| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 27-05-2020 | dt | Date | 12-06-2020 |
| Name of Work : REPAIRS AND ROUTINE MAINTENANCE OF VRF PLANTS, REPAIRS /REPLACEMENT OF CHILLED WATER PIPE LINES AND MISC CONNECTED VALVES OF CENTRAL AC PLANTS, MANNING AND OPERATION AND REPAIRS/MAINTENANCE OF CENTRAL AIR CONDITION PLANT AND REPAIRS/ MAINTENANCE OF REPLACEMENT OF FIRE FIGHTING WATER DISTRIBUTION SYSTEM. HYDRANT, HOSE BOX, FIRE DETECTION AND FIRE ALARM SYSTEM AND CONNECTED ACCESSORIES AT INHS ASVINI UNDER AGE (I) ASVINI, COLABA MUMBAI | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Part I\nRepairs/ Routine maintenance of VRF plants of Mitsubishi make of following capacity round the clock including maintaining the plants twenty four hours for desired temperature of 21+/-3 degree celcius without interuption including repairs/ replacement of damaged/ unserviceable minor parts, controlling valves, copper tubings, nitrile rubber insulation, and all electrical/ electronics components, control wirings, sensors,Thermistors, thermocol inner packs,indoor/ outdoor fan motor windings, vibration pads, painting of rusted out door stands and connected accessories, drainage lines, pre filters control/ communication wirings,earthings, leak test and all other accessories not mentioned in this schedule complete all as specified and directed. | |||
| 2 | 1.1 | (a) Out door unit of capacity 48 hp -6 Nos. | 11 | Per month | |
| 3 | 1.2 | (b) Out door unit of capacity 36 hp - 6 Nos. | 11 | Per month | |
| 4 | 1.3 | (c) Out door unit of capacity 24 hp - 6 Nos. | 11 | Per month | |
| 5 | 1.4 | (d) Four way Way casette type indoor Unit of any capacity (Model Capacity PLFYP80VBM-E to PLFYP125VBM-E) -200 units. | 11 | Per month | |
| 6 | 1.5 | (e) Split hi wall type indoor unit of any capacity -15 Nos . | 11 | Per month | |
| 7 | 1.6 | Note:- (a) For item No 1 above AC Mechanic have to attend local Maint complaint register, Minor faults, routine cleaning, Dry servicing of plant and filters. Any number of manpower required for carrying out the routine maintenance(Minimum 02 Nos of High skilled Refrigerator Mechanic required at site for servicing and repairs) is deemed to be included in the quoted rates. \nb) The contractor shall ensure visit of OEM manufacturer Engineer monthly once and report/ serviceability of Out door units and same shall be submitted to this Office. The charges for all OEM procedures are deemed to be included in the quoted rates. The reports of OEM Engineer shall be produced before submitting RARs.\n(c) AC mechanic must be experienced in VRF Plants and capable for carrying out any type of maintenance or attending breakdown in above mentioned plants.\n(d) Incase of any breakdown the additional man power if required will be arranged by the contractor without any price adjustment. \n(e) The cost of replacement of all Minor parts which are not mentioned in schedule shall be deemed to be included in quoted rates Item No 1. | |||
| 8 | 2 | Dismantling of Out door unit covers of any capacity completly by disconnecting/ covering all electric/electronic boards and wiring and servicing condensor coils and compressor, reservoir areas completly wet servicing by using approved chemicals by OEM manufacturer and re assembling setting all parameters by using softwares by an OEM engineer testing all included complete all as specified and directed. | 36 | Each Unit | |
| 9 | 3 | Dismantling of four way/ high wall indoor unit covers of any capacity completly by disconnecting/ covering all electronic boards and wiring and servicing cooling coils, expansion valves, indoor drainage pumps, drainage lines completly wet servicing by using approved chemicals by OEM manufacturer by using tray jackets including cleaning the surface after servicing testing complete all as specified and directed. | 420 | Each Unit | |
| 10 | 4 | Supply and charging of Refrigerant fresh gas R 410 complete all as specified and directed. . | 120 | Per Kg | |
| 11 | 5 | Supply and fix the Compressor Cat Part No- R69025478 for Out door units of VRF 18 to 16 HP Unit(Model No- PUHY-400 to 450 YHM) including testing complete all as specified and directed. | 2 | Each | |
| 12 | 6 | Supply and fix the Control Board ,Cat Part No- R61011281 for Out door units of VRF 18 to 16 HP Unit(Model No- PUHY-400 to 450 YHM) including testing complete all as specified and directed. | 3 | Each | |
| 13 | 7 | Supply and fix the MNET Board, Cat Part No- R 61012281 for Out door units of VRF 18 to 16 HP Unit(Model No- PUHY-400 to 450 YHM) including testing complete all as specified and directed. | 2 | Each | |
