROAD K(UPKEEPING 3TH YEAR) (10 to 15 CM) | 2 | Number | |
| 1370 | 43.085 | ROAD K(UPKEEPING 4th YEAR) (5 to 10 CM) | 15 | Number | |
| 1371 | 43.086 | ROAD K(UPKEEPING 4th YEAR) (10 to 15 CM) | 2 | Number | |
| 1372 | 43.087 | ROAD K (UPKEEPING 5th YEAR) (5 to 10 CM) | 15 | Number | |
| 1373 | 43.088 | ROAD K (UPKEEPING 5th YEAR) (10 to 15 CM) | 2 | Number | |
| 1374 | 43.089 | ROAD L (UPKEEPING 2rd YEAR) (5 to 10 CM) | 30 | Number | |
| 1375 | 43.09 | ROAD L (UPKEEPING 2nd YEAR) (10 to 15 CM) | 4 | Number | |
| 1376 | 43.091 | ROAD L (UPKEEPING 3rd YEAR) (5 to 10 CM) | 30 | Number | |
| 1377 | 43.092 | ROAD L(UPKEEPING 3TH YEAR) (10 to 15 CM) | 4 | Number | |
| 1378 | 43.093 | ROAD L(UPKEEPING 4th YEAR) (5 to 10 CM) | 30 | Number | |
| 1379 | 43.094 | ROAD L(UPKEEPING 4th YEAR) (10 to 15 CM) | 4 | Number | |
| 1380 | 43.095 | ROAD L (UPKEEPING 5th YEAR) (5 to 10 CM) | 30 | Number | |
| 1381 | 43.096 | ROAD L (UPKEEPING 5th YEAR) (10 to 15 CM) | 4 | Number | |
| 1382 | 43.097 | ROAD M(UPKEEPING 2rd YEAR) (5 to 10 CM) | 30 | Number | |
| 1383 | 43.098 | ROAD M (UPKEEPING 2nd YEAR) (10 to 15 CM) | 4 | Number | |
| 1384 | 43.099 | ROAD M (UPKEEPING 3rd YEAR) (5 to 10 CM) | 30 | Number | |
| 1385 | 43.1 | ROAD M(UPKEEPING 3TH YEAR) (10 to 15 CM) | 4 | Number | |
| 1386 | 43.101 | ROAD M(UPKEEPING 4th YEAR) (5 to 10 CM) | 30 | Number | |
| 1387 | 43.102 | ROAD M(UPKEEPING 4th YEAR) (10 to 15 CM) | 4 | Number | |
| 1388 | 43.103 | ROAD M (UPKEEPING 5th YEAR) (5 to 10 CM) | 30 | Number | |
| 1389 | 43.104 | ROAD M (UPKEEPING 5th YEAR) (10 to 15 CM) | 4 | Number | |
| 1390 | 43.105 | ROAD N(UPKEEPING 2rd YEAR) (5 to 10 CM) | 30 | Number | |
| 1391 | 43.106 | ROAD N (UPKEEPING 2nd YEAR) (10 to 15 CM) | 4 | Number | |
| 1392 | 43.107 | ROAD N (UPKEEPING 3rd YEAR) (5 to 10 CM) | 30 | Number | |
| 1393 | 43.108 | ROAD N(UPKEEPING 3TH YEAR) (10 to 15 CM) | 4 | Number | |
| 1394 | 43.109 | ROAD N(UPKEEPING 4th YEAR) (5 to 10 CM) | 30 | Number | |
| 1395 | 43.11 | ROAD N(UPKEEPING 4th YEAR) (10 to 15 CM) | 4 | Number | |
| 1396 | 43.111 | ROAD N (UPKEEPING 5th YEAR) (5 to 10 CM) | 30 | Number | |
| 1397 | 43.112 | ROAD N (UPKEEPING 5th YEAR) (10 to 15 CM) | 4 | Number | |
| 1398 | 43.113 | ROAD O(UPKEEPING 2rd YEAR) (5 to 10 CM) | 15 | Number | |
| 1399 | 43.114 | ROAD O (UPKEEPING 2nd YEAR) (10 to 15 CM) | 2 | Number | |
| 1400 | 43.115 | ROAD O (UPKEEPING 3rd YEAR) (5 to 10 CM) | 15 | Number | |
| 1401 | 43.116 | ROAD O(UPKEEPING 3TH YEAR) (10 to 15 CM) | 2 | Number | |
| 1402 | 43.117 | ROAD O(UPKEEPING 4th YEAR) (5 to 10 CM) | 15 | Number | |
| 1403 | 43.118 | ROAD O(UPKEEPING 4th YEAR) (10 to 15 CM) | 2 | Number | |
| 1404 | 43.119 | ROAD O (UPKEEPING 5th YEAR) (5 to 10 CM) | 15 | Number | |
| 1405 | 43.12 | ROAD O (UPKEEPING 5th YEAR) (10 to 15 CM) | 2 | Number | |
| 1406 | 43.121 | ROAD P(UPKEEPING 2rd YEAR) (5 to 10 CM) | 15 | Number | |
| 1407 | 43.122 | ROAD P (UPKEEPING 2nd YEAR) (10 to 15 CM) | 2 | Number | |
| 1408 | 43.123 | ROAD P (UPKEEPING 3rd YEAR) (5 to 10 CM) | 15 | Number | |
| 1409 | 43.124 | ROAD P(UPKEEPING 3TH YEAR) (10 to 15 CM) | 2 | Number | |
| 1410 | 43.125 | ROAD P(UPKEEPING 4th YEAR) (5 to 10 CM) | 15 | Number | |
| 1411 | 43.126 | ROAD P(UPKEEPING 4th YEAR) (10 to 15 CM) | 2 | Number | |
| 1412 | 43.127 | ROAD P (UPKEEPING 5th YEAR) (5 to 10 CM) | 15 | Number | |
| 1413 | 43.128 | ROAD P (UPKEEPING 5th YEAR) (10 to 15 CM) | 2 | Number | |
| 1414 | 43.129 | ROAD Q(UPKEEPING 2rd YEAR) (5 to 10 CM) | 15 | Number | |
| 1415 | 43.13 | ROAD Q (UPKEEPING 2nd YEAR) (10 to 15 CM) | 2 | Number | |
| 1416 | 43.131 | ROAD Q (UPKEEPING 3rd YEAR) (5 to 10 CM) | 15 | Number | |
| 1417 | 43.132 | ROAD Q(UPKEEPING 3TH YEAR) (10 to 15 CM) | 2 | Number | |
| 1418 | 43.133 | ROAD Q(UPKEEPING 4th YEAR) (5 to 10 CM) | 15 | Number | |
| 1419 | 43.134 | ROAD Q(UPKEEPING 4th YEAR) (10 to 15 CM) | 2 | Number | |
| 1420 | 43.135 | ROAD Q (UPKEEPING 5th YEAR) (5 to 10 CM) | 15 | Number | |
| 1421 | 43.136 | ROAD Q (UPKEEPING 5th YEAR) (10 to 15 CM) | 2 | Number | |
| 1422 | 43.137 | ROAD R(UPKEEPING 2rd YEAR) (5 to 10 CM) | 15 | Number | |
| 1423 | 43.138 | ROAD R (UPKEEPING 2nd YEAR) (10 to 15 CM) | 2 | Number | |
| 1424 | 43.139 | ROAD R (UPKEEPING 3rd YEAR) (5 to 10 CM) | 15 | Number | |
| 1425 | 43.14 | ROAD R(UPKEEPING 3TH YEAR) (10 to 15 CM) | 2 | Number | |
| 1426 | 43.141 | ROAD R(UPKEEPING 4th YEAR) (5 to 10 CM) | 15 | Number | |
| 1427 | 43.142 | ROAD R(UPKEEPING 4th YEAR) (10 to 15 CM) | 2 | Number | |
| 1428 | 43.143 | ROAD R (UPKEEPING 5th YEAR) (5 to 10 CM) | 15 | Number | |
| 1429 | 43.144 | ROAD R (UPKEEPING 5th YEAR) (10 to 15 CM) | 2 | Number | |
| 1430 | 43.145 | ROAD S(UPKEEPING 2rd YEAR) (5 to 10 CM) | 30 | Number | |
| 1431 | 43.146 | ROAD S (UPKEEPING 2nd YEAR) (10 to 15 CM) | 4 | Number | |
