| 1 | 1 | Handling and Fabrication of material at Divisional stores Udhampur | | | |
|---|
| 2 | 1.01 | Unloading of PCC Poles 11 Mtr Long | item1 | 1 | No. |
|---|
| 3 | 1.02 | Unloading of PCC Poles 9 Mtr Long | item2 | 1 | No. |
|---|
| 4 | 1.03 | Unloading of PCC Poles 8 Mtr Long | item3 | 1 | No |
|---|
| 5 | 1.04 | Unloading of ST Poles 13 Mtr Long | item4 | 1 | No |
|---|
| 6 | 1.05 | Unloading of ST Poles 11Mtr Long | item5 | 1 | No |
|---|
| 7 | 1.06 | Unloading of ST Poles 9 Mtr Long | item6 | 1 | No |
|---|
| 8 | 1.07 | Unloading of ST Poles 8 Mtr Long | item7 | 1 | No |
|---|
| 9 | 1.08 | Loading of PCC Poles 11 Mtr Long | item8 | 1 | No |
|---|
| 10 | 1.09 | Loading of PCC Poles 9 Mtr Long | item9 | 1 | No |
|---|
| 11 | 1.1 | Loading of PCC Poles 8 Mtr Long | item10 | 1 | No |
|---|
| 12 | 1.11 | Loading of ST Poles 13 Mtr Long | item11 | 1 | No |
|---|
| 13 | 1.12 | Loading of ST Poles 11Mtr Long | item12 | 1 | No |
|---|
| 14 | 1.13 | Loading of ST Poles 9 Mtr Long | item13 | 1 | No |
|---|
| 15 | 1.14 | Loading of ST Poles 8 Mtr Long | item14 | 1 | No |
|---|
| 16 | 1.15 | Shifting/ Dragging of existing / New PCC/ ST Poles at a average distance upto 50 Mtr for stacking to easily accesible place for loading/Unoading Purpose and its stacking | item15 | 1 | No |
|---|
| 17 | 1.16 | Unloading of 25 KVA Transformer(New/ Old/ Damaged Transformer) | item16 | 1 | No |
|---|
| 18 | 1.17 | Unloading of 63 KVA Transformer(New/ Old/ Damaged Transformer) | item17 | 1 | No |
|---|
| 19 | 1.18 | Unloading of 100 KVA Transformer(New/ Old/ Damaged Transformer) | item18 | 1 | No |
|---|
| 20 | 1.19 | Unloading of 250 KVA Transformer(New/ Old/ Damaged Transformer) | item19 | 1 | No |
|---|
| 21 | 1.2 | Unloading of 400 KVA Transformer(New/ Old / Damaged Transformer) | item20 | 1 | No |
|---|
| 22 | 1.21 | Unloading of 630 KVA Transformer(New/ Old/ Damaged Transformer) | item21 | 1 | No |
|---|
| 23 | 1.22 | Loading of 25 KVA Transformer | item22 | 1 | No |
|---|
| 24 | 1.23 | Loading of 63 KVA Transformer | item23 | 1 | No |
|---|
| 25 | 1.24 | Loading of 100 KVA Transformer | item24 | 1 | No |
|---|
| 26 | 1.25 | Loading of 250 KVA Transformer | item25 | 1 | No |
|---|
| 27 | 1.26 | Loading of 400 KVA Transformer | item26 | 1 | No |
|---|
| 28 | 1.27 | Loading of 630 KVA Transformer | item27 | 1 | No |
|---|
| 29 | 1.28 | Dragging of existing / New / Damaged 25 KVA Tranformer at an average distance upto 50 Mtr and its stacking properly | item28 | 1 | No |
|---|
| 30 | 1.29 | Dragging of existing / New 50/ 63 KVA Tranformer at an average distance upto 50 Mtr and its stacking properly | item29 | 1 | No |
|---|
| 31 | 1.3 | Dragging of existing / New / Damaged 100 KVA Tranformer at an average distance upto 50 Mtr and its stacking properly | item30 | 1 | No |