| 14 | 8 | Supply and fix the Noise filter Cat Part No- R61015293 for Out door units of VRF 18 to 16 HP Unit(Model No- PUHY-400 to 450 YHM) including testing complete all as specified and directed. | 2 | Each | |
| 15 | 9 | Supply and fix the Fan board Cat Part No- R 61037280 for Out door units of VRF 18 to 16 HP Unit(Model No- PUHY-400 to 450 YHM) including testing complete all as specified and directed. | 2 | Each | |
| 16 | 10 | Supply and fix the Invertor board, Cat Part No-R61039280 for Out door units of VRF 18 to 16 HP Unit(Model No- PUHY-400 to 450 YHM) including testing complete all as specified and directed. | 2 | Each | |
| 17 | 11 | Supply and fix the Motor YC9201A, Cat Part No- R61122220 for Out door units of VRF 18 to 16 HP Unit(Model No- PUHY-400 to 450 YHM) including testing complete all as specified and directed. | 1 | Each | |
| 18 | 12 | Supply and fix Compressor Cat Part No- R69025478 for Out door units of VRF 14 to 10 HP Unit(Model No- PUHY-250 -350 YHM) including testing complete all as specified and directed. | 1 | Each | |
| 19 | 13 | Supply and fix Control Board ,Cat Part No- R61011281 for Out door units of VRF 14 to 10 HP Unit(Model No- PUHY-250 -350 YHM) including testing complete all as specified and directed. | 2 | Each | |
| 20 | 14 | Supply and fix MNET Board, Cat Part No- R 61012281 for Out door units of VRF 14 to 10 HP Unit(Model No- PUHY-250 -350 YHM) including testing complete all as specified and directed. | 2 | Each | |
| 21 | 15 | Supply and fix Noise filter Cat Part No- R61015293 for Out door units of VRF 14 to 10 HP Unit(Model No- PUHY-250 -350 YHM) including testing complete all as specified and directed. | 2 | Each | |
| 22 | 16 | Supply and fix Fan board Cat Part No- R 61037280 for Out door units of VRF 14 to 10 HP Unit(Model No- PUHY-250 -350 YHM) including testing complete all as specified and directed. | 2 | Each | |
| 23 | 17 | Supply and fix Invertor board, Cat Part No-R61039280 for Out door units of VRF 14 to 10 HP Unit(Model No- PUHY-250 -350 YHM) including testing complete all as specified and directed. | 2 | Each | |
| 24 | 18 | Supply and fix Motor YC9201A, Cat Part No- R61122220 for Out door units of VRF 14 to 10 HP Unit(Model No- PUHY-250 -350 YHM) including testing complete all as specified and directed. | 2 | Each | |
| 25 | 19 | Supply and fix Condensor coil, for Out door units of VRF Unit(Model No- PUHY-250 -450 YHM) including leak testing by using nitrogen all as per OEM instructions complete all as specified and directed. | 2 | Each Job | |
| 26 | 20 | Supply and fix PCB for four way casette/hiwall type indoor units of VRF Unit(Model Capacity PLFYP80VBM-E to PLFYP125VBM-E) including testing complete all as specified and directed. | 1 | Each | |
| 27 | 21 | Supply and fix Drain Pump for four way casette/hiwall type indoor units of VRF Unit(Model Capacity PLFYP80VBM-E to PLFYP125VBM-E) including testing complete all as specified and directed. | 2 | Each | |
| 28 | 22 | Supply and fix Blower motor for four way casette/hiwall type indoor units of VRF Unit(Model Capacity PLFYP80VBM-E to PLFYP125VBM-E) including testing complete all as specified and directed. | 2 | Each | |
| 29 | 23 | Supply and fix Linear expansion Valve for four way casette/hiwall type indoor units of VRF Unit(Model Capacity PLFYP80VBM-E to PLFYP125VBM-E) including testing complete all as specified and directed. | 1 | Each | |
| 30 | 24 | Supply and fix Remote Controller for four way casette/hiwall type indoor units of VRF Unit(Model Capacity PLFYP80VBM-E to PLFYP125VBM-E) including testing complete all as specified and directed. | 3 | Each | |
| 31 | 25 | Supply and fix Cooling Coil for four way casette/hiwall type indoor units of VRF Unit(Model Capacity PLFYP80VBM-E to PLFYP125VBM-E) including testing complete all as specified and directed. | 2 | Each | |
| 32 | 26 | PART- II - A\nManning and operation of Central Air Conditioning Plant of given below capacity by employing following types of Operators in shift duty complete all as specified and directed :- | |||
| 33 | 26.1 | 1st Shift (06:00 to 14:00) - Qualified 01 Nos High skilled operator & 01 unskilled for handling 1480Ton Central AC Plant- 02 Nos (For AC Plant & 55 Nos AHU, FCU, RU units Units).\n | 11 | Per Month | |
| 34 | 26.2 | 2nd Shift (14:00 to 22:00) - Qualified 01 Nos High skilled operator & 01 unskilled for handling 1480Ton Central AC Plant- 02 Nos (For AC Plant & 55 Nos AHU, FCU, RU units Units). | 11 | Per Month | |