| 1432 | 43.147 | ROAD S (UPKEEPING 3rd YEAR) (5 to 10 CM) | 30 | Number | |
| 1433 | 43.148 | ROAD S(UPKEEPING 3TH YEAR) (10 to 15 CM) | 4 | Number | |
| 1434 | 43.149 | ROAD S(UPKEEPING 4th YEAR) (5 to 10 CM) | 30 | Number | |
| 1435 | 43.15 | ROAD S(UPKEEPING 4th YEAR) (10 to 15 CM) | 4 | Number | |
| 1436 | 43.151 | ROAD S (UPKEEPING 5th YEAR) (5 to 10 CM) | 30 | Number | |
| 1437 | 43.152 | ROAD S(UPKEEPING 5th YEAR) (10 to 15 CM) | 4 | Number | |
| 1438 | 44 | Lettering the HM Stone and Culvert as per IRC standard including the cost of Labour charges and material etc., complete | |||
| 1439 | 44.001 | ROAD A (UPKEEPING 1st YEAR) (5 to 10 CM) | 75 | Number | |
| 1440 | 44.002 | ROAD A (UPKEEPING 2nd YEAR) (5 to 10 CM) | 149 | Number | |
| 1441 | 44.003 | ROAD A (UPKEEPING 2nd YEAR) (10 to 15 CM) | 24 | Number | |
| 1442 | 44.004 | ROAD A (UPKEEPING 3rd YEAR) (5 to 10 CM) | 149 | Number | |
| 1443 | 44.005 | ROAD A (UPKEEPING 3rd YEAR) (10 to 15 CM) | 24 | Number | |
| 1444 | 44.006 | ROAD A (UPKEEPING 4th YEAR) (5 to 10 CM) | 149 | Number | |
| 1445 | 44.007 | ROAD A (UPKEEPING 4th YEAR) (10 to 15 CM) | 24 | Number | |
| 1446 | 44.008 | ROAD A (UPKEEPING 5th YEAR) (5 to 10 CM) | 149 | Number | |
| 1447 | 44.009 | ROAD A (UPKEEPING 5th YEAR) (10 to 15 CM) | 24 | Number | |
| 1448 | 44.01 | ROAD B (UPKEEPING 1st YEAR) (5 to 10 CM) | 250 | Number | |
| 1449 | 44.011 | ROAD B (UPKEEPING 2nd YEAR) (5 to 10 CM) | 295 | Number | |
| 1450 | 44.012 | ROAD B (UPKEEPING 2nd YEAR) (10 to 15 CM) | 20 | Number | |
| 1451 | 44.013 | ROAD B (UPKEEPING 3rd YEAR) (5 to 10 CM) | 295 | Number | |
| 1452 | 44.014 | ROAD B (UPKEEPING 3rd YEAR) (10 to 15 CM) | 20 | Number | |
| 1453 | 44.015 | ROAD B (UPKEEPING 4th YEAR) (5 to 10 CM) | 295 | Number | |
| 1454 | 44.016 | ROAD B (UPKEEPING 4th YEAR) (10 to 15 CM) | 20 | Number | |
| 1455 | 44.017 | ROAD B (UPKEEPING 5th YEAR) (5 to 10 CM) | 295 | Number | |
| 1456 | 44.018 | ROAD B (UPKEEPING 5th YEAR) (10 to 15 CM) | 20 | Number | |
| 1457 | 44.019 | ROAD C (UPKEEPING 1st YEAR) (5 to 10 CM) | 175 | Number | |
| 1458 | 44.02 | ROAD C (UPKEEPING 2nd YEAR) (5 to 10 CM) | 249 | Number | |
| 1459 | 44.021 | ROAD C (UPKEEPING 2nd YEAR) (10 to 15 CM) | 24 | Number | |
| 1460 | 44.022 | ROAD C (UPKEEPING 3rd YEAR) (5 to 10 CM) | 249 | Number | |
| 1461 | 44.023 | ROAD C (UPKEEPING 3rd YEAR) (10 to 15 CM) | 24 | Number | |