|---|
| 32 | 1.31 | Dragging of existing /New /Damaged 200/ 250 KVA Tranformer at an average distance upto 50 Mtr and its stacking properly | item31 | 1 | No |
|---|
| 33 | 1.32 | Dragging of existing /New/Damaged 300/ 400KVA Tranformer at an average distance upto 50 Mtr and its stacking properly | item32 | 1 | No |
|---|
| 34 | 1.33 | Dragging of existing / New/ Damaged 630 KVA Tranformer at an average distance upto 50 Mtr and its stacking properly | item33 | 1 | No |
|---|
| 35 | 1.34 | Unloading of Old/ New ACSR Conductor | item34 | 1 | Qtl |
|---|
| 36 | 1.35 | Loading of Old/ New ACSR Conductor | item35 | 1 | Qtl |
|---|
| 37 | 1.36 | Shifting of Old/ New ACSR Conductor from unloading site to stacking site at an average distance upto 50 Mtr and its stacking | item36 | 1 | Qtl |
|---|
| 38 | 1.37 | Unloading of DPC CU/ AL Wire | item37 | 1 | Qtl |
|---|
| 39 | 1.38 | Loading of DPC CU/ AL Wire | item38 | 1 | Qtl |
|---|
| 40 | 1.39 | Stacking of Single/ Three phase meters | item39 | 1 | No |
|---|
| 41 | 1.4 | UnLoading of Channel/ Angle/ Flat Iron | item40 | 1 | Qtl |
|---|
| 42 | 1.41 | Loading of Channel/Angle/Flat Iron | item41 | 1 | Qtl |
|---|
| 43 | 1.42 | Carriage/ Shifting of Channel/ Angle/ Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly | item42 | 1 | Qtl |
|---|
| 44 | 1.43 | Unloading of PVC Cable single core 95/ 120/ 185 mm sq | item43 | 1 | mtr |
|---|
| 45 | 1.44 | Loading of PVC Cable single core 95/ 120/ 185 mm sq | item44 | 1 | mtr |
|---|
| 46 | 1.45 | Carriage/shifting of PVC Cable single core 95/ 120/ 185 mm sq | item45 | 1 | mtr |
|---|
| 47 | 1.46 | UnLoading of PVC Cable single core 300/ 400 mm sq | item46 | 1 | mtr |
|---|
| 48 | 1.47 | Loading of PVC Cable single core 300/ 400 mm sq | item47 | 1 | mtr |
|---|
| 49 | 1.48 | Carriage of PVC Cable single core 300/ 400 mm sq | item48 | 1 | Mtr |
|---|
| 50 | 1.49 | UnLoading of PVC Cable single core 630 mm sq | item49 | 1 | Mtr |
|---|
| 51 | 1.5 | Loading of PVC Cable single core 630 mm sq | item50 | 1 | Mtr |
|---|
| 52 | 1.51 | Carriage of PVC Cable single core 630 mm sq | item51 | 1 | Mtr |
|---|
| 53 | 1.52 | Unloading of AB/XLPE 25/ 35/ 50/ 70/ 95 mm sq single core Cable for HT/ LT Lines | item52 | 1 | Mtr |
|---|
| 54 | 1.53 | Loading of AB/XLPE 25/35/50/70/95 mm sq single core Cable for HT/ LT Lines | item53 | 1 | Mtr |
|---|
| 55 | 1.54 | Carriage of AB/XLPE 25 /35/ 50/ 70/ 95 mm sq single core Cable for HT/ LT Lines | item54 | 1 | Mtr |
|---|
| 56 | 1.55 | Unloading of AB/XLPE 120/ 150/ 185/ 240 mmsq single core Cable for HT/ LT Lines | item55 | 1 | Mtr |
|---|
| 57 | 1.56 | Loading of AB/ XLPE 120/ 150/ 185/ 240 mm sq single core Cable for HT/LT Lines | item56 | 1 | Mtr |
|---|
| 58 | 1.57 | Carriage of AB/ XLPE 120/ 150/ 185/ 240 mm sq single core Cable for HT/ LTLines | item57 | 1 | Mtr |