| 35 | 26.3 | 3rd Shift (22:00 to 06:00) - Qualified 01 Nos High skilled operator & 01 unskilled for handling 1480Ton Central AC Plant- 02 Nos (For AC Plant & 55 Nos AHU, FCU, RU units Units).\n | 11 | Per Month | |
| 36 | 27 | The total Plant consists following equipments and duties a) Central Air Conditioning plant of capacity (2X400TR & 2X 340TR ) 2x340 TR (Make Carrier Aircon) including each having one No of Centrifugal compressor 340 TR at a speed of 3000RPM suitable for R22 refrigerant one No of squirrel cage induction motor, 3 phase,415V,50hz &2X400 TR double screw compressor, make Diakin (each compressor of capacity 200TR X 2 Nos) Model Name- PFS4302DBRY, suitable for R 134a AC Supply with one No of microprocessor based soft start central pannel with safty operation with shell and tube type water cooled condenser and shell and tube water cooled chiller, anti vibratiion damper , refrigerant pipe flowing, switch butterfly valve, balancing valve, NRV, Strainer, gauges etc, for 24 hrs. daily for efficient and contious running /operation of central air conditioning plant and its electrical panel board with other installation/ equiptmentas mentioned below to Maintaining Log sheet, lodging of complaint ,attending complaint Mointering of PLC including taking care of Chillers plant ,cooling towers,condenser pumps/motors, chiller pumps/motors pilferage, theft or damages installed at INHS Asvini, Comprising with following :-\n(i) Chiller Plant capacity of 340 TR - 1 Nos .\n(ii) Chiller Plant capacity of 400 TR - 3 Nos .\n(iii) Condenser Pump Set of 40 hp motor capacity- 4 Nos.\nCondenser water pump with 3 phase induction motor, butterfly valve NRV and strainer etc with head of 25mtr, discharge 306cum/hr make GEC, motor rating 30KW, 1465RPM, 47 Amps, 415V Make Kirloskar.\n(iv) Chiller Pump Set of 100 hp motor capacity -4 Nos\nChilled water pump set with 3phase, 415V,Induciotn motor Make Kirloskar including butterfly valve, NRV and strainer etc, with pump head of 60mtr, discharge 3445 LPM, rating 55KW,1465RPM.\n(v) Cooling Tower (FRP) with 15/20 HP blower motor - 4 Nos.\nCooling tower with motor fan, sump, butterfly valve NRV,strainer makeup tank of capacity 10000 litres pvc syntex tank, motor capacity of 15/20HP Make 01 Nos of Paharpur & 03 Nos of Advance cooling tower ltd. | |||
| 37 | 27.1 | b) Air Handling Unit of Central AC Plant of min capacity of 1.5 TR TO 66TR (Make Carrier Aircon/ Blue Star) Double skin air handling unit draw/ blow type complete with fan /centrifugal blower, coil section with multirow deep cooling coil, heating coils, humidifer sectiion, filter section with synthtic fibre including TEFC induction motor, belt drive package, balancing valve gate valve 3way diverting valve, Y strainer airvent, temperature and pressure gauge etc for efficient and continous running/operation of AHU and its electrical panel board, Desk top with other installation/equiptment below, lodging of complaint, Monitoring of AHU Panel Board, Pilferage theft or damages installed at INHS Asvini Comprising with following:-\n(i) RU Unit - 9 Nos.\n(ii) FCU Unit - 9 Nos.\n(iii) Air Handling Unit- 37 Nos.\n(iv) Hot Water Generator 260 KW -2 Nos.\n(v) Water softing plants 01.\n(vi) Air Curtains 50 Nos. | |||
| 38 | 28 | Part II - B\nRepairs/ Routine maintenance of Central Air Conditioner Plant (Make Carrier Aircon) to entire hospital,maintained twenty four hours for desire temperature of 25 degree +/-2 degree celsius and humidity of 55 +/- 5 % without interruption including repairing/replacement of damage/unserviceable of valve, chiller pipe, conderser pipe, cooling towers,insulation of chilled and hot water pipe line,greasing of motor &pumps complete all as specified and directed | |||
| 39 | 28.1 | Chiller Plant capacity of 340/400 TR - 4 Nos. | 11 | Per month | |
| 40 | 28.2 | Condenser Pump Set of 40 HP motor capacity - 4 Nos. | 11 | Per month | |
| 41 | 28.3 | Chiller Pump Set of 100 HP motor capacity - 4 Nos. | 11 | Per month | |
| 42 | 28.4 | Cooling Tower (FRP) with 15/20 HP blower motor - 4 Nos. | 11 | Per month | |
| 43 | 29 | Repairs/ Routine maintenance of Daikin make chiller No -1 Model No- PFS4302DARY, Ser No:0000110 of capacity of 400Ton screw type double compressorincluding replacement of damaged parts like- electronic/ electric parts, equipment motor & connected parts, compressor repair & connected parts and all including day today maintenece and all parts of chiller unit excluding Compressor oil and filters. | 11 | Per month | |
