}

Supply , Installation , Testing And Commissioning Of Lab Equipment For The Department Of Electrical Engineering, GKCIET, P.O. Narayanpur, Dist. Malda-West Bengal

Institute Of Engineering And Technology has published Supply , Installation , Testing And Commissioning Of Lab Equipment For The Department Of Electrical Engineering. Submission Date for this Tender is 17-02-2020. Laboratory Equipment Tenders in GKCIET, P.O. Narayanpur, Dist. Malda West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

23546112
Supply , Installation , Testing And Commissioning Of Lab Equipment For The Department Of Electrical Engineering
Open Tender
NCB
West Bengal
Gkciet, P.O. Narayanpur, Dist. Malda
17-02-2020

Tender Details

Supply , Installation , Testing And Commissioning Of Lab Equipment For The Department Of Electrical Engineering - 1 Calibration Of Ammeter And Wattmeter 2 Calibration Of Ammeter And Wattmeter 3 Demonstration Of Three Phase Transformer Connections. Voltage And Current Relationship, Phase Shifts Between The Primary And Secondary Side 4 3 Single Ph Transformer For Vector Group Testing Dy1, Dy11, Yy0, Dz0, Dz6 Connection 5 Demonstration Of Components Of Lt Switch 6 1-10Kw Lt Switchgear Panel Mounted Setup For Handson Practice Of Switchgear Connection 7 Frequency Meter, Ph Sequency Meter , Power Factor Meter 8 Frequency Meter, Ph Sequency Meter , Power Factor Meter 9 Measurement Of Capacitance By Schering Bridge 10 Measurement Of Capacitance By Schering Bridge 11 Measurement Of Speed Of Dc Series Motor As A Function Of Load Torque 12 Dc Series Motor Drum Controler Setup With Loading Arrangment 13 V / F Control Of3 Ph Induction Motor 14 V / F Control Of3 Ph Induction Motor 15 Parallel Operation Of Two Three Ph Transformers 16 Parallel Operation Of Two Three Ph Transformers 17 Determination Of Xd, Xq Of A Salient Pole 3 Ph Synchronous Machine 18 Determination Of Xd, Xq Of A Salient Pole 3 Ph Synchronous Machine 19 Parallel Operation Of Two Three Ph Alternator 20 Parallel Operation Of Two Three Ph Alternator 21 Different Parameter Calculation By Power Cycle Diagram 22 Different Parameter Calculation By Power Cycle Diagram 23 Study Of Different Type Of Cable 24 A Demonestration Board With Single Core, 3 Core Stranded, Nonstranded Acsr, Al, Cu, Conducters Used For Transmission And Distribussion 25 Study Of The Characteristics Of On- Delay Relay And Off-Delay Relay 26 Study Of The Characteristics Of On- Delay Relay And Off-Delay Relay 27 Test To Find Out Characteristics Of ( A ) Under Voltage Relay ( B ) Earth Fault Relay 28 Test To Find Out Characteristics Of ( A ) Under Voltage Relay ( B ) Earth Fault Relay 29 Study Of The Characteristics Of An Scr 30 Scr Trainer Kit 31 Study Of The Characteristics Of A Triac 32 Triac Trainer Kit 33 Study Of Different Triggering Circuits Of An Scr 34 Complete Setup For Scr Triggering Circuit Trainer Kit ( To Perform I ) Forward Voltage Triggering. Ii ) Gate Triggering Iii ) Dv / Dt Triggering Iv ) Temperature Triggering V ) Light Triggering ) 35 Study Of Firing Circuits Suitable For Triggering Scr In A Single Phase Full Controlled Bridge 36 Complete Setup For Scr Triggering Circuit In A Single Phase Full Control Bridge Trainer Kit 37 Study Of The Operation Of A Single Phase Full Controlled Bridge Converter With R And R-L Load. 38 Complete Setup For Scr Triggering Circuit In A Single Phase Full Control Bridge With R And R L Load Trainer Kit 39 Study Of Performance Of Single Phase Half Controlled Symmetrical And Asymmetrical Bridge Converters 40 Complete Setup For Study Of Performance Of Single Phase Half Controlled Symmetrical And Asymmetrical Bridge Converters-Trainer Kit 41 Single Ph Universal Motor Control Using Diac, Triac 42 Single Ph Universal Motor Control Using Diac, Triac 43 Study Of Performance Of Step Down Chopper With R And R-L Load, Motor Speed Control 44 Complete Setup For Study Of Performance Of Step Down Chopper With R And R-L Load 45 Tuning Of P, Pi