| 1 | Survey work for investigation of Markandeya LIS | APSS | 3.00 | Nos. | 95445.00 | 286335.00 |
| Preparation of detailed estimates of electrical works, lifting systems and power components. Preparation of Detailed estimates for leading channel, link canal, main canal, and proposed and existing reservoirs and as per CWC Guidelines.(Data approved as per Thumilla Lift scheme) |
| 2 | Survey work for investigation of Markandeya LIS | APSS | 3.00 | Nos. | 95445.00 | 286335.00 |
| Investigation, Survey, Design of Pump motors and their associated equipment and all other electromechnical equipment of pumping station etc., as per CWC Guidelines. (Data approved as per Thumilla Lift scheme) |
| 3 | Survey work for investigation of Markandeya LIS | APSS | 5300.00 | Acre | 117.40 | 622220.00 |
| Preparation of Ayacut registers pipe wise on major, minor and sub-minor by asertaining the details such as the Sy.Nos, total Extent, Extent of irrigation, particulars of cultivation etc. from concerned revenue authorities and verifying the same in field marking suitable necessary corrections in command plans for each block including labour charges, cost of drawing materials, stationery, and all other materials and operations, required to complete finished item of work and supply of 6 copies of neatly computer typed, neatly binded. |
| 4 | Survey work for investigation of Markandeya LIS | APSS | 5300.00 | Acre | 109.65 | 581145.00 |
| Investigation , Conducting block levels for contours at an intervel of 1meter , fixing of alignment,preparation of HP\s, site survey of CM & CD works ,Design of structures and Preperation of Estimates for Earth work and CD & CM works of distributory network system consisting of Minor/Distibutories/Minors/Sub-Minors up to field channel including perperation of LP schedules up Field channel level. |
| 5 | Survey work for investigation of Markandeya LIS | APSS | 375.00 | No | 379.00 | 142125.00 |
| Conducting Geophysical investigation studies by Electrical Resistivity Method in stages of 5m for sub-surface details such as depth of formations, shear zones, classification of strata, depth of water table etc., including cost of all materials, equipments, labour, analysing and reporting the details of field studies conducted etc., complete including cost of transportation arrangements. IRR-PMW-2-3 |
| 6 | Survey work for investigation of Markandeya LIS | APSS | 95.00 | No. | 6719.00 | 638305.00 |
| Preparation of Estimates of CM&CD structures on Main Canal, Major Distributory as per departmental guide lines including all labour charges, cost of materials, stationery, etc. all materials, operations required to complete the finished item of work as directed by the Engineer-in-Charge and supply of 10 copies of neatly computer typed and neatly bounded estimate booklets, excluding printing and binding charges. |
| 7 | Survey work for investigation of Markandeya LIS | APSS | 31.90 | Km. | 4199.20 | 133954.48 |
| Preparation of Earth work estimates of Main Canal/Major distributory by adopting current SoR and Standard Data including labour charges, cost of drawing materials, stationery, and all other materials and operations, required to complete finished item of work and supply of 10 copies of neatly computer typed, neatly binded. |
| 8 | Survey work for investigation of Markandeya LIS | APSS | 95.00 | No. | 6719.00 | 638305.00 |
| Design of CM & CD structures on Main Canal, Major Distributory and preparation of drawings as per CE/CDO guide lines including all labour charges, cost of materials, stationery, etc. all materials, operations required to complete the finished item of work as directed by the as directed by Engineer-in-Charge and supply of 10 copies of design booklets. |
| 9 | Survey work for investigation of Markandeya LIS | APSS | 95.00 | No | 5375.00 | 510625.00 |
| Conducting the site surveys for CM & CD works as per CE, CDO guide lines including labour charges, cost of materials, paints, hire charges of suvey equipment, all materials and operations required for finished item of work as directed by the Engineer-in-charge duly marking contour lines @1m interval and all other features etc. |
| 10 | Survey work for investigation of Markandeya LIS | APSS | 31.90 | Km. | 5598.96 | 178606.82 |
| Preparation of Hydraulic particulars of Main Canal/Major distributories including all operations required to complete finished item of work and supply of 10 copies of neatly bounded HP booklets etc. as directed by Engineer-in-Charge |
| 11 | Survey work for investigation of Markandeya LIS | APSS | 192.00 | No. | 485.00 | 93120.00 |
| Providing and fixing granite cuddy stones of size 20 x 20 x 75 cm Center Line including cost of all materials, labour, painting etc.,complete with a lead upto 50 m and all lifts as directed by the Engineer-in-Charge. IRR PMW 2-8 |
| 12 | Survey work for investigation of Markandeya LIS | APSS | 382.00 | No. | 485.00 | 185270.00 |
| Providing and fixing granite cuddy stones of size 20 x 20 x 75 cm filling foundation with CC (1 : 4 : 8) for Land Acquisition boundary using 40 MSA including cost of all materials, labour, painting etc.,complete with a lead upto 50 m and all lifts as directed by the Engineer-in-Charge. IRR PMW 2-8 |
| 13 | Survey work for investigation of Markandeya LIS | APSS | 253.00 | No. | 607.50 | 153697.50 |
| Providing and fixing DCBM Stones of size 20 x 20 x 75 cm with RCC M20 Grade, filling foundation with CC (1:4:8) using 40 MSA including cost of all materials, labour, painting BM reference etc., complete with a lead upto 50 m and all lifts. IRR PMW 2-8 |
| 14 | Survey work for investigation of Markandeya LIS | APSS | 31.90 | Km. | 2283.00 | 72827.70 |
| Conducting survey for Cross Sections at an interval of 50 m with levels taken at 5 m intervals for a length of 30/15 mt along cross section on either side, supply of cross section book neatly drawn on computer, including cost of materials, Stationery, hire charges of survey equipment, labour charges and all incidental and operational charges required to complete finished item of work as directed by the Engineer-in-charge and supply of field records. |
| 15 | Survey work for investigation of Markandeya LIS | APSS | 31.90 | Km. | 6000.00 | 191400.00 |
| Carrying of DCBM value from G.T.S Bench mark to project site along the Main canal/Major Distributories at an interval of 500m and at structure locations by conducting levelling and writing the values on RCC stone including cost and conveyance of materials, painting and all other materials, hire charges of survey equipment, LF books and all operations required to carryout the finished item of work as directed by the Executive Engineer and supply of recorded LF books. |
| 16 | Survey work for investigation of Markandeya LIS | APSS | 31.90 | Km. | 2283.00 | 72827.70 |
| Conducting survey for Logitudinal Sections at an interval of 25 m, supply of plans neatly drawn on computer, including cost of materials, stationery, hire charges of survey equipments, labour charges and all incidental and operational charges required to complete finished item of work as directed by the Engineer-in-charge and supply of field records. |
| 17 | Survey work for investigation of Markandeya LIS | APSS | 31.90 | Km. | 2283.00 | 72827.70 |
| Conducting Chain and Prismatic survey of Main Canal and Major Distributaries including alternatives for finalizing the Alignment as directed by the Engineer - in - Incharge including cost and conveyance of all materials, stationary,Hire charges of survey equipment , labour and hire charges of jeep etc and supply of field records. |
| 18 | Survey work for investigation of Markandeya LIS | APSS | 320.00 | Ha | 270.83 | 86665.60 |
| Reconnaissance survey of all the proposals ,drawing the proposals on topo sheets and field verification etc. as per standard specifications including labour charges, cost of materials all incidental, operational charges required to complete finished item of work as directed by the Engineer-in-charge. |