| 44 | 30 | Repairs/ Routine maintenance of Daikin make chiller No-3 Model No- PFS4302DBRY, Ser No : 0000131 of capacity of 400Ton screw type double compressorincluding replacement of damaged parts like- electronic/ electric parts, equipment motor & connected parts, compressor repair & connected parts and all including day today maintenece and all parts of chiller unit excluding Compressor oil and filters complete all as specified and directed. | 11 | Per month | |
| 45 | 31 | Repairs/ Routine maintenance of Air Handling Units (Make : Carrier Aircon/ Blue Star),ducts, chilled water pipe line, hot water pipe line to entire hospital, for desire temperature of 25+/- 2 degree centigrade and humidity of 55 +/- 5% without interruptiion including repairing of damaged/ un functional valves, minor chillerhot water pipe insulation, duct insulation ( For chilled/ hot water pipe up to 01 meter & for duct insulation 1 sqm considered as minor) , chilled and hot water pipe line, ducts (inlet and out let), Cleaning of Cooling coils/ Heating Coils/ filters with chemical, Fire dampers, Humidity controls system complete all as specified and directed:-\n(a) AHUs -37 Nos.\n(b) RU Unit - 9 Nos. \n(c) FCU Unit - 9 Nos.\n(d) Air Curtains -50 Nos.\n(e)Condenser water pipe line - 204 RM.\n(f)Ducting (Gi/Al) - 11459 Sq mtr.\n(g) Chilled water pine line Insulation -2847 RM. \n(h) Hot water pipe line Insulation -2040 RM. | 11 | Per month | |
| 46 | 31.1 | NOTE:-\n(a) For item No 1,2&3 AC Mechanic have to attend local Maint complaint register, Minor faults, routine cleaning, servicing plant and filters. Any number of manpower required for carrying out the routine maintenance(Minimum 05 Nos of man power required at site for servicing and repairs) is deemed to be included in the quoted rates. \nb) The contractor shall ensure a Mechanical engineer (Degree or 03 yrs diploma holder) of minimum three years experience in HVAC visits the plant atleast twice in a week to check and ensure the serviciability of plant, report the same to AGE (I) Asvini or his authorised representative.\n(c) AC mechanic must be capable of carrying out any type of maintenance or attending breakdown in above mentioned plants.\n(d) Incase of any breakdown the additional man power if required will be arranged by the contractor without any price adjustment.\n(e) The cost of replacement of Minor parts as mentioned in appendix A enclosed here with shall be deemed to be included in quoted rates of Sch A part II Item No. 2 to 5. | |||
| 47 | 31.2 | (i)Relay over load of all type and Amperage.\n(ii)All motor bearing as per existing size and make.\n(iii)Pump bearing as per existing size and make.\n(iv)Couplings of motors.\n(v)Gland packing graphical coating as per the ground required and size.\n(vi)Coupling bush with pin.\n(vii)V Belt as per required size and make.\n(viii)Blower bearing of any size for motor and pumps.\n(ix)Misc as nuts, bolts,washer etc.\n(x)Servogen grease as per required at site.\n(xi)Relay any type and rating.\n(xii)MCCB, MCB for any type and capacity for motor/pumps.\n(xiii)Pressure guage. \n(xiv)Temperature guage.\n(xv)Single phase preventers.\n(xvi)All types of contactors excluding chiller contactors.\n(xvii)Cable glands and lugs.\n(xviii)All motor windings below 5 HP.\n(xix)All other minor items excluding contained in sch A Part-III.\n(xx)Minor pipe insulation & duct insulationwork- up to 1 mtr. | |||
| 48 | 32 | Part III\nSupply and fix in repair Sencer ( Chilled water/Condensor water/ oil temp / bearing temp) complete all as specified and directed Make Carrier cat part No:- 2015158 for chiller of 340 TR (19XL Carrier aircon). | 1 | Each | |
| 49 | 33 | Supply and fix in repair Sencer ( Chilled water/Condensor water/ oil temp / bearing temp) complete all as specified and directed Make Daikin Model Name- PFS4302DBRY for chiller of 400 TR. | 1 | Each | |
| 50 | 34 | Supply and fix in repair Low volt terminal motor leads complete all as specified and directed make carrier, carrier cat part No 2015162 for chiller of 340 TR (19XL Carrier aircon). | 1 | Each | |
| 51 | 35 | Supply and fix in repair Transistor complete all as specified and directed. Make Carrier for chiller of 340 TR (19XL Carrier aircon) . | 1 | Each | |
| 52 | 36 | Supply and fixing of contactor 3 pole with auxillary contact Kit suitable for 235 HP 19XL Compressor motor , 415V,50/60hz complete all as specified and directed. | 1 | Each | |
| 53 | 37 | Supply and Charging of Gas R 22 complete all as specified and directed | 61 | Kgs | |
| 54 | 38 | Supply and Charging of Gas R 134a complete all as specified and directed | 372 | Kgs | |
