Consultancy Services For Preparation Of Detailed Project Report And Providing Pre-Construction Activities For Construction Of Highway Tunnel Including Approaches Across Shinkun La , Tanglang La And Lachalung La In The Union Territory Of Ladakh , schedule a ( fixed lumpsum cost ) , remuneration for local/ expatriate staff ( including per diem allowance ) , a . key professionals , team leader cum senior tunnel engineer ( 1 no ) , tunnel design expert ( 1 no ) , senior ventilation & fire safety expert ( 1 no ) , senior geotechnical engineer ( 1 no ) , directional coring expert ( 1 no ) , b . other professionals , senior e& m engineer , senior geologist , senior surveyor engineer ( 2 nos . ) , environmental engineer , material engineer , highway cum pavement engineer , quantity surveyor/documentation officer , sub-professional staff: ( to be assessed by consultant as per requirement of assignment , minimum 6 to be deployed ) , tbn , tbn , tbn , tbn , tbn , tbn , tbn , tbn , tbn , support staff ( fixed rates ) , office manager ( 1 nos . ) , typist ( 2 nos . ) , office boy ( 2 nos . ) , night watchman ( 2 nos . ) , transportation ( fixed costs ) , the vehicles hired by the consultants shall include the cost for rental , drivers , operation , maintenance , repairs , insurance , etc . for use of consultants ( 3 vehicle for 8 month each ) , duty travel to site ( fixed costs ) , trips , office rent ( fixed costs ) , the rent cost includes operation & maintenance , cleaning , repairs , etc for entire duration of services . , office supplies , utilities and communication ( fixed costs ) , office supplies , drafting supplies , computer running costs , domestic and international communication , office furniture and equipment ( fixed costs ) , office furniture and equipment , reports and document ( for all three tunnel dprs ) , monthly report , inception report & qap , environment and social impact screening report , draft feasibility report , final feasibility report , strip plan with l . a . reports , draft la and clearances i report , final la and clearances i report , draft environmental assessment report & rap , final environmental assessment report & rap , draft detailed design report & drawings etc . , draft emp , draft bidding documents , final detailed project report with bill of quantities , cost estimates , updated drawings etc . , final emp , final bidding documents , draft 3 ( a ) , 3 ( a ) and 3 ( d ) notification for land acquisition ( 3 copies each ) , la & clearances ii report , survey and investigation , a . topographical survey ( fixed rate ) , complete topographic survey using mobile/ aerial lidar or equivalent technology for project approach area including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc . inclusive of cost of materials , labourer , preparation of drawings and their submission as per contract provision . , b . investigation ( fixed cost ) , all investigations/surveys including material survey and investigation , sub-grade investigation , traffic survey , socio-economic & census survey / studies . , schedule b ( item rate costs ) , directional coring , sub-soil investigation & other works , sub-soil investigation for shinkun la tunnel , boring , a ) boring in all type of soils ( other than hard rock ) , b ) boring in hard rock , directional coring in any length along the proposed directional coring trajectory ( corehole size nq ) . the rate includes transportation of all plant , manpower , drilling accessories , sampling equipment work site , erection on site for horizontal directional coring ( soil drilling testing and rock coring ) , trial pit , hand auguring , reinstatement of borehole etc including grouting in zones of weakness , inclined soil , artificial hard material or boulder drilling and directional coring in rock arterial hard material or boulder from the launch site at ground level to the commencement of the hdc trajectory . , not exceeding 100m in length from chainage 0 . 000 ( i . e . commencement of hdc trajectory ) in rock , exceeding 100m in length but not exceeding 200m length in rock , exceeding 200m in length but not exceeding 300m length in rock , exceeding 300m in length but not exceeding 400m length in rock , exceeding 400m in length but not exceeding 500m length in rock , exceeding 500m in length but not exceeding 600m length in rock , exceeding 600m in length but not exceeding 700m length in rock , exceeding 700m in length but not exceeding 800m length in rock , exceeding 800m in length but not exceeding 900m length in rock , exceeding 900m in length but not exceeding 1000m length in rock , cost of supply and fixing boundary pillars , procuring and fixing boundary pillars and its installation , complete in all respect as per irc:25 , 1967: consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project highway at 50 m interval . , land acquisition team including support staff and logistics/transportation , a . land acquisition team including support staff , ex-land revenue inspector/officer or equivalent , ex-kanoogo/ girdwar orequivalent , ex-patwari or equivalent , typist ( 2 nos ) , peon , a . logistics for land acquisition team , computer including necessary peripherals ( 2 nos ) , printers ( 2 nos ) , vehicles ( bolero or equivalent ) with monthly running limit of 4000 km