| 1462 | 44.024 | ROAD C (UPKEEPING 4th YEAR) (5 to 10 CM) | 249 | Number | |
| 1463 | 44.025 | ROAD C (UPKEEPING 4th YEAR) (10 to 15 CM) | 24 | Number | |
| 1464 | 44.026 | ROAD C (UPKEEPING 5th YEAR) (5 to 10 CM) | 249 | Number | |
| 1465 | 44.027 | ROAD C (UPKEEPING 5th YEAR) (10 to 15 CM) | 24 | Number | |
| 1466 | 44.028 | ROAD D (UPKEEPING 1st YEAR) (5 to 10 CM) | 75 | Number | |
| 1467 | 44.029 | ROAD D (UPKEEPING 2nd YEAR) (5 to 10 CM) | 114 | Number | |
| 1468 | 44.03 | ROAD D (UPKEEPING 2nd YEAR) (10 to 15 CM) | 14 | Number | |
| 1469 | 44.031 | ROAD D (UPKEEPING 3rd YEAR) (5 to 10 CM) | 114 | Number | |
| 1470 | 44.032 | ROAD D (UPKEEPING 3rd YEAR) (10 to 15 CM) | 14 | Number | |
| 1471 | 44.033 | ROAD D (UPKEEPING 4th YEAR) (5 to 10 CM) | 114 | Number | |
| 1472 | 44.034 | ROAD D (UPKEEPING 4th YEAR) (10 to 15 CM) | 14 | Number | |
| 1473 | 44.035 | ROAD D (UPKEEPING 5th YEAR) (5 to 10 CM) | 114 | Number | |
| 1474 | 44.036 | ROAD D (UPKEEPING 5th YEAR) (10 to 15 CM) | 14 | Number | |
| 1475 | 44.037 | ROAD E (UPKEEPING 1st YEAR) (5 to 10 CM) | 150 | Number | |
| 1476 | 44.038 | ROAD E (UPKEEPING 2nd YEAR) (5 to 10 CM) | 216 | Number | |
| 1477 | 44.039 | ROAD E (UPKEEPING 2nd YEAR) (10 to 15 CM) | 16 | Number | |
| 1478 | 44.04 | ROAD E (UPKEEPING 3rd YEAR) (5 to 10 CM) | 216 | Number | |
| 1479 | 44.041 | ROAD E (UPKEEPING 3rd YEAR) (10 to 15 CM) | 16 | Number | |
| 1480 | 44.042 | ROAD E (UPKEEPING 4th YEAR) (5 to 10 CM) | 216 | Number | |
| 1481 | 44.043 | ROAD E (UPKEEPING 4th YEAR) (10 to 15 CM) | 16 | Number | |
| 1482 | 44.044 | ROAD E (UPKEEPING 5th YEAR) (5 to 10 CM) | 216 | Number | |
| 1483 | 44.045 | ROAD E (UPKEEPING 5th YEAR) (10 to 15 CM) | 16 | Number | |
| 1484 | 44.046 | ROAD F (UPKEEPING 1st YEAR) (5 to 10 CM) | 125 | Number | |
| 1485 | 44.047 | ROAD F (UPKEEPING 2nd YEAR) (5 to 10 CM) | 166 | Number | |
| 1486 | 44.048 | ROAD F (UPKEEPING 2nd YEAR) (10 to 15 CM) | 16 | Number | |
| 1487 | 44.049 | ROAD F (UPKEEPING 3rd YEAR) (5 to 10 CM) | 166 | Number | |
| 1488 | 44.05 | ROAD F (UPKEEPING 3rd YEAR) (10 to 15 CM) | 16 | Number | |
| 1489 | 44.051 | ROAD F (UPKEEPING 4th YEAR) (5 to 10 CM) | 166 | Number | |
| 1490 | 44.052 | ROAD F (UPKEEPING 4th YEAR) (10 to 15 CM) | 16 | Number | |
| 1491 | 44.053 | ROAD F (UPKEEPING 5th YEAR) (5 to 10 CM) | 166 | Number | |
| 1492 | 44.054 | ROAD F (UPKEEPING 5th YEAR) (10 to 15 CM) | 16 | Number | |