| 55 | 39 | M&L for rewinding of electric motor of 943.2 Horse power (200TR) screw compressor motor make - Diakin , 3phase 50hz, 415V with super enamelled copper winding wire of suitable guage including dismantling, assembling after rewinding to its original location complete all as specified and directed | 1 | Each | |
| 56 | 40 | M&L for rewinding of electric motor of the following capacity, 3phase 50hz, 415V with super enamelled copper winding wire of suitable guage including dismantling, assembling after rewinding to its original location of capacity 1603.5 Horse power (340TR) complete all as specified and directed | 1 | Each | |
| 57 | 41 | All as per Srl Item No. 56 here in before but 100 HP | 1 | Each | |
| 58 | 42 | All as per Srl Item No. 56 here in before but 40 HP | 1 | Each | |
| 59 | 43 | All as per Srl Item No. 56 here in before but 25 HP | 1 | Each | |
| 60 | 44 | All as per Srl Item No. 56 here in before but 20 HP | 1 | Each | |
| 61 | 45 | All as per Srl Item No. 56 here in before but 5 HP | 1 | Each | |
| 62 | 46 | All as per Srl Item No. 56 here in before but 10 HP | 3 | Each | |
| 63 | 47 | All as per Srl Item No. 56 here in before but 7.5 HP | 3 | Each | |
| 64 | 48 | All as per Srl Item No. 56 here in before but 5 HP | 5 | Each | |
| 65 | 49 | Taking out old unservicable Paharpur cooling tower fill sheet from the site and Supply and fixing of new Paharpur fills sheet of size for cooling tower as per the existing at the site andcomplete all as specified and directed | 50 | Each | |
| 66 | 50 | Taking out old unservicable Advance munter a set of fills sheet from Advance cooling tower model No- AL-091 at the site and Supply and fixing of new fills sheet of same size, quality for cooling tower as per the existing at the site complete all as specified and directed | 30 | Each | |
| 67 | 51 | Taking out old unservicable cooling tower nozzles and Supply and fixing of new paharpur cooling tower nozzles as per the existing complete all as specified and directed. | 20 | Each | |
| 68 | 52 | Taking out old unservicable Advance cooling tower model No- AL-091, ABS nozzles and Supply and fixing of new cooling tower nozzles as per the existing complete all as specified and directed. | 20 | Each | |
| 69 | 53 | Dismantling/Taking down old unservicable FRP body structure of cooling tower carefully and cleaning the sump with chemical and supply and fixing of new FRP sheets as per size existing at site including all fixing material such as m seal other water resistance adhesive and make the cooling tower structure leak proof complete all as specified and directed | 10 | Sqm | |
| 70 | 54 | Removal of old unserviceable oil of any viscocity and make, supply and filling of gear box oil of any make and viscocity complete all as specified and directed | 10 | Ltrs | |
| 71 | 55 | Dismantling/taking down old unservicable cooling coil of any size and Supply and fixing of new cooling coil 1/2\" dia copper tubes and aluminium fins, the gap between two tubes not less than 20mm including inlet and outlet pipes 18 guage GI outer frame and connecting pipe lines and connected insulation AHU body refitting complete all as specified and directed | 380 | Per Sqft per row | |
| 72 | 56 | Descaling of condenser shell and tube by using chemical and nylon brush ,Taking out complete impurities by circulating chemical solution and replace unsv gasket complete and testing (with nitrogen gas)after completion of work complete all as specified and directed | 3 | Each | |
| 73 | 57 | Descaling of evapourator or chiller shell and tube by using chemical and nylon brush ,Taking out complete impurities by circulating chemical solution and replace unsv gasket complete and testing with nitrogen gas after completion of work complete all as specified and directed | 3 | Each | |
| 74 | 58 | Supply and fixing of dry and wet bulb therometer of make dimple complete all as specified and directed. | 20 | Each | |
| 75 | 59 | Taking down old unserviceable insulation over the chiller pipe line ,cleaning water pipe surface with steel brush remove dirt/ dust M&L for chilled pipe line insulation by applying a coat of zinc chromite primer and apply a two coats of cold setting adhesive compound(CRPX) on pipes for sticking the insulation bonded mineral wool of density 144 Kg/Cum, 50mm thickness tightly pressed on th pipe up to 300mm dia seal all the joint with adhesive compound wrap the insulation surface by using one layer of polythene sheet 50mm wide pvc tape cover the entrire with chiken mesh finish the surface, of density 144 Kg/Cum and with one coat of sand and cement plaster and cover 28 guage GI cladding of approved color complete suitable for above insulated pipe section complete all as specified and directed | 80 | RM | |
