Supply , Installation , Commissioning And Annual Maintenance And Operation Contract Of On Line Monitoring Of Rolling Stock ( Omrs ) Consisting Of Acoustic Bearing Detector ( Abd ) And Wheel Impact Load Detector ( Wild ) On Dfc Of Dfccil , New Delhi , Design , Development , Manufacture And Supply Of Wayside Data Collection Equipment Abd ( Acoustic Bearing Detector ) And Wheel Impact Load Detector ( Wild ) For Online Monitoring Of Rolling Stock System ( Omrs ) With Requisite Cabling As Per Specifications , Abd ( Acoustic Bearing Detector ) - Landed Cost Ddp , Abd ( Acoustic Bearing Detector ) - Foundation , Wild ( Wheel Impact Load Detector ) - Landed Cost Ddp , Wild ( Wheel Impact Load Detector ) - Foundation , Equipment Hut With Necessary Instrumentation And Software For Acoustic Signature Analysis Of Bearing Detection And Wheel Impact Detection ( Preferably Acoustic Based ) And Integration With Other Data Stream Including Vehicle Identification , Network Data Connectivity Software & Infrastructure From Site To Control Room And Provisions For Online Ups & Back Up For 16 Hours . Media Converters Or Routers For Fibre Cable Connection . Lightning And Surge Earthing To Be Provided . Structure To House The Equipments With Outside Paved Floor All Around And Security Xpm Barrier , Provision Including Cabling For Connecting To The Power Supply And Data Network From Point Given By Dfc , Cost Of Power Cable For 1 Kilometres , 230 V And Single Phase With Duct , Optical Connection: Cost Of 6 Core Corrugated Armoured Optical Fibre Cable ( Ofc ) With Duct For 1 Kilometre , Along With Small Form Factor ( Sfp ) Device ( To Convert Electrical Signal To Optical Signal Or Vice-Versa ) /Equipments For Connection To Dfc Ofc . , Audio-Visual Alarm Node With 500 Va Ups And Lan Patch-Up Equipment For Connecting To Dfccil Network At The Workshops And Headquarter With Facility For Real Time Alarms . , Hardware , Software , Central Control With Necessary Software , Database , Network Data Connectivity Infrastructure To Ofc And Internet , Provision For Network Security And Monitoring , Large Display System , Lighting , Air-Conditioning , Signage And Furnishing , Lightning And Surge Protection ( Building Space Will Be Provided By Dfccl ) , Back-Up Time Of 16 Hours . Approx . Total Area 4500 Sq . Feet , Hardware , Software , Connectivity Centre At Dfc Hq , Comprehensive Annual Maintenance & Operation Contract ( Amoc ) Including Spares For A Period Of 5 Years Including Warranty Period Of 3 Years . Operation Of Omrs Including Connectivity And Calibration Kit During 3 Years Warranty And 2 Years Amc Period ( Total 5 Years ) Including Site Security , Operation At Control Centre ( 3 Shifts + Lr ) ( For Complete 11 Set Of Omrs Equipments . ) , 1St Year Amoc Cost , ( Pv Factor = . 7513 ) , 2Nd Year Amoc Cost , ( Pv Factor = . 6830 ) , 3Rd Year Amoc Cost , ( Pv Factor = . 6209 ) , 4Th Year Amoc Cost , ( Pv Factor = . 5645 ) , 5Th Year Amoc Cost , ( Pv Factor = . 5132 ) , Comprehensive Annual Maintenance & Operation Contract ( Amoc ) Including Spares For A Period Of 10 Years After 5 Years . Operation Of Omrs Including Connectivity And Calibration Kit During 10 Year Amc Period ( Total 10 Years ) Including Site Security , Operation At Control Centre ( 3 Shifts + Lr ) ( For Complete 11 Set Of Omrs Equipments . ) , 6Th Year Amoc Cost , ( Pv Factor = . 4665 ) , 7Th Year Amoc Cost , ( Pv Factor = . 4241 ) , 8Th Year Amoc Cost , ( Pv Factor = . 3855 ) , 9Th Year Amoc Cost , ( Pv Factor = . 3505 ) , 10Th Year Amoc Cost , ( Pv Factor = . 3186 ) , 11Th Year Amoc Cost , ( Pv Factor = . 2897 ) , 12Th Year Amoc Cost , ( Pv Factor = . 2633 ) , 13Th Year Amoc Cost , ( Pv Factor = . 2394 ) , 14Th Year Amoc Cost , ( Pv Factor = . 2176 ) , 15Th Year Amoc Cost , ( Pv Factor = . 1978 ) , Nb: Amoc Cost Will Be Calculated After Multiplying Quoted Rates With Pv Factor I . E . After Discounting Annual Cost @ 10% Per Annum , Training , Training Of Dfccil Staff At Site For Operation , Maintenance And Interpretation Of Measured Data . , Training At Manufacturer Premises For 5 Key Personnel For 6 Mandays Each , Cost Of Validation , Trial And Commissioning Prove Out For Initial 1St Set Of Equipments , Supply , Installation And Commissioning Of Pvis ( Photographic Vehicle Identification System ) At Each Site ( Upto Ddp Locations ) , Agency Commission , If Any