| 1493 | 44.055 | ROAD G (UPKEEPING 1st YEAR) (5 to 10 CM) | 200 | Number | |
| 1494 | 44.056 | ROAD G (UPKEEPING 2nd YEAR) (5 to 10 CM) | 247 | Number | |
| 1495 | 44.057 | ROAD G (UPKEEPING 2nd YEAR) (10 to 15 CM) | 22 | Number | |
| 1496 | 44.058 | ROAD G (UPKEEPING 3rd YEAR) (5 to 10 CM) | 247 | Number | |
| 1497 | 44.059 | ROAD G (UPKEEPING 3rd YEAR) (10 to 15 CM) | 22 | Number | |
| 1498 | 44.06 | ROAD G (UPKEEPING 4th YEAR) (5 to 10 CM) | 247 | Number | |
| 1499 | 44.061 | ROAD G (UPKEEPING 4th YEAR) (10 to 15 CM) | 22 | Number | |
| 1500 | 44.062 | ROAD G(UPKEEPING 5th YEAR) (5 to 10 CM) | 247 | Number | |
| 1501 | 44.063 | ROAD G (UPKEEPING 5th YEAR) (10 to 15 CM) | 22 | Number | |
| 1502 | 44.064 | ROAD H (UPKEEPING 1st YEAR) (5 to 10 CM) | 150 | Number | |
| 1503 | 44.065 | ROAD H (UPKEEPING 2rd YEAR) (5 to 10 CM) | 166 | Number | |
| 1504 | 44.066 | ROAD H (UPKEEPING 2nd YEAR) (10 to 15 CM) | 16 | Number | |
| 1505 | 44.067 | ROAD H (UPKEEPING 3rd YEAR) (5 to 10 CM) | 166 | Number | |
| 1506 | 44.068 | ROAD H (UPKEEPING 3TH YEAR) (10 to 15 CM) | 16 | Number | |
| 1507 | 44.069 | ROAD H(UPKEEPING 4th YEAR) (5 to 10 CM) | 166 | Number | |
| 1508 | 44.07 | ROAD H (UPKEEPING 4th YEAR) (10 to 15 CM) | 16 | Number | |
| 1509 | 44.071 | ROAD H (UPKEEPING 5th YEAR) (5 to 10 CM) | 166 | Number | |
| 1510 | 44.072 | ROAD H (UPKEEPING 5th YEAR) (10 to 15 CM) | 16 | Number | |
| 1511 | 44.073 | ROAD I (UPKEEPING 1st YEAR) (5 to 10 CM) | 125 | Number | |
| 1512 | 44.074 | ROAD I (UPKEEPING 2rd YEAR) (5 to 10 CM) | 141 | Number | |
| 1513 | 44.075 | ROAD I (UPKEEPING 2nd YEAR) (10 to 15 CM) | 16 | Number | |
| 1514 | 44.076 | ROAD I (UPKEEPING 3rd YEAR) (5 to 10 CM) | 141 | Number | |
| 1515 | 44.077 | ROAD I (UPKEEPING 3TH YEAR) (10 to 15 CM) | 16 | Number | |
| 1516 | 44.078 | ROAD I (UPKEEPING 4th YEAR) (5 to 10 CM) | 141 | Number | |
| 1517 | 44.079 | ROAD I (UPKEEPING 4th YEAR) (10 to 15 CM) | 16 | Number | |
| 1518 | 44.08 | ROAD I (UPKEEPING 5th YEAR) (5 to 10 CM) | 141 | Number | |
| 1519 | 44.081 | ROAD I (UPKEEPING 5th YEAR) (10 to 15 CM) | 16 | Number | |
| 1520 | 44.082 | ROAD J (UPKEEPING 1st YEAR) (5 to 10 CM) | 200 | Number | |
| 1521 | 44.083 | ROAD J (UPKEEPING 2rd YEAR) (5 to 10 CM) | 216 | Number | |
| 1522 | 44.084 | ROAD J (UPKEEPING 2nd YEAR) (10 to 15 CM) | 16 | Number | |
| 1523 | 44.085 | ROAD J (UPKEEPING 3rd YEAR) (5 to 10 CM) | 216 | Number | |