| 76 | 60 | Taking down old unsv duct insulation, cleaning the duct surface with steel brush remove dirt/dust and make it free of mill scale , greases and foreign matter.M&L for paint the surface with two coats of bituminous paint taking spl care over non galvanised part , applying rubber based adhesive CRPX compound manufacted by shaimar Tar product on ducts sticking the fiber glass section in the form of pad with the density 24 Kg/Cum shall be fixed tightly to the surface & all joints to be sealed properly by using sealing compound,cover with aluminium foil kraft paper laminate with minimum overlap of 50mm, seal each lap joint with self adhesive aluminium foil tape 50mm wide, complete all as specified and directed | 70 | Sqm | |
| 77 | 61 | Taking down old unsv GM gate/globe/Air relief valve,Supply and fixing of new GM Gate/Globe valve with of 40mm dia complete all as specified and directed. | 1 | Each | |
| 78 | 62 | All as per Srl Item No. 61 here in before but 32mm dia. | 1 | Each | |
| 79 | 63 | All as per Srl Item No. 61 here in before but 25 mm dia. | 1 | Each | |
| 80 | 64 | Taking down old unsv CI butter fly valve of any make and size and supply and fixing of new CI Butter fly valve slim seal design with nitrile rubber lined seat with clutch lever (p10) as per IS 13095 of size 250mm complete all as specified and directed. | 1 | Each | |
| 81 | 65 | All as per Srl Item No. 64 here in before but but 200mm. | 1 | Each | |
| 82 | 66 | All as per Srl Item No. 64 here in before but but 150mm. | 1 | Each | |
| 83 | 67 | All as per Srl Item No. 64 here in before but but 125mm. | 1 | Each | |
| 84 | 68 | All as per Srl Item No. 64 here in before but but 100mm. | 1 | Each | |
| 85 | 69 | Taking down old existing MS pipes Supply , lay and welding MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc. of size 300mm complete all as specified and directed. Make:- Jindal or equivalent. | 10 | RM | |
| 86 | 70 | All as per Srl Item No. 69 here in before but but 250mm dia. | 10 | RM | |
| 87 | 71 | All as per Srl Item No. 69 here in before but but 200mm dia. | 10 | RM | |
| 88 | 72 | All as per Srl Item No. 69 here in before but but 150mm dia. | 10 | RM | |
| 89 | 73 | All as per Srl Item No. 69 here in before but but 100mm dia. | 10 | RM | |
| 90 | 74 | All as per Srl Item No. 69 here in before but but 80mm dia. | 20 | RM | |
| 91 | 75 | All as per Srl Item No. 69 here in before but but 65 mm dia. | 20 | RM | |
| 92 | 76 | M & L Steel structural fabrication works fabricated from structural steel sections including nuts, bolts,washers, welding ,bending cold or hot, drilling holes for bolts, in any shape or size as indicated or directed and inclusive of one primary coat, one under coat and one finishing coat of paint complete all as specified and directed. | 200 | Kg | |
| 93 | 77 | Taking down old unserviceable/deteriorated insulation from any surface ,cleaning the steel surfaces by using wire brush etc. and supply & fix nitrile rubber insulation 19mm thickness sticking on surfaces by using approved adhesive and sealing the joints by weather proof tape complete all as specified and directed | 80 | Sqm | |
| 94 | 78 | Taking out ACB of GE power control make of capacity 600- 1250A, 3 pole, 500 volts, indoor type carrying out routine maintenance, overhauling and caliberation all as per manufacture maintenance manual. Examine the moving isolating contacts for any discouleration cluster contacts, main contacts,, xpring mechanism clean all the contacts with suitable solvent and contacts regressed with suitable grease, contacts getting checked and readjusted if required complete all as specified and directed | 6 | Each job | |
| 95 | 79 | Part IV\nRepairs/ maintenance of fire detection and alarm system complete with Micoprocessor based fire alarm control panel of Dental Block including attendIing the fire alarm system faults, testing, checking including replacement of unserviceable components mentioned in Sch 'A' Part-II. The fire alarm system consisting of Qty-2 Nos complete all as specified and directed:- \n(a) Response indicator \n(b) Audio alarm (Hooter)\n(c) Manual Call Point \n(d) Multisensor Detector | 6 | Per Month | |
| 96 | 80 | Repairs/ maintenance of fire detection and alarm system complete with Micoprocessor based fire alarm control panels (06 Nos) in P-72 (Hospital Building) including attending the fire alarm system faults, testing, checking including replacement of unserviceable components mentioned in Sch 'A' Part-II. The fire alarm system -06 Nos complete all as specified and directed\n(a) Response indicator \n(b) Audio alarm (Hooter)\n(c) Manual Call Point \n(d) Multisensor Detector | 6 | Per Month | |