|---|
| 59 | 1.58 | Unloading of AB/XLPE 25/ 35/ 50 mm sq three core Cable for HT/ LT Lines | item58 | 1 | Mtr |
|---|
| 60 | 1.59 | Loading of AB/XLPE 25/ 35/ 50 mm sq three core Cable for HT/ LT Lines | item59 | 1 | Mtr |
|---|
| 61 | 1.6 | Carriage of AB/XLPE 25/ 35/ 50 mm sq three core Cable for HT/LT Lines | item60 | 1 | Mtr |
|---|
| 62 | 1.61 | Unloading of AB/XLPE 70/ 95 mm sq three core Cable for HT/LT Lines | item61 | 1 | Mtr |
|---|
| 63 | 1.62 | Loading of AB/XLPE 70/ 95mmsq three coreCable for HT/LT Lines | item62 | 1 | Mtr |
|---|
| 64 | 1.63 | Carriage of AB/XLPE 70/ 95 mm sq three core Cable for HT Lines upto first 100 mtrs | item63 | 1 | Mtr |
|---|
| 65 | 1.64 | Unloading of AB/XLPE 120/ 150 mm sq three core Cable for HTLines | item64 | 1 | Mtr |
|---|
| 66 | 1.65 | Loading of AB/XLPE 120/ 150 mm sq three core Cable for HT /LTLines | item65 | 1 | Mtr |
|---|
| 67 | 1.66 | Carriage of AB/XLPE 120/ 150 mm sq three core Cable for HT/LT Lines | item66 | 1 | Mtr |
|---|
| 68 | 1.67 | UnLoading of AB/ XLPE 185/ 240 mm sq three core Cable for HT/ LT Lines | item67 | 1 | Mtr |
|---|
| 69 | 1.68 | Loading of AB/XLPE 185/ 240 mm sq three core Cable for HT Lines | item68 | 1 | Mtr |
|---|
| 70 | 1.69 | Carriage of AB/XLPE 185/240 mm sq three core Cable for HT Lines | item69 | 1 | Mtr |
|---|
| 71 | 1.7 | UnLoading of AB/ XLPE 300/ 400 mm sq three core Cable for HT Lines | item70 | 1 | Mtr |
|---|
| 72 | 1.71 | Loading of AB/XLPE 300/ 400 mm sq three core Cable for HT/ LT Lines | item71 | 1 | Mtr |
|---|
| 73 | 1.72 | Carriage of AB/XLPE 300/ 400 mm sq three core Cable for HT/ LT Lines | item72 | 1 | Mtr |
|---|
| 74 | 1.73 | Fabrication of Channel Cross Arms of sorts | item73 | 1 | Mtr |
|---|
| 75 | 1.74 | Fabrication of clamps from MS flat (suitable for 8 mtr/9mtr, 11 mtr and 13 mtr poles) | item74 | 1 | Mtr |
|---|
| 76 | 1.75 | Fabrication of Earthing Plates from MS plate | item75 | 1 | no. |
|---|
| 77 | 1.76 | Fabrication of earthing spikes from MS tar steel of sorts as per REC Standards | item76 | 1 | no. |
|---|
| 78 | 1.77 | Fabrication of foundation bolts from MS tor steel including threading as per REC Standards | item77 | 1 | no. |
|---|
| 79 | 1.78 | Fabrication of Earthing pipe from GI pipe and welding of earthing plate as per REC Standards | item78 | 1 | no. |
|---|
| 80 | 1.79 | Unloading/Loading of Straight jointing kit/Heat shrinkable Kit for AB/ XLPE cables of HT/ LT Lines | item79 | 1 | no. |
|---|
| 81 | 1.8 | Unreeling, laying of ACSR Weasel/ Squirrel/ Rabbit conductor | item80 | 1 | Mtr |
|---|
| 82 | 1.81 | Cutting of ACSR Weasel/ Squirrel/ Rabbit conductor, making bundles of conductor and stacking within 25 mtrs. | item81 | 1 | Mtr |
|---|
| 83 | 1.82 | Unreeling, laying of PVC Cables | item82 | 1 | Mtr |
