| 1 | 1 | Labour portion | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). | BI01010001010000000000000515BI0100001113 | 507 | No |
|---|
| 3 | 1.02 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. | BI01010001010000000000000515BI0100001114 | 1428.57 | Trip |
|---|
| 4 | 1.03 | Loading HT PSC pole to Hand cart from the stacking place and unloading the same at work site. | BI01010001010000000000000515BI0100001115 | 304 | No |
|---|
| 5 | 1.04 | Transporting one HT PSC pole by Hand cart (limited to 4km). | BI01010001010000000000000515BI0100001116 | 304 | P/km |
|---|
| 6 | 1.05 | Loading HT 'A' type pole from the stacking place and unloading the same at work site (transport by vehicle). | BI01010001010000000000000515BI0100001117 | 603 | No |
|---|
| 7 | 1.06 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. | BI01010001010000000000000515BI0100001118 | 914 | No |
|---|
| 8 | 1.07 | Fitting and providing one Strut using 'A' type pole incl. digging & back filling pit. | BI01010001010000000000000515BI0100001119 | 2612 | No |
|---|
| 9 | 1.08 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. | BI01010001010000000000000515BI0100001120 | 23128 | km |
|---|
| 10 | 1.09 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. | BI01010001010000000000000515BI0100001121 | 1508 | No |
|---|
| 11 | 1.1 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. | BI01010001010000000000000515BI0100001122 | 723 | No |
|---|
| 12 | 1.11 | Fitting one set AB switch and giving connection | BI01010001010000000000000515BI0100001123 | 1859 | No |
|---|
| 13 | 1.12 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. | BI01010001010000000000000515BI0100001124 | 320 | No |
|---|
| 14 | 1.13 | Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11kV DP incl. conveyance of materials. | BI01010001010000000000000515BI0100001125 | 361 | No |
|---|
| 15 | 1.14 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. | BI01010001010000000000000515BI0100001126 | 585 | No |
|---|
| 16 | 1.15 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. | BI01010001010000000000000515BI0100001127 | 1183 | No |
|---|
| 17 | 1.16 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. | BI01010001010000000000000515BI0100001128 | 64 | No |
|---|
| 18 | 1.17 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. | BI01010001010000000000000515BI0100001129 | 99 | No |
|---|
| 19 | 1.18 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. | BI01010001010000000000000515BI0100001130 | 327 | No |
|---|
| 20 | 1.19 | Dismantling one 2x40W fluorescent tube fitting from the existing pole and refitting the same on newly erected pole and reconnecting. | BI01010001010000000000000515BI0100001131 | 501 | No |
|---|
| 21 | 1.2 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). | BI01010001010000000000000515BI0100001132 | 3802 | No |
|---|
| 22 | 1.21 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | BI01010001010000000000000515BI0100001133 | 1280 | No |
|---|
| 23 | 1.22 | Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling | BI01010001010000000000000515BI0100001134 | 312 | No |
|---|
| 24 | 1.23 | Additional rate for providing one disc set on any type of HT pole for making cut point. | BI01010001010000000000000515BI0100001135 | 105 | No |
|---|
| 25 | 1.24 | Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). | BI01010001010000000000000515BI0100001136 | 1157 | km/ km |
|---|
| 26 | 1.25 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. | BI01010001010000000000000515BI0100001137 | 2178 | No |
|---|
| 27 | 1.26 | Fitting and erecting one HT 'A' type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. | BI01010001010000000000000515BI0100001138 | 2756 | No |
|---|
| 28 | 1.27 | Dismantling one section fuse | BI01010001010000000000000515BI0100001139 | 128 | No |
|---|
| 29 | 1.28 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. | BI01010001010000000000000515BI0100001140 | 160 | No |
|---|
| 30 | 1.29 | Drilling hole of various sizes on existing Channel/Cross Arm. | BI01010001010000000000000515BI0100001141 | 11 | No |
|---|
| 31 | 1.3 | Drilling oval shaped hole of various sizes on existing Channel/Cross Arm/GI/MS cleat etc. | BI01010001010000000000000515BI0100001142 | 28 | No |
|---|
| 32 | 1.31 | Fitting one additional HT pin with insulator | BI01010001010000000000000515BI0100001143 | 99 | No |
|---|
| 33 | 1.32 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. | BI01010001010000000000000515BI0100001144 | 320 | No |
|---|
| 34 | 1.33 | Loading HT 'A' type pole to Hand cart from the stacking place and unloading the same at work site. | BI01010001010000000000000515BI0100001145 | 336 | No |
|---|
| 35 | 1.34 | Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting of trunks/branches, removing the root completely and stacking. | BI01010001010000000000000515BI0100001146 | 322 | No |
|---|
| 36 | 1.35 | Cutting trees beyond 60cm but upto and incl. 120cm girth, cutting of trunks/branches, removing the root completely and stacking. | BI01010001010000000000000515BI0100001147 | 543 | No |
|---|
| 37 | 1.36 | Cutting trees beyond 120cm but upto and incl. 180cm girth, cutting of trunks/branches, removing the root completely and stacking. | BI01010001010000000000000515BI0100001148 | 831 | No |
|---|
| 38 | 1.37 | Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting branches, removing root completely and stacking (where space for falling trees is not enough). | BI01010001010000000000000515BI0100001149 | 482 | No |
|---|
| 39 | 1.38 | Cutting trees beyond 60cm but upto and incl. 120cm girth, cutting branches, removing root completely and stacking (where space for falling trees is not enough). | BI01010001010000000000000515BI0100001150 | 863 | No |
|---|
| 40 | 1.39 | Cutting trees beyond 120cm but upto and incl. 180cm girth, cutting branches, removing root completely and stacking (where space for falling trees is not enough). | BI01010001010000000000000515BI0100001151 | 1215 | No |
|---|
| 41 | 1.4 | Fitting and erecting one HT DP using 'A' type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. | BI01010001010000000000000515BI0100001152 | 6967 | No |
|---|
| 42 | 1.41 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. | BI01010001010000000000000515BI0100001153 | 2033 | No |
|---|
| 43 | 1.42 | Dismantling one damaged LT PSC/RCC Strut pole incl. removal of clamps and stacking. | BI01010001010000000000000515BI0100001154 | 628 | No |
|---|
| 44 | 1.43 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls. | BI01010001010000000000000515BI0100001155 | 9401 | km |
|---|
| 45 | 1.44 | Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls. | BI01010001010000000000000515BI0100001156 | 2230 | km |
|---|
| 46 | 1.45 | Stringing one km LT 3ph 4 wire line (Rabbit for Ph, Weasel for N) incl. fitting cross arm etc. removing touchings and conveyance of materials. | BI01010001010000000000000515BI0100001157 | 21250 | km |
|---|
| 47 | 1.46 | Stringing one km LT Addl conductor (Rabbit) after fitting crossarm, but without realigning existing conductor, incl. fitting cross arm, insulator etc. removing touchings and conveyance of materials. | BI01010001010000000000000515BI0100001158 | 5100 | km |
|---|
| 48 | 1.47 | Providing Bucket type cradling for one span 11kV line. | BI01010001010000000000000515BI0100001159 | 8269 | No |
|---|
| 49 | 1.48 | Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint. | BI01010001010000000000000515BI0100001160 | 50 | No |
|---|
| 50 | 1.49 | Traffic signal painting of pole 1.5m height using black and white paints in alternate rings of 25cm width incl. cost of paint as specified. | BI01010001010000000000000515BI0100001161 | 241 | No |
|---|