| 97 | 81 | Repairs / maintenance testing, checking including replacement of unserviceable parts other than mentioned in Sch A Part-II of Twin loop Central Control addressable fire alarm system with back up batteries installed in guard room comprised with LED/LCD display unit for wall mounted fire system consisting of qty. 01 No complete all as specified and directed | 6 | Per Month | |
| 98 | 82 | Repairs / maintenance of fire alarm system complete with electronic control panel consisting of 10 zones in Sailors Inliving Block including attending the fire system faults, testing, checking incl replacement of unserviceable component mentioned in Sch A Part-II. The alarm system consisting of qty 01 No complete all as specified & drected. (a) Manual Call Point \n(b) Audio alarm (Hooter) | 6 | Per Month | |
| 99 | 83 | Repairs/ maintenance of centrifugal pumping set along with electric motor, jockey pump, pressure switch, electrical panel, star delta starters of motors of different capacities including overhauling of pumps including replacing worn out/ damaged parts like impeller, shaft sleeve, casing ring bearing both DE and NDE greasing nipples etc. Greasing of all movable parts of pump set, replacing gland packing and paper gasket replacement/ rewiring of foot valve, strainer if necessary, checking/ repairing for poper functioning of pressure switches of starters, cleaning of contacts of starters, replacing defective parts such as contactors, coils, timers, single phasing preventor complete all as specified and directed (a) Pump set 75HP with star delta starter- 02 Nos\n(b) Pump set 70 HP with star delta starter -02 Nos \n(c) Pump set 20 HP with star delta starter-02 Nos\n(d) Pump set 15 HP with star delta starter-06 Nos | 6 | Per Month | |
| 100 | 84 | Part V\nRepacement of unserviceable batteries of capacity 12 V 7 AH dry type complete all as specified and directed. Make: Exide | 10 | Each | |
| 101 | 85 | Provision of full rehearsal/ drill of fire fighting practice by opening the sluice valves, hydrants and landing valves, fixing of hose reel, checking serviceability of fire brigade inlets and any other works required for the practice including necessay maintenance works / servicing of valves/ pipe lines and manning as required and complete all as specified and directed and provisioning of washers for hydrants.\nNote :- Penalty at the rate of Rs. 5000 per building per month shall be imposed on the contractor if fire fighting practice is not carried out during a month. | 6 | Per Month | |
| 102 | 86 | Taking down existing conventional type fire and smoke detector and Supply, Installation,Testing & Commissioning of Analog Addressable Intelligent multisensor detector, (Heat & Smoke) with duel angle angle decentralize intelligence, soft addressable Photo thermal ( Dual Optical with Forward and backward scattering to eliminate false fire signature & One Thermal Chambers) type, decentralize intelligence with inbuilt fault isolator wiring complete with base as required complete all as specified and directed. Make: Honeywell or equivalent make compatible to existing system. | 150 | Each | |
| 103 | 87 | Taking down existing Manual Call Point and Supply, installation, testing & commissioning of Addressable Manual Call Points with built in fault isolator and same shall be made of ABS plastic, square in shape Surface /Flush Mounting with mounting base & required accessories complete all as specified and directed. Make: Honeywell | 8 | Each | |
| 104 | 88 | Replacement of PVC conduit 25 mm size heavy duty (white colour) including clamps and screws and fixing arragement complete all as specified and directed. Make : Polycab | 200 | RM | |
| 105 | 89 | Supply and laying in replacement two core 1.5 Sq.mm, Multistranded, twisted Copper cable, FRLS Armoured cable laid through existing conduit / fixed to wall / ceiling / loop using proper clamps / clips complete all as specified and directed. Make: Polycab \n | 600 | RM | |
| 106 | 90 | Taking down existing sounder of any specification and Supplu, installation testing & commissioning of Wall/ Ceiling mounted intelligent Addressable Sounder, sounder shall be made of ABS plastic material & have the sound level of 99 dbs with 20 different sounder tones and built in isolator complete with mounting base & required accessories, complete all as specified and directed. Make- Honeywell | 12 | Each | |