|---|
| 84 | 1.83 | Cutting and making bundles of PVC Cables and stacking | item83 | 1 | Mtr |
|---|
| 85 | 1.84 | Unreeling, laying of XLPE Cables | item84 | 1 | Mtr |
|---|
| 86 | 1.85 | Cutting and making bundles of XLPE Cables and stacking | item85 | 1 | Mtr |
|---|
| 87 | 1.86 | Unreeling, laying of PVC/ XLPE/ AB Cables | item86 | 1 | Mtr |
|---|
| 88 | 1.87 | Cutting and making bundles of PVC/ XLPE/ AB Cables and stacking | item87 | 1 | Mtr |
|---|
| 89 | 1.88 | Unloading of Link/ Knife/ HG/ DO/ LA Set | item88 | 1 | No |
|---|
| 90 | 1.89 | Loading of HG/ DO/ LA/ GO Set | item89 | 1 | No |
|---|
| 91 | 1.9 | Carriage/ Stacking of HG/ DO/ LA/ GO Set | item90 | 1 | No |
|---|
| 92 | 1.91 | Unloading of CT/ PT Unit | item91 | 1 | No |
|---|
| 93 | 1.92 | Loading of CT/ PT Unit | item92 | 1 | No |
|---|
| 94 | 1.93 | Carriage/ Stacking of CT/ PT Unit | item93 | 1 | No |
|---|
| 95 | 1.94 | UnLoading of 11KV Disc Insulators / Pin Insulators | item94 | 1 | No |
|---|
| 96 | 1.95 | Loading of 11kv Disc Insulators/ Pin Insulators | item95 | 1 | No |
|---|
| 97 | 1.96 | Carriage/ Stacking of 11kv Disc Insulators/ Pin Insulators | item96 | 1 | No |
|---|
| 98 | 1.97 | UnLoading of Shackle/ Busbar Insulators | item97 | 1 | No |
|---|
| 99 | 1.98 | Loading of Shackle/ Busbar Insulators | item98 | 1 | No |
|---|
| 100 | 1.99 | Carriage/ Stacking of Shackle/ Busbar Insulators | item99 | 1 | No |
|---|
| 101 | 2 | UnLoading of Al Busbar/ Al Strip | item100 | 1 | kg |
|---|
| 102 | 2.01 | Loading of Al Busbar/ Al Strip | item101 | 1 | kg |
|---|
| 103 | 2.02 | Carriage/Stacking of Al Busbar/ Al Strip | item102 | 1 | kg |
|---|
| 104 | 2.03 | UnLoading of GI wire / Guy wire | item103 | 1 | kg |
|---|
| 105 | 2.04 | Loading of GI wire / Guy wire | item104 | 1 | kg |
|---|
| 106 | 2.05 | Carriage/ Stacking of GI wire / Guy wire | item105 | 1 | kg |
|---|
| 107 | 2.06 | UnLoading of HV/ LV Bush Insulators | item106 | 1 | No |
|---|
| 108 | 2.07 | Loading of HV/ LV Bush Insulators | item107 | 1 | No |
|---|
| 109 | 2.08 | Carriage/Stacking of HV/ LV Bush Insulators | item108 | 1 | No |
|---|
| 110 | 2.09 | Un loading of HV/ LV Bushrods | item109 | 1 | No |
|---|
| 111 | 2.1 | Loading of HV/ LV Bushrods | item110 | 1 | No |
|---|
| 112 | 2.11 | Carriage/Stacking of HV/LV Bushrods | item111 | 1 | No |
|---|
| 113 | 2.12 | Unloading of Earthing rods etc | item112 | 1 | No |
|---|
| 114 | 2.13 | Loading of Earthing rods etc | item113 | 1 | No |
|---|
| 115 | 2.14 | Un loading of LT Switch 100A/ 200A | item114 | 1 | No |
|---|
| 116 | 2.15 | Loading of LT Switch 100A/ 200A | item115 | 1 | No |
|---|
| 117 | 2.16 | Carriage/Stacking of LT Switch 100A/200A | item116 | 1 | No |
|---|
| 118 | 2.17 | Carriage/ Stacking of Earthing rods etc | item117 | 1 | No |
|---|