| 1 | 1 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). | item1 | 5 | No |
|---|
| 2 | 2 | Loading HT 'A' type pole from the stacking place and unloading the same at work site (transport by vehicle). | item2 | 66 | No |
|---|
| 3 | 3 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. | item3 | 18 | Trip |
|---|
| 4 | 4 | Fitting and erecting one HT 'A' type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. | item4 | 60 | No |
|---|
| 5 | 5 | Drilling hole of various sizes on existing Channel/Cross Arm. | item5 | 40 | No |
|---|
| 6 | 6 | Additional rate for providing one disc set on any type of HT pole for making cut point. | item6 | 72 | No |
|---|
| 7 | 7 | Fitting and erecting one HT DP using 'A' type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. | item7 | 3 | No |
|---|
| 8 | 8 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. | item8 | 50 | No |
|---|
| 9 | 9 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. | item9 | 4 | No |
|---|
| 10 | 10 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits. | item10 | 1 | No |
|---|
| 11 | 11 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. | item11 | 30 | No |
|---|
| 12 | 12 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. | item12 | 20 | No |
|---|
| 13 | 13 | Additional rate for excavation of Pit for 'A' type pole in\nLaterite. | item13 | 40 | No |
|---|
| 14 | 14 | Additional rate for excavation of Pit for 'A' type pole in\nHard Laterite. | item14 | 26 | No |
|---|
| 15 | 15 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. | item15 | 1.8 | km |
|---|
| 16 | 16 | Fitting 5 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses. | item16 | 1 | No |
|---|
| 17 | 17 | Erecting one 100kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation. | item17 | 1 | No |
|---|
| 18 | 18 | Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line. | item18 | 3 | No |
|---|
| 19 | 19 | Installing one DTR Meter with box on existing poles and giving the complete connections incl. conveyance of materials. | item19 | 1 | No |
|---|
| 20 | 20 | Erection of LT 2 way distribution box on existing cross arm giving connection incl. cable and earth connection (excluding earthing). | item20 | 1 | No |
|---|
| 21 | 21 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. | item21 | 23 | No |
|---|
| 22 | 22 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. | item22 | 23 | No |
|---|
| 23 | 23 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. | item23 | 45 | No |
|---|
| 24 | 24 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. | item24 | 10 | No |
|---|
| 25 | 25 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. | item25 | 12 | No |
|---|
| 26 | 26 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | item26 | 40 | No |
|---|
| 27 | 27 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | item27 | 8 | No |
|---|
| 28 | 28 | Dismantling one section fuse | item28 | 6 | No |
|---|
| 29 | 29 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. | item29 | 14 | No |
|---|
| 30 | 30 | Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). | item30 | 5.4 | km/km |
|---|
| 31 | 31 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. | item31 | 12 | No |
|---|
| 32 | 32 | Fitting one additional HT pin with insulator | item32 | 14 | No |
|---|
| 33 | 33 | Fitting one set AB switch and giving connection | item33 | 2 | No |
|---|
| 34 | 34 | Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. | item34 | 15 | No |
|---|
| 35 | 35 | Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. | item35 | 6 | No |
|---|
| 36 | 36 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. | item36 | 61 | No |
|---|
| 37 | 37 | Reshackling one span LT Sph 2 wire OH line, replacing insulators, tightening stay, cutting tree branches incl. conveyance. | item37 | 11 | No |
|---|
| 38 | 38 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. | item38 | 80 | No |
|---|
| 39 | 39 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. | item39 | 16 | No |
|---|
| 40 | 40 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. | item40 | 6 | No |
|---|
| 41 | 41 | Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6 mm MS flat and 8 mm MS rod as specified, incl cost of transportation & foundation | item41 | 28.8 | No |
|---|
| 42 | 42 | Providing yard metallings with 6mm & 40mm thick blue metal as specified after constructing a curb wall. | item42 | 15.75 | No |
|---|
| 43 | 43 | Providing Bucket type cradling for one span 11kV line using 8 SWG GI wire including provision of two stays and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing | item43 | 3 | No |
|---|
| 44 | 44 | Providing barbed wire protection (2.5m height) for one11kV pole. | item44 | 66 | No |
|---|
| 45 | 45 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). | item45 | 66 | No |
|---|