Electrification Of Battery Room In Dm Plant Roof Top Solar Power Plant For Spp Of Alumina Refinery , Nalco , Damanjodi , Supply & Installtion Of Led Luminaire Equv . To 2X4ft T8 Tubelight , Supply & Laying Of 25Mm X 6Mm Gi Earth Strip & 8 Swg Gi Wire As Per The Requirement Along Trenches Including Excavation , Cutting And Fixing To Wall , Embedding Inside Wall And Floors , Welding At Joint , Providing Anti-Corrosive Paints Of Bitumen And Jute Covering For Welding Clamping , Necessary Hardware To Carry Out Above Jobs Etc . , Including All Labour And Material Complete As Required And As Per The Direction Of The Eic . , 25X6mm Gi Earth Strip , 8 Swg Gi Wire , Concealed Wiring Of Light/Fan Point With 2 . 5 Sq . Mm . Multistrand Copper Wire With Difference Colour For Line , Neutral And Earthing . Supply , Laying And Wiring With 2 . 5 Sq . Mm Multistrand Copper Wire Of Approved Quality In 25Mm Block Pvc Pipe And 2 Height Jb With 01 Run 1 . 0 Sq . Mm Copper Wire ( Green Colour ) As Continous Earth . Wiring Shall Be Done From Power Distribution Board To Switch Boards Specified At 8 Below And From Switch Boards To Exhaust Fan ( S ) , Led Tube Lights , Wall Fan ( S ) & Sockets . Each Light And Fan Point Shall Be Controlled By One Switch . All Materials Shall Be Supplied By The Party And Work Shall Be Carried Out As Per The Direction Of The Eic . , Short Point ( Up To 3M ) , Long Point ( Up To 10M ) , Extra Long Point ( Above 10M ) , Earthing: Supply , Installation , Testing & Commissioning Of Class-B Gi Earth Electrode Of 50Mm Dia , 3M Long Medium Duty Complete With Rcc Cover And With All Necessary Material Including Excavation Of Earthing Pit , Filling With Layer Of Charcoal And Salt , Back Filling And Providing Necessary Brick Work Slab Cover , Connection With Gi Strips With Complete Material As Required And As Per Direction Of The Eic . All Earth Pits Shall Be Inter-Connected To Form An Earth Grid As Per Ie Rules . Funnels Are To Be Provided With Wire Mesh Of Suitable Size . , Supply , Installation , Testing & Commissioning Of 1 Phase 300Mm 220/240 V Heavy Duty Exhaust Fan Of Cg/Bajaj/Khaitan Make Including Making Hole On Walls Providing Necessary Bracket/Supports For Fixing The Fan , Making Necessary Connection , Providing Gravity Drop Louvers Etc . Finishing The Hole With Necessary Civil Works As Per Direction Of The Eic . , Wiring To 15A Plug Points With 6 Sq . Mm . Multistrand Pvc Insulated Single Core Copper Conductor Wire Including Supply Of 15A Switch And Socket ( 5 Pin ) In 25Mm Block Pvc Conduit Pipe With One Run Of 2 . 5 Sq . Mm Copper Wire ( Green Colour ) As Continuous Earth With Required Size Of 16 Swg Ms Box 3Mm Thick White Hylam Cover And Including 4 Nos Steel Screws And Cup Washer Complete With Fitting As Per Direction Of The Eic . All Materials Shall Be Supplied By The Party And Work Shall Be Carried Out As Per The Direction Of The Eic . , Supply , Installation , Testing & Commissioning Of Sdb Incomer 63A Tpn Mcb 10Ka-01No , Outgoing Sp Load Contact Mcb 16A-12Nos , Busbar-1Set . Pre- Wired , Ready To Use Complete Lighting Distribution Board . , Supply , Installation , Testing & Commissioning Of 8 X 6 Ms/Gi Of Switch Boards With Bakelite Cover On Existing Wall/Any Other Surface Approved By Engineer-In-Charge With Supply Of All Materials For Fixing Switch/Socket/Regulator And Making Necessary Connections Of Switch Boards , Installation And Testing Of 5A Switch On Switch Board ( Material Shall Be Supplied By Party . ) , Laying Of Cable 3 . 5 C 35/50 Sq . Mm: Issue From Central Stores , Shifting To Site And Laying Of Following Size Cable Along The Existing Cable Trays / Through Wall And Clamping Of The Cables To The Cable Trays As Required At Every 1 Meter With Aluminium Clamps ( Supply Of Clamps In Partys Scope ) As Per The Directions Of The Engineer- In -Charge . , Supply Of Dc Glands And Termination Of Above Cable Of Size 35/50 Sq Mm .