And Pid Controller For First Order Plant With Dead Time Using Z-N Method. Process Parameters ( Time Constant And Delay / Lag ) Will Be Provided. The Gain Of The Controller To Be Computed By Using Z-N Method. Steady State And Transient Performance Of The Closed Loop Plant To Be Noted With And Without Steady Disturbances. The Theoretical Phase Margin And Gain Margin To Be Calculated Manually For Each Gain Setting 46 Tuning Of P, Pi And Pid Controller For First Order Plant With Dead Time Using Z-N Method. Process Parameters ( Time Constant And Delay / Lag ) Will Be Provided. The Gain Of The Controller To Be Computed By Using Z-N Method. Steady State And Transient Performance Of The Closed Loop Plant To Be Noted With And Without Steady Disturbances. The Theoretical Phase Margin And Gain Margin To Be Calculated Manually For Each Gain Setting 47 To Plot The Characteristics Of Ujt 48 To Plot The Characteristics Of Ujt 49 To Measure Low Resistance By Kelvin’S Double Bridge 50 To Measure Low Resistance By Kelvin’S Double Bridge 51 To Measure Power Factor Of Single Phase And Three Phase Load By Pf Meter And Verify The Same Through I, V And P Measurement 52 To Measure Power Factor Of Single Phase And Three Phase Load By Pf Meter And Verify The Same Through I, V And P Measurement 53 To Measure Current & Voltages By Low Range Ammeter & Voltmeter Respectively Using Ct And Pt 54 To Measure Current & Voltages By Low Range Ammeter & Voltmeter Respectively Using Ct And Pt 55 To Mount And Wire Up The Main Board By Batten / Conduit Wiring And Connect Energy Meter, Mcb, Elcb, Rccb Etc. As Per Ie Rule 56 To Mount And Wire Up The Main Board By Batten / Conduit Wiring And Connect Energy Meter, Mcb, Elcb, Rccb Etc. As Per Ie Rule 57 To Test A Battery For Its Charged And Discharged Condition And To Make Connections For Charging And Obtain Its Capacity 58 To Test A Battery For Its Charged And Discharged Condition And To Make Connections For Charging And Obtain Its Capacity 59 To Start A 3-Phase Slip-Ring Induction Motor By Rotor Resistance Starter And Determine The Effect Of The Rotor Resistance On The Torque-Speed Curves Of An Induction Motor 60 To Start A 3-Phase Slip-Ring Induction Motor By Rotor Resistance Starter And Determine The Effect Of The Rotor Resistance On The Torque-Speed Curves Of An Induction Motor 61 To Measure Temperature By Pt-100, Thermistor And Thermocouple Along With Simple Resistance Bridge 62 To Measure Temperature By Pt-100, Thermistor And Thermocouple Along With Simple Resistance Bridge 63 To Plot Characteristics Of Potentiometer And Observe The Loading Effect On Output Of Potentiometer 64 To Plot Characteristics Of Potentiometer And Observe The Loading Effect On Output Of Potentiometer 65 To Study The Principle Of Operation And Connection Of Pilot Devices Like – Push Button Switch, Limit Switch, Selector Switch, Pressure Switch, Float Switch 66 To Study The Principle Of Operation And Connection Of Pilot Devices Like – Push Button Switch, Limit Switch, Selector Switch, Pressure Switch, Float Switch 67 To Study Open Loop Control Of Any Physical Control System And Study Of Closed Loop Control Of The Same System Using P, Pi And Pid Controller 68 To Study Open Loop Control Of Any Physical Control System And Study Of Closed Loop Control Of The Same System Using P, Pi And Pid Controller 69 To Study The Position Control System Using Servomotor 70 To Study The Position Control System Using Servomotor 71 To Demonstrate Various System Faults By D.C. Network Analyzer 72 To Demonstrate Various System Faults By D.C. Network Analyzer 73 To Study Active And Reactive Power Flow Through Transmission Lines 74 To Study Active And Reactive Power Flow Through Transmission Lines 75 To Measure Solar Radiation With The Help Of Pyranometer 76 To Measure Solar Radiation With The Help Of Pyranometer 77 To Study Different Kinds Of Insulators ( Insulators Are Required To Be Available In Laboratory 78 Demonstration Board Displaying Available Types Of Insulators ( A, E, B, F, H, C Class 79 To Study Pilc, Pvc, Frls And Xlpe Cables. ( Cables Are Required To Be Available In Laboratory ) 80 To Study Pilc, Pvc, Frls And Xlpe Cables. ( Cables Are Required To Be Available In Laboratory ) 81 To Demonstrate The Photo Voltaic System Used In Street Lighting – Pv Module, Ccu, Battery, Cfl 82 To Demonstrate The Photo Voltaic System Used In Street Lighting – Pv Module, Ccu, Battery, Cfl 83 To Identify The Terminals Of Thyristor And Plot V-I Characteristics Of Thyristor 84 To Identify The Terminals Of Thyristor And Plot V-I Characteristics Of Thyristor 85 To Study Fully Controlled Full Wave Rectifier Using Scr 86 Kit Type Fully Controlled Bridge Rectifier Using Scr 87 To Study Dc Chopper Circuit Using Scr 88 To Study Dc Chopper Circuit Using Scr 89 To Study Series Inverter Using Scr 90 Series Inverter Using Scr Kit 91 To Perform Speed Control Of Dc Series Motor Using Scr 92 To Perform Speed Control Of Dc Series Motor Using Scr 93 To Perform Speed Control Of 3-Phase Induction Motor Using Pwm Inverter. Interpret Speed-Torque Characteristics. Use Variable Voltage Variable Frequency Drive 94 To Perform Speed Control Of 3-Phase Induction Motor Using Pwm Inverter. Interpret Speed-Torque Characteristics. Use Variable Voltage Variable Frequency Drive 95 To Study The Operation And Circuit Diagram Of Uninterrupted Power Supply Unit 96 To Study The Operation And Circuit Diagram Of Uninterrupted Power Supply Unit 97 Operation Of A Stepper Motor With A Fixed Number Of Steps And To Determine The Angular Displacement Per Step By Measuring The Total Angular Rotation 98 Operation Of A Stepper Motor With A Fixed Number Of Steps And To Determine The Angular Displacement Per Step By Measuring The Total Angular Rotation 99 To Determine Illumination Of A Surface For A Drawing Room By Means Of Lux Meter 100 To Determine Illumination Of A Surface For A Drawing Room By Means Of Lux Meter 101 To Determine Candle Power Of A Lamp In Comparison To Standard C.P. Of Lamp By Optical Bench Method. 102 To Determine Candle Power Of A Lamp In Comparison To Standard C.P. Of Lamp By Optical Bench Method. 103 To Study Of The Principle Of Induction Heating Using An Induction Heater 104 Induction Heating Study Kit 105 To Make & Test The Control Circuit For Dynamic Braking Operation Of Induction Motor Using Contactor Control 106 To Make & Test The Control Circuit For Dynamic Braking Operation Of Induction Motor Using Contactor Control 107 To Make & Test The Working Of Single Phase Preventer Using Contactor Control 108 To Make & Test The Working Of Single Phase Preventer Using Contactor Contro 109 To Make & Test The Control Circuit Operation Of Automatic Star-Delta Starter Of Induction Motor Using Plc 110 Plc Unit ( Seimens ) To Demonstrate Star Delta Starter Operation 111 Digital Storage Oscilloscope 112 Digital Storage Oscilloscope 113 Multimeters 114 Multimeters 115 Universal Programmer 116 Universal Programmer 117 Pic Microcontrollers 118 Pic Microcontrollers 119 Arduino Microcontrollers 120 Arduino Microcontrollers 121 Relays 122 Relays 123 Solar Panels 124 Solar Panels 125 Dc Motors 126 Dc Motors 127 Demonestration Kit Of Network Therem For Thevenins, Nortons, Maximum Power Transfer Ans Super Position Theorem 128 Demonestration Kit Of Network Therem For Thevenins, Nortons, Maximum Power Transfer Ans Super Position Theorem 129 To Measure Active And Reactive Power In Three Phase Balanced Load By Two Wattmeter Method And Observe The Effect Of Power Factor Variation On Wattmeter Reading 130 To Measure Active And Reactive Power In Three Phase Balanced Load By Two Wattmeter Method And Observe The Effect Of Power Factor Variation On Wattmeter Reading 131 To Measure An Inductance By Maxwell’S Bridge 132 To Measure An Inductance By Maxwell’S Bridge

Key Value

Document Fees
INR 1000 /-
EMD
INR 50000.0 /-
Tender Value
INR 25 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail