Erection And Servicing Of Earth Pits And Post Top Led Lights In Ph-I Area , Erection And Servicing Of Earth Pits , Supply Of Materials For Pipe Earthing With All Accessories As Per Is 3043 Such As , Gi Pipe , Gi Nuts , Bolts And Washers , Earth Strips For Connecting The Cables , Funnel , M-Sand Etc , Supply Of Outdoor Post-Top Non Corrosive Ip 65 Luminaries With Led Light Source Having > 2500 Lumen Light Output . The Lamp Holder Shall Be B 22 / E 27 Type . , Supply Of 50 Mm Class B Gi Pipe , Supply Of Electrical Junction Boxes Of Size Not Less Than 140 X 140 X95 Mm With 16A Fuse/ 6A Mcb And Suitable Porcelain Cable Connectors . Make Sintex Gs-Jb- 1414 Or Equivalent . , Excavation Of Earth Pit , Refilling With Charcoal & M-Sand , Construction Of Inspection Chamber With Rcc Cover Slab Etc . , Materials Required For The Constructions Of Inspection Chambers Such As Cement , M-Sand , Brick Etc And All Other Accessories Required For The Completion Of Work Shall Be Supplied By The Contractor . Installation , Testing And Commissioning Are In The Scope Of Contractor . , Excavation Of Trench At A Depth Not Less Than 50 Cms For Laying Earth Cables . The Work Includes Removal Of Soil From The Trench And Filling Back The Trench With Soil And Consolidating It To The Original Level After Laying The Cable . , Excavation Of Trench At A Depth Not Less Than 60 Cms For Laying Power Cables . The Work Includes Removal Of Soil From The Trench , Covering The Newly Laid Cable Using Country Bricks And Filling Back The Trench With Soil And Consolidating It To The Original Level After Laying The Cable . , Laying Of 185/240 Sq . Mm Pvc Insulated Al . Cable For Interlinking The Earth Pits And From Switch Board To Earth Pits Through Trenches/Concrete Floors . Cable Will Be Supplied By Fact Free Of Cost . , Termination Of Earth Cables . The Work Includes Termination Of Earth Cables At Switch Board End And At Earth Pits Using Aluminium Sockets Of Proper Size . The Scope Of Work Includes Supply Of Crimbing Type Cable Lugs , Gi Nuts , Bolts And Washers Etc . And Drilling Holes On The Gi Strips . After Terminating The Cables At Earth Pit , The Surface Shall Be Covered With Bitumen . , Laying New Cable For Garden Lighting . Scope Of Work Includes Laying Of 3X 2 . 5/5 X 2 . 5 Sq . Mm Cables In Excavated Trenches , Clamping Cables On Wall /Light Posts . The Cable Required For The Work Will Be Supplied By Fact Free Of Cost . , Installation Of Lamp Posts . The Work Includes Cutting The Gi Pipes To A Length Of 2 . 5 Meters , Fixing The Same By Concreting The Bases ( 300Mm X 300Mm X300 Mm ) Upto Ground Level And Then Brick Work ( 300Mm X 300Mm X300 Mm ) Above The Concrete Base And Should Be Plastered . Suitable Webs Shall Be Welded At The Bottom Of The Pipe Before Erction . Provision Should Be Made On The Brick Work For Inserting The Junction Box And Entry Of Incomer Cables And Cables To Light Fitting . The Work Also Includes Drilling Suitable Holes On The Pipe For Cable Entry And For Mounting The Fitting . The Footing Above The Ground Level Shall Be Neatly Painted With Blue And White Emulsion Paint And The Lamp Post Shall Be Neatly Painted With Two Coats Of Metallic Paint As Suggested By The Engineeer In Charge . All The Materials Such As Reducers For Fixing The Light Fitting , Paint , Primer , M-Sand , Brick , Coarse Aggregate ( 20Mm ) Shall Be Supplied By The Contractor . , Termination Of 3 X 2 . 5/5X 2 . 5 Sq . Mm Cable . The Work Includes Installation Of140 X 140 X95 Mm Smc Junction Box On Brick Footing , Glanding And Termination Of 3 X 2 . 5/5X 2 . 5 Sq . Mm Cable At Junction Box . Pocelain Connectors Shall Be Used For Linking Cables In Junction Boxes . All The Materials Such As Cable Glands , Cable Lugs , Clamps , Porcelain Connectors , Nuts And Bolts Required For The Work Shall Be Supplied By The Contractor . , Installation And Commissioning Of Garden Lights . The Work Includes Fixing Garden Light Fittings On The Posts , Wiring Upto The Junction Boxes Using 3 X 1 . 5 Sq . Mm Workshop Flex And Commissioning . Nuts , Bolts And Washers , Porcelain Connectors , Work Shop Flex Required For The Work Shall Be Supplied By The Contractor .