| 1524 | 44.086 | ROAD J (UPKEEPING 3TH YEAR) (10 to 15 CM) | 16 | Number | |
| 1525 | 44.087 | ROAD J(UPKEEPING 4th YEAR) (5 to 10 CM) | 216 | Number | |
| 1526 | 44.088 | ROAD J (UPKEEPING 4th YEAR) (10 to 15 CM) | 16 | Number | |
| 1527 | 44.089 | ROAD J (UPKEEPING 5th YEAR) (5 to 10 CM) | 216 | Number | |
| 1528 | 44.09 | ROAD J (UPKEEPING 5th YEAR) (10 to 15 CM) | 16 | Number | |
| 1529 | 44.091 | ROAD K(UPKEEPING 1st YEAR) (5 to 10 CM) | 25 | Number | |
| 1530 | 44.092 | ROAD K(UPKEEPING 2rd YEAR) (5 to 10 CM) | 41 | Number | |
| 1531 | 44.093 | ROAD K (UPKEEPING 2nd YEAR) (10 to 15 CM) | 16 | Number | |
| 1532 | 44.094 | ROAD K (UPKEEPING 3rd YEAR) (5 to 10 CM) | 41 | Number | |
| 1533 | 44.095 | ROAD K(UPKEEPING 3TH YEAR) (10 to 15 CM) | 16 | Number | |
| 1534 | 44.096 | ROAD K(UPKEEPING 4th YEAR) (5 to 10 CM) | 41 | Number | |
| 1535 | 44.097 | ROAD K(UPKEEPING 4th YEAR) (10 to 15 CM) | 16 | Number | |
| 1536 | 44.098 | ROAD K (UPKEEPING 5th YEAR) (5 to 10 CM) | 41 | Number | |
| 1537 | 44.099 | ROAD K (UPKEEPING 5th YEAR) (10 to 15 CM) | 16 | Number | |
| 1538 | 44.1 | ROAD L(UPKEEPING 1st YEAR) (5 to 10 CM) | 125 | Number | |
| 1539 | 44.101 | ROAD L (UPKEEPING 2rd YEAR) (5 to 10 CM) | 141 | Number | |
| 1540 | 44.102 | ROAD L (UPKEEPING 2nd YEAR) (10 to 15 CM) | 16 | Number | |
| 1541 | 44.103 | ROAD L (UPKEEPING 3rd YEAR) (5 to 10 CM) | 141 | Number | |
| 1542 | 44.104 | ROAD L(UPKEEPING 3TH YEAR) (10 to 15 CM) | 16 | Number | |
| 1543 | 44.105 | ROAD L(UPKEEPING 4th YEAR) (5 to 10 CM) | 141 | Number | |
| 1544 | 44.106 | ROAD L(UPKEEPING 4th YEAR) (10 to 15 CM) | 16 | Number | |
| 1545 | 44.107 | ROAD L (UPKEEPING 5th YEAR) (5 to 10 CM) | 141 | Number | |
| 1546 | 44.108 | ROAD L (UPKEEPING 5th YEAR) (10 to 15 CM) | 16 | Number | |
| 1547 | 44.109 | ROAD M(UPKEEPING 1st YEAR) (5 to 10 CM) | 125 | Number | |
| 1548 | 44.11 | ROAD M(UPKEEPING 2rd YEAR) (5 to 10 CM) | 141 | Number | |
| 1549 | 44.111 | ROAD M (UPKEEPING 2nd YEAR) (10 to 15 CM) | 16 | Number | |
| 1550 | 44.112 | ROAD M (UPKEEPING 3rd YEAR) (5 to 10 CM) | 141 | Number | |
| 1551 | 44.113 | ROAD M(UPKEEPING 3TH YEAR) (10 to 15 CM) | 16 | Number | |
| 1552 | 44.114 | ROAD M(UPKEEPING 4th YEAR) (5 to 10 CM) | 141 | Number | |
| 1553 | 44.115 | ROAD M(UPKEEPING 4th YEAR) (10 to 15 CM) | 16 | Number | |
| 1554 | 44.116 | ROAD M (UPKEEPING 5th YEAR) (5 to 10 CM) | 141 | Number | |
