}

Routines On Both Main Engine Gear Boxes On Ins Sujata, Visakhapatnam-Andhra Pradesh

Hindustan Shipyard Limited has published Routines On Both Main Engine Gear Boxes On Ins Sujata. Submission Date for this Tender is 27-05-2020. Bolts Tenders in Visakhapatnam Andhra Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

24352487
Routines On Both Main Engine Gear Boxes On Ins Sujata
Open Tender
NCB
Andhra Pradesh
Visakhapatnam
27-05-2020

Tender Details

Routines On Both Main Engine Gear Boxes On Ins Sujata , Sow For Servicing Of M/E Gearbox ( 2000 Hrly Routines ) : 2000 Hrly , Nr And 4 Monthly Routineson Both Gear Box ( Port And Stbd Gearbox ) ( Renk Precision Marine Reduction Gear ) Make : Renk Tacke Model : Asl69 Port Gb Sl . No . 641183& Stbd Gb Sl No . 641184 , Model: Asl 69Ccw/Cw; Complete Overhauling/Repair Works Are To Be Carried Out Under Supervision Of Oem Service Engineer On Both Reduction Gear Boxes Along With Their Auxiliary Systems And Equipments , System To Be Proved To The Satisfaction Of Ship Staff / Naval Trial Agency . Clean The Complete Gear Box . Trials To Be Offered To Naval Trials Agencies Post Completion Of Routines . Defects / Observations Brought Out During Full Power Trials And During Inspection Of Gearing And Clutch Plates By Naval Trial Agency / Authorize Agency To Be Liquidated And Trials/Inspection To Be Reoffered . Check Alignment Between Engine/Rg And Rg/Output Shaft On Completion Of Major Overhaul . Qty - 02 Nos , A ) Both Gear Box To Be Strip Opened . Inspect All Gears For Damage And Replace/ Repair If Necessary . Replace Clutch Plates . Replace All Bearings In Gear Box . Replace All Seals/ Gaskets/ O Rings In Gear Box . Inspect Gear Box Casing For Corrosion/ Damage And Repair/ Replace If Necessary . Inspect Spline Shafts For Damage And Repair/ Replace If Necessary . B ) Inspect And Replace Pump Drives Of Sea Water Pump , Cpp Lub Oil Pump And Both Gear Box Lub Oil Pump - 08 Nos . C ) Renew Foundation Bolts - 16 Nos . D ) Inspect Gear Teeth . Check Pattern On The Tooth Flanks Produced By Continual Transmission Of Power And Compare With Previous Condition . In Case Of One Sided Wear , Pitting , Abrasion Caused By Sliding Friction , Etc . Carry Out Re-Alignment As Per Eqpt Manual . , Gear Box Valve: Clean And Refit Sensors Elements And Sliding Valve Of Temperature Regulating Valves . Replace Them If Found Defective . Replace Temperature Regulating Valve , Pt . No . Er6200b-6803343-6275 . Renew Relief Valve In Lub Oil System . Remote Control Operation . Renew Clutch/Declutch Solenoid Valve . Automatic Control Of Oil Pump Aggregates To Be Calibrated . , Gear Box Lo System: Gear Box Gear Driven Lub Oil Pump Performance Suboptimal Pump To Be Overhauled . Following Job To Be Carried Out:- Dismantlimg Of Pump . Replace The Mechanical Seal . Renew All Seals And Joints . Renew All Worn Out Rubber Bushes . Inspect The Shaft Clearance & Building Up Material If Required . Assemble The Pump And Refit It . Performance Trial To The Pump To Be Proven . Calibration/Pressure Setting Of Lo System Safety/Relief Valve Of Both Gear Box - 6 Nos . , Gear Box Lo Cooler To Be Chemically Clean And Pressure Test To Be Carried Out . Qty- 02 , Test Pressure- 5 . 5 Bar , Gear Box Lo System: Gear Box Motor Driven Lo Pump ( S/B Pump ) Prformance Found Suboptimal . Pump To Be Overhauled And Re-Fitted . Performance Trial Of The Pump To Be Proven . Calibration/Pressure Setting Of Gb Lo S/B Pump Safety/Relief Valve Of Both Gear Box . Auto Starting Of Both Motor Driven Gear Box S/B Pump To Be Proven Post Overhauling Of The Pump . , Following Pressure Gauge To Be Replaced Of Both Gear Box . Gauge Lines And Adaptor Are To Be Manufactured As Per Requirement . ( I ) Suction Pressure- 02 ( Range- 0-10 . 6 ) , Gear Box Turning Gear: Renew Grease In Turning Gear . Check Turningb Gear For Correct Operation . Overhaul If Required . , Both Gear Box Lo Cooler To Be Chemically Cleaned And Pressure Tested . , Both Gear Box Lo Cooler End Cover Studs , Zinc Plugs And Gaskets To Be Renewed . , Overhaul System Valves . ( Screwdown Valve Dia . 50Mm , Qty-04 Nos , Dia . 65Mm , Qty- 04Nos , Material-Bronze ) . Replace Any Valve If Found Defective . , Renew Temperature ( Range 0-150C , Qty . -06Nos . ) And Pressure Gauges ( Range 0-20Kg , Qty . -04Nos . , Range 0-40Kg , Qty . -02Nos . ) .

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail