| 1 | 1 | Remuneration for Local Staff | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.1 | Team Leader Cum Senior Pavement Engineer (1 No) | BI01010001010000000000000515BI0100001113 | 24 | Months |
|---|
| 3 | 1.2 | Resident cum Highway Engineer 1 (1 No) | BI01010001010000000000000515BI0100001114 | 24 | Months |
|---|
| 4 | 1.3 | Resident cum Highway Engineer 2 (1 No) | BI01010001010000000000000515BI0100001115 | 24 | Months |
|---|
| 5 | 1.4 | Senior Quality Cum Material Expert (1 No) | BI01010001010000000000000515BI0100001116 | 24 | Months |
|---|
| 6 | 1.5 | Senior Quality Cum Material Expert (1 No) | BI01010001010000000000000515BI0100001117 | 24 | Months |
|---|
| 7 | 1.6 | Bridge/Structural Engineer (1 No) | BI01010001010000000000000515BI0100001118 | 18 | Months |
|---|
| 8 | 1.7 | Road Safety Expert (1 No) | BI01010001010000000000000515BI0100001119 | 9 | Months |
|---|
| 9 | 2 | Sub-Professional Staff | BI01010001010000000000000515BI0100001120 | | |
|---|
| 10 | 2.1 | Survey Engineer (06 Nos.), one for each | BI01010001010000000000000515BI0100001121 | 128 | Months |
|---|
| 11 | 2.2 | Assistant Highway Engineer (06 Nos.), one for each package | BI01010001010000000000000515BI0100001122 | 228 | Months |
|---|
| 12 | 2.3 | Assistant Bridge Engineer (2 No) | BI01010001010000000000000515BI0100001123 | 48 | Months |
|---|
| 13 | 2.4 | Environmental Engineer (1 No.) | BI01010001010000000000000515BI0100001124 | 24 | Months |
|---|
| 14 | 2.5 | Assistant Quality cum material Engineer (06 Nos.), one for each package | BI01010001010000000000000515BI0100001125 | 114 | Months |
|---|
| 15 | 2.6 | Quantity Surveyor (03 Nos.), one for package 1&2, one for package 3&B1 and one for package B2&B3 | BI01010001010000000000000515BI0100001126 | 78 | Months |
|---|
| 16 | 3 | Support Staff (inclusive of per diem allowance) | BI01010001010000000000000515BI0100001127 | | |
|---|
| 17 | 3.1 | Office Manager (3 No) | BI01010001010000000000000515BI0100001128 | 78 | Months |
|---|
| 18 | 3.2 | Accountant Cum Cashier (2 No) | BI01010001010000000000000515BI0100001129 | 78 | Months |
|---|
| 19 | 3.3 | Steno cum Computer operator (6 No) | BI01010001010000000000000515BI0100001130 | 78 | Months |
|---|
| 20 | 3.4 | Office Boy (3 No) | BI01010001010000000000000515BI0100001131 | 78 | Months |
|---|
| 21 | 4 | Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run | BI01010001010000000000000515BI0100001132 | | |
|---|
| 22 | 4.1 | Scorpio or equivalent 4x4 vehicle(not more than 3 years old) (4 nos during Construction Period and 1 nos during Maintenance Period.) | BI01010001010000000000000515BI0100001133 | 132 | Months |
|---|
| 23 | 4.2 | Bolero or equivalent 4x4 vehicle(not more than 3 years old) (3 nos during Construction Period and 1 nos during Maintenance Period.) | BI01010001010000000000000515BI0100001134 | 114 | Months |
|---|
| 24 | 5 | Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 18 round trip to Employer's Head Office and 18 round trip to Employer's regional office. (including Hotel Charges, travel costs etc. complete) | BI01010001010000000000000515BI0100001135 | 1 | LS |
|---|
| 25 | 6 | Office Rent (Fixed Costs) \nThe rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. | BI01010001010000000000000515BI0100001136 | | |
|---|
| 26 | 6.1 | Minimum Two Offices of 150 sqm area of each Office shall be rented during Construction Period | BI01010001010000000000000515BI0100001137 | 18 | Months |
|---|
| 27 | 6.2 | Minimum Two Offices of 50 sqm area of each Office shall be rented during Maintenace Period | BI01010001010000000000000515BI0100001138 | 60 | Months |
|---|
| 28 | 7 | Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc. | BI01010001010000000000000515BI0100001139 | | |
|---|
| 29 | 7.1 | During Construction Period | BI01010001010000000000000515BI0100001140 | 18 | Months |
|---|
| 30 | 7.2 | During Maintenance Period | BI01010001010000000000000515BI0100001141 | 60 | Months |
|---|
| 31 | 8 | Office Furniture and Equipment (Rental) : \nThe cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Executive Table, Executive Chairs, Tables (for executive), Ordinary Chairs Type-I, Tables (for all other staff), Ordinary Chairs–Type II (for all other staff), Steel Almirah, Visitors chairs/Conference room chairs, Tables for computers with 3 drawers, keyboard/mouse pull out trays, Printer desks, Side tables, Conference Table, Revolving Chairs for Computer Room/Drawing room, Telephone with PABX facilities, Photocopier, FAX, Computer PC (state of the art), LaserJet Printers, Binding Machine, Water Coolers and Software, Plotter, Biometric device etc.\n | BI01010001010000000000000515BI0100001142 | | |
|---|
| 32 | 8.1 | During Construction Period | BI01010001010000000000000515BI0100001143 | 18 | Months |
|---|
| 33 | 8.2 | During Maintenance Period | BI01010001010000000000000515BI0100001144 | 60 | Months |
|---|
| 34 | 9 | Reports and Document Printing | BI01010001010000000000000515BI0100001145 | | |
|---|
| 35 | 9.1 | Monthly reports\n | BI01010001010000000000000515BI0100001146 | 468 | Nos |
|---|
| 36 | 9.2 | Half yearly Reports | BI01010001010000000000000515BI0100001147 | 78 | Nos |
|---|
| 37 | 9.3 | Various other reports as provided in the Concession Agreement such as Completion Report | BI01010001010000000000000515BI0100001148 | 12 | Nos |
|---|
| 38 | 10 | Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc. | BI01010001010000000000000515BI0100001149 | | |
|---|
| 39 | 10.1 | Surface defects detection and roughness measurement\nusing Network Survey Vehicle (80.638 kms x 8 times) | BI01010001010000000000000515BI0100001150 | 645.104 | Nos |
|---|
| 40 | 10.2 | Pavement strength measurement using FWD (80.638 kms x 4 times) | BI01010001010000000000000515BI0100001151 | 322.552 | Nos |
|---|
| 41 | 10.3 | Bridge inspection using Mobile Bridge Inspection Unit (80.638 kms x 8 times) | BI01010001010000000000000515BI0100001152 | 645.104 | Nos |
|---|
| 42 | 10.4 | Road signs inspection using Retro Reflectometer (80.638 kms x 8 times) | BI01010001010000000000000515BI0100001153 | 645.104 | Nos |
|---|
| 43 | 11 | Contigencies \nA fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal | BI01010001010000000000000515BI0100001154 | 1 | Nos |
|---|