| 107 | 91 | Material and labour for rewinding the electric motor of centrifugal pump, disconnecting electric and earth connections, detaching motor and pump, removing foundation bolt nuts and taking out the motor from its existing position of capacity 20 HP, 15KW 3 Phase 415 volts and taking out to workshop for carrying out repairs / rewinding complete all as specified and directed:- \n(a) Dismantling of electric motor, separate starter / rotor and cutting the complete burnt/defective winding.\n(b) Cleaning the stator body complete by rubbing with sand paper and removing all carbon.\n(c) Insert insulation material such as insulating paper sleeves.\n(d) Rewinding the stator with existing size of insulated copper winding wire as per original specification.\n(e) Clean the rotor and assembling in motor.\n(f) Replacing damaged bush / bearing.\n(g) Repacing pressure plate, water seal, damaged nuts & bolts etc.\n(h) Connecting / coupling the motor with pump, connect all earth / electric connections, foundations nuts bolts at its original position and testing on load complete all as specified and directed.\n | 1 | Each Job | |
| 108 | 92 | Taking out damaged unserviceable heavy duty GI pipe sections from existing Fire lines of any specifictions complete all as specified and directed | 20 | RM | |
| 109 | 93 | Supply and laying heavy class GI Pipe Fire lines including necessary joints by welding work / flanges, nuts and bolts and fixing accessories of size 100 mm bore dia complete all as specified and directed | 20 | RM | |
| 110 | 94 | Supply and fixing Butterfly valve Class PN 1.6 in replacement including taking out old damaged valves, necessary cutting welding, flanges, nut bolts packing etc suitable for 100 mm size, Fire Fighting lines complete all as specified and directed | 6 | Each | |
| 111 | 95 | Supply and fixing Butterfly valve Class PN 1.6 in replacement including taking out old damaged valves, necessary cutting welding, flanges, nut bolts packing etc suitable for 150 mm size, Fire Fighting lines complete all as specified and directed | 4 | Each | |
| 112 | 96 | Taking out old unserviceable and S & F rubberized fabric reinforced rubber lined fire hose (RRL Hose) including gunmetal male and female instantaneous type of coupling hose confirming to IS 636 type II and coupling confirming IS 903-1975 in all respect 15 mtr long complete all as specified and directed | 4 | Each | |
| 113 | 97 | Supply and Fixing in replacement Fire Hydrant valve double headed gun metal suitable for 100 mm pipe sections complete all as specified and directed | 6 | Each | |
| 114 | 98 | Supply and Fixing in replacement Fire Hydrant valve single headed gun metal suitable for 80 mm pipe sections complete all as specified and directed | 3 | Each | |
| 115 | 99 | Supply and Fixing in replacement Gun metal Gate Valve heavy duty suitable for 25 mm bore dia bore Pipe lines complete all as specified and directed | 8 | Each | |
| 116 | 100 | Taking out old unserviceable and S & F cast iron swing check type reflex valve (non return valve) heavy duty double flanged complete with by pass arrangement, designed for a pressure of 7 kg/sq, cm of size 100 mm bore complete all as specified and directed | 1 | Each | |
| 117 | 101 | Taking out old unserviceable and S & F cast iron swing check type reflex valve (non return valve) heavy duty double flanged complete with by pass arrangement, designed for a pressure of 7 kg/sq, cm of size 150 mm bore complete all as specified and directed | 2 | Each | |
| 118 | 102 | M & L for painting of external fire hose cabinets, Fire lines etc with two coats of synthetic enamel paint colour red on external surfaces and two coat internal with white paint on internal surfaces over one coat of red oxide primer after preparation of surfaces complete all as specified and directed | 100 | Sqm | |
| 119 | 103 | Supply & fixing in replacement Fire Brigade inlet connection 2 way complete all as specified and directed | 5 | Each | |
| 120 | 104 | Supply and fixing in replacement of damaged glass wired glass panes 6 mm thick suitable for existing fire cabinet outdoor type complete all as specified and directed | 10 | Each | |
| 121 | 105 | Supply and fixing in replacement of damaged glass wired glass panes 6 mm thick suitable for existing fire cabinet indoor type complete all as specified and directed | 20 | Each | |
| 122 | 106 | Supply and fixing in replacement Gun metal lugs assembly for ISI marked Fire Hydrent valve complete all as specified and directed | 15 | Each |