| 1555 | 44.117 | ROAD M (UPKEEPING 5th YEAR) (10 to 15 CM) | 16 | Number | |
| 1556 | 44.118 | ROAD N(UPKEEPING 1st YEAR) (5 to 10 CM) | 100 | Number | |
| 1557 | 44.119 | ROAD N(UPKEEPING 2rd YEAR) (5 to 10 CM) | 116 | Number | |
| 1558 | 44.12 | ROAD N (UPKEEPING 2nd YEAR) (10 to 15 CM) | 16 | Number | |
| 1559 | 44.121 | ROAD N (UPKEEPING 3rd YEAR) (5 to 10 CM) | 116 | Number | |
| 1560 | 44.122 | ROAD N(UPKEEPING 3TH YEAR) (10 to 15 CM) | 16 | Number | |
| 1561 | 44.123 | ROAD N(UPKEEPING 4th YEAR) (5 to 10 CM) | 116 | Number | |
| 1562 | 44.124 | ROAD N(UPKEEPING 4th YEAR) (10 to 15 CM) | 16 | Number | |
| 1563 | 44.125 | ROAD N (UPKEEPING 5th YEAR) (5 to 10 CM) | 116 | Number | |
| 1564 | 44.126 | ROAD N (UPKEEPING 5th YEAR) (10 to 15 CM) | 16 | Number | |
| 1565 | 44.127 | ROAD O(UPKEEPING 1st YEAR) (5 to 10 CM) | 75 | Number | |
| 1566 | 44.128 | ROAD O(UPKEEPING 2rd YEAR) (5 to 10 CM) | 87 | Number | |
| 1567 | 44.129 | ROAD O (UPKEEPING 2nd YEAR) (10 to 15 CM) | 12 | Number | |
| 1568 | 44.13 | ROAD O (UPKEEPING 3rd YEAR) (5 to 10 CM) | 87 | Number | |
| 1569 | 44.131 | ROAD O(UPKEEPING 3TH YEAR) (10 to 15 CM) | 12 | Number | |
| 1570 | 44.132 | ROAD O(UPKEEPING 4th YEAR) (5 to 10 CM) | 87 | Number | |
| 1571 | 44.133 | ROAD O(UPKEEPING 4th YEAR) (10 to 15 CM) | 12 | Number | |
| 1572 | 44.134 | ROAD O (UPKEEPING 5th YEAR) (5 to 10 CM) | 87 | Number | |
| 1573 | 44.135 | ROAD O (UPKEEPING 5th YEAR) (10 to 15 CM) | 12 | Number | |
| 1574 | 44.136 | ROAD P(UPKEEPING 1st YEAR) (5 to 10 CM) | 25 | Number | |
| 1575 | 44.137 | ROAD P(UPKEEPING 2rd YEAR) (5 to 10 CM) | 33 | Number | |
| 1576 | 44.138 | ROAD P (UPKEEPING 2nd YEAR) (10 to 15 CM) | 8 | Number | |
| 1577 | 44.139 | ROAD P (UPKEEPING 3rd YEAR) (5 to 10 CM) | 33 | Number | |
| 1578 | 44.14 | ROAD P(UPKEEPING 3TH YEAR) (10 to 15 CM) | 8 | Number | |
| 1579 | 44.141 | ROAD P(UPKEEPING 4th YEAR) (5 to 10 CM) | 33 | Number | |
| 1580 | 44.142 | ROAD P(UPKEEPING 4th YEAR) (10 to 15 CM) | 8 | Number | |
| 1581 | 44.143 | ROAD P (UPKEEPING 5th YEAR) (5 to 10 CM) | 33 | Number | |
| 1582 | 44.144 | ROAD P (UPKEEPING 5th YEAR) (10 to 15 CM) | 8 | Number | |
| 1583 | 44.145 | ROAD Q(UPKEEPING 1st YEAR) (5 to 10 CM) | 25 | Number | |
| 1584 | 44.146 | ROAD Q(UPKEEPING 2rd YEAR) (5 to 10 CM) | 33 | Number | |
| 1585 | 44.147 | ROAD Q (UPKEEPING 2nd YEAR) (10 to 15 CM) | 8 | Number | |
| 1586 | 44.148 | ROAD Q (UPKEEPING 3rd YEAR) (5 to 10 CM) | 33 | Number | |
| 1587 | 44.149 | ROAD Q(UPKEEPING 3TH YEAR) (10 to 15 CM) | 8 | Number | |
| 1588 | 44.15 | ROAD Q(UPKEEPING 4th YEAR) (5 to 10 CM) | 33 | Number | |
| 1589 | 44.151 | ROAD Q(UPKEEPING 4th YEAR) (10 to 15 CM) | 8 | Number | |
| 1590 | 44.152 | ROAD Q (UPKEEPING 5th YEAR) (5 to 10 CM) | 33 | Number | |
| 1591 | 44.153 | ROAD Q (UPKEEPING 5th YEAR) (10 to 15 CM) | 8 | Number | |
| 1592 | 44.154 | ROAD R(UPKEEPING 1st YEAR) (5 to 10 CM) | 50 | Number | |
| 1593 | 44.155 | ROAD R(UPKEEPING 2rd YEAR) (5 to 10 CM) | 58 | Number | |
| 1594 | 44.156 | ROAD R (UPKEEPING 2nd YEAR) (10 to 15 CM) | 8 | Number | |
| 1595 | 44.157 | ROAD R (UPKEEPING 3rd YEAR) (5 to 10 CM) | 58 | Number | |
| 1596 | 44.158 | ROAD R(UPKEEPING 3TH YEAR) (10 to 15 CM) | 8 | Number | |
| 1597 | 44.159 | ROAD R(UPKEEPING 4th YEAR) (5 to 10 CM) | 58 | Number | |
| 1598 | 44.16 | ROAD R(UPKEEPING 4th YEAR) (10 to 15 CM) | 8 | Number | |
| 1599 | 44.161 | ROAD R (UPKEEPING 5th YEAR) (5 to 10 CM) | 58 | Number | |
| 1600 | 44.162 | ROAD R (UPKEEPING 5th YEAR) (10 to 15 CM) | 8 | Number | |
| 1601 | 44.163 | ROAD S(UPKEEPING 1st YEAR) (5 to 10 CM) | 100 | Number | |
| 1602 | 44.164 | ROAD S(UPKEEPING 2rd YEAR) (5 to 10 CM) | 112 | Number | |
| 1603 | 44.165 | ROAD S (UPKEEPING 2nd YEAR) (10 to 15 CM) | 12 | Number | |
| 1604 | 44.166 | ROAD S (UPKEEPING 3rd YEAR) (5 to 10 CM) | 112 | Number | |
| 1605 | 44.167 | ROAD S(UPKEEPING 3TH YEAR) (10 to 15 CM) | 12 | Number | |
| 1606 | 44.168 | ROAD S(UPKEEPING 4th YEAR) (5 to 10 CM) | 112 | Number | |
| 1607 | 44.169 | ROAD S(UPKEEPING 4th YEAR) (10 to 15 CM) | 12 | Number | |
| 1608 | 44.17 | ROAD S (UPKEEPING 5th YEAR) (5 to 10 CM) | 112 | Number | |
| 1609 | 44.171 | ROAD S(UPKEEPING 5th YEAR) (10 to 15 CM) | 12 | Number | |
| 1610 | 44.172 | Calculation of SubTotal, GST and Total Amount carried out by system automatically | |||
| 1611 | 44.173 | Basic cost of value put to tender as per estimate | 1 | (A) | |
| 1612 | 44.174 | Add GST at 12% | 1 | (B) | |
| 1613 | 44.175 | Total Value put to Tender | 1 | (A+B) | |
| 1614 | 44.176 | Excess/Less Percentage | 1 | (D) | |
| 1615 | 44.177 | Final Value | 1 | (E) | |
| 1616 | 44.178 | Add GST at 12% of Final Value | 1 | (F) | |
| 1617 | 44.179 | Total Value of Contract Including 12% of GST | 1 | (E+F) |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail