Servicing Of Spts , Flood Alarm System , Acos And Servicing Of Spts , Flood Alarm System , Acos AndInstrumentation Works On Cpp Gear Box Controls , Electrical Works ( Servicing Of Spts , Flood Alarm System , Acos And Instrumentation Works On Cpp & Gear Box Controls ) On Turnkey Basis Of Ins Sujata ( Nr-19 ) :Complete Scope Of Work Is To Be Executed ( Including Spares/Material/Consumables/Components ) And Finally Satisfactory Trials To Be Shown To The Shipstaff/Hsl/All Navy Trial Agencies . , Following Pressure Gauge To Be Replaced Of Both Gear Box . Gauge Lines And Adaptor Are To Be Manufactured As Per Requirement . ( I ) Suction Pressure ( Range- 0-10 . 6 ) - 2 Nos ( Ii ) L/O Pressure Before Filter ( Range- 0-10 . 6 Bar ) - 2 Nos ( Iii ) L/O Pressure After Filter ( Range- 0-10 . 6 Bar ) - 2 Nos ( Iv ) Opertating Oil Pressure Inlet ( Range- 0-42 Bar ) - 2 Nos ( V ) S/W Pressure ( Range- 0-10 . 6 Bar ) - 2 Nos , Renew Temepreature Sensor And Remote Indicator At Mcr Of Plummer Block . Calibaration Certificate To Be Provided . , Temp . Indicator For Plumber Block & Stern Tube To Be Calibrated . Vendor To Procure And Renew If Defective , Auto Starting Of Cpp Motor Driven Pump To Be Proven . Cut In Pressure- 16 Bar And Cut Out Pressure- 19 Bar . , Auto Starting Of The Pump To Be Proven Of Cpp Header Pump . Level Switches , Control Wirings And Starter To Be Checked And Proved For Auto Starting . , Carry Out Functional Checks Of All Cpp Alarms And Indicators Including Transmitters . Repair/ Replace Defective Components . System To Be Proved With Loacal And Mcr Console . , Performance Of Both Cpp 24V Dc Pitch Back Up Motor Found Sub Optimal . Both Cpp 24V Dc Pitch Back Up Motor To Be Replaced . System To Be Proved . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Required Consumables / Components / Items / Spares / Material Mentioned AtS . No 1 To 8 For Above Scope Of Work . The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For This Line Item For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 9 ) Against Third Party/Oem Invoice . , Main Sound Power Telephone Make : Amplidan . The Scope Of Work As Follows: , Serviceability Checks Of All Spts To Be Carried Out . Defects If Any To Be Rectified . , Inspect The Receiver And The Knob For Proper Functioning . Defects Observed To Be Rectified . , Generator To Be Procured And Replaced View Generator Defective . , New Spts To Be Procured And Replaced View Spt Declared Ber . , Hand Sets With Mouth Peace & Ear Peace To Be Procured And Replaced View Defective . , Cable Cords Of Hand Set To Be Procured And Replaced By Vendor View Cable Defective . , Hooters To Be Procured And Replaced By Vendor View Hooter Non Operational . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Required Consumables / Components / Items / Spares / Material Mentioned AtS . No 10 To 17 For Above Scope Of Work . The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For This Line Item For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 18 ) Against Third Party/Oem Invoice . , Flood Alarm System The Scope Of Work Is As Follows: , Overhaul Of Main Control Unit ( 35Zone ) , Overhaul Of Power Supply Unit Fitted In Dchq , Carry Out Serviceabilty Check Of All Sensors And Ensure Proper Functioning . , Overhaul Of Battery Cabinet Fitted In Dchq , Carry Out Overhauling Zone Panel , Flood Sensors Defective To Be Procured And Replace . All Defective Items Be Procured By Vendor . , Sensor Base Plate Corodded To Be Anufactured And Fitted . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Required Consumables / Components / Items / Spares / Material Mentioned AtS . No 19 To 26 For Above Scope Of Work . The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For This Line Item For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 27 ) Against Third Party/Oem Invoice . , Auto Change Over Switch ( 415V , 3Ph , 50Hz ) Make : Jinkwang Electric Co Ltd . The Scope Of Work As Follows: , Carry Out Overhauling Of Acos . Clean All The Components And Ensure Proper Functioning Of Each Components . , Take Trials Of Each Acos And Ensure Proper Changeover On Failure Of Normal Supply Within The Designated Time Limit . , Ensure Manual Operation , Indication Led To Be Procured And Replaced . , Fuse Base To Be Procured And Replaced . , Auxiliary Relay To Be Procured And Replaced . , Trials Of Acos To Be Carried Out For Satisfactory Operations Iaw Naval Trial Agency Specifications . Test Change Over Switch Opertation . Reduce The Normal Supply Voltage Between 75% To 80% , Switch Should Change Over To Alternative , Increase Supply Between 90% To 95% , Then Switch Should Revert To Normal . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Required Consumables / Components / Items / Spares / Material Mentioned AtS . No 28 To 35 For Above Scope Of Work . The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For This Line Item For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 36 ) Against Third Party/Oem Invoice .