Vgtps - Calibration Of Instruments , Regular And Breakdown Maintenance Of C And I Calibration Of Instruments , Regular And Breakdown Maintenance Of C And I Instruments And Equipments At Vgtps Phase-I For The Period From 01 . 04 . 2020 To 30 . 09 . 2020 . - 2 Calibration Of Instruments: Calibration Of Pressure, Temperature And Level Gauges 3 Calibration Of Instruments: Calibration Of Pressure, Temperature, Level And Flow Transmitters And Switches, Ph, Conductivity Transmitters, Rtd, Thermocouples, On / Off Solenoid Valves 4 Calibration Of Instruments: Calibration Of Pneumatic Control Valves Operated By I / P Positioners, Smart Positioners And Hydraulic Valves Operated By I / H Converters And Lvdts, Calibration Of Cems Analyzer 5 Daily Walk Down Work: Daily Walk Down And Visual Inspection Of Field Instruments 6 Instruments Cleaning And Terminal Tightness Checking Work:Cleaning And Terminal Tightness Checking Of Pressure / Temperature / Flow / Level Transmitters, Switches, Signal Conditioners & Sensors, Junction Boxes, On / Off Valve Actuators, Impulse Line Flushing And Leak Attending Work 7 Instruments Cleaning And Terminal Tightness Checking Work:Cleaning, Terminal Tightness Checking And Leakage Arresting Of Pressure / Temperature Gauges Thermocouples, Rtd, Sov And Limit Switches, Swas & Cems Equipment. 8 Instruments Cleaning And Terminal Tightness Checking Work:Control Valve Positioner / Air Filter Regulator / Airlock Relay / Volume Booster Etc. Cleaning And Leak Attending Work 9 Dcs, Plc Modules And Servers Cleaning Works:Gt Mark V, Stg, Bop, Gbc Pro Control P13 Dcs, Dm Plant Ge Fanuc Plc Modules Cleaning And Terminal Tightness Checking Work 10 Dcs, Plc Modules And Servers Cleaning Works: Other Plc In Ia / Pa, N2 System, Apu, Air Intake, Dm Plant, Pretreatment Plant, Bentley Nevada Module / Panel Cleaning & Terminal Tightness Checking Work 11 Dcs, Plc Modules And Servers Cleaning Works: :Gt, Stg, Dm Plant Ows & Server System Cleaning Work. 12 Gtg & Stg Start-Up: Gtg & Stg Startup Activities 13 Break Down Maintenance / Replacement / Releasing And Re-Fixing Of Field Instruments:Replacement / Releasing And Re-Fixing Of Pressure / Temperature / Flow / Level Transmitters & Switches And Other Field Instruments Etc. For Defect And Mechanical Co-Ordination Work 14 Break Down Maintenance / Replacement / Releasing And Re-Fixing Of Field Instruments:Replacement / Releasing And Re-Fixing Of Field Instruments Such As Gauges, Rtd, Thermocouple, Manifolds And Impulse Line Except Turbine Area. 15 Break Down Maintenance / Replacement / Releasing And Re-Fixing Of Field Instruments: Replacement / Releasing And Re-Fixing Of On / Off Valves / Actuators, Limit Switches, Pilot Actuators, Air Regulators, O-Ring And Gaskets Etc. For Defect And Mechanical Co-Ordination 16 Break Down Maintenance / Replacement / Releasing And Re-Fixing Of Field Instruments: Replacement / Releasing And Re-Fixing Of Pneumatic Control Valves Positioner, Position Transmitter, Airlock Relay, Volume Booster, Limit Switches, Vibration Sensors, Speed Sensors, Thermocouples / Rtds And Special Type Of Instruments In Gas And Steam Turbine Area For Defect And Other Mechanical Co-Ordination Work 17 Break Down Maintenance / Replacement / Releasing And Re-Fixing Of Field Instruments:Assistantship In Dcs Control Loop Checking Of Signals And Cable Healthiness Checking, Spare Cable Tracing Etc. And Electrical Co-Ordination Work 18 Break Down Maintenance / Replacement / Releasing And Re-Fixing Of Field Instruments: Replacement / Healthiness Checking Of Abb Pro Control P13 Dcs / Mark V, Ge Fanuc Plc Modules & Other Plc Cards. 19 Break Down Maintenance / Replacement / Releasing And Re-Fixing Of Field Instruments:Functional Checking Of Pressure / Temperature Transmitters / Switches / Rtd / Thermocouple / Flame Scanner, Transducers, And Operational Checking Of Limit Switches, Pneumatic Control Valves Etc. With Dcs 20 Break Down Maintenance / Replacement / Releasing And Re-Fixing Of Field Instruments: Assistantship In Check Measurement Of New Materials