}

Evaluation Of Structural Soundness Of Existing Buildings/ Structures Of Power And Utility Department Of Nrl, Numaligarh Refinery Limited-Assam

Numaligarh Refinery Limited has published Evaluation Of Structural Soundness Of Existing Buildings/ Structures Of Power And Utility Department Of Nrl. Submission Date for this Tender is 19-02-2020. Cooling Tower Tenders in Numaligarh Refinery Limited Assam. Bidders can get complete Tender details and download the document.




Tender Notice

23438988
Evaluation Of Structural Soundness Of Existing Buildings/ Structures Of Power And Utility Department Of Nrl
Open Tender
Indian
Assam
Numaligarh Refinery Limited
19-02-2020

Tender Details

Evaluation Of Structural Soundness Of Existing Buildings/ Structures Of Power And Utility Department Of Nrl , Chlorinator Room Of Cooling Tower , Physical Observations Of Foundation System For Load Bearing Walls , Pile Caps , Brick Pillasters Etc . , At Critical Locations And Recording Observations And Distress Features If Any And Identifying The Same On The Drawings . , Physical Observations On All Rcc Members , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Ground Floor- Ultrasonic Pulse Velocity Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Ground Floor- Rebound Hammer Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Ground Floor- Cover Meter Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Ground Floor - Carbonation Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . First Floor - Ultrasonic Pulse Velocity Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . First Floor - Rebound Hammer Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . First Floor -Cover Meter Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . First Floor -Carbonation , Carrying Theoretical Analysis To Check The Structural Adequacy With Insitu Ndt And Physical Observations Results As Design Inputs , Designing Of Remedial Engineering Measures Based On The Outputs Of Structural Analysis And Physical Observations , As Required , Furnishing Structural Audit Report And Structural Adequacy Certificate , Cold Water Basin Of Cooling Tower , Physical Observations Of Foundation System For Load Bearing Walls , Pile Caps , Brick Pillasters Etc . , At Critical Locations And Recording Observations And Distress Features If Any And Identifying The Same On The Drawings . , Physical Observations On All Rcc Members At All Levels , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Cold Water Basin Level Plus Tie Beam Level -Ultrasonic Pulse Velocity Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Cold Water Basin Level Plus Tie Beam Level -Rebound Hammer Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Cold Water Basin Level Plus Tie Beam Level - Cover Meter Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Cold Water Basin Level Plus Tie Beam Level - Half Cell Potential Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Cold Water Basin Level Plus Tie Beam Level - Carbonation Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Fan Deck Level Plus Tie Beam Level - Ultrasonic Pulse Velocity Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Fan Deck Level Plus Tie Beam Level - Rebound Hammer Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Fan Deck Level Plus Tie Beam Level - Cover Meter Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Fan Deck Level Plus Tie Beam Level - Half Cell Potential Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Fan Deck Level Plus Tie Beam Level - Carbonation Test , Carrying Theoretical Analysis To Check The Structural Adequacy With Insitu Ndt And Physical Observations Results As Design Inputs , Designing Of Remedial Engineering Measures Based On The Outputs Of Structural Analysis And Physical Observations , As Required , Furnishing Structural Audit Report And Structural Adequacy Certificate , Dm Plant ( Sak & Shl ) , Physical Observations Of Foundation System For Load Bearing Walls , Pile Caps , Brick Pillasters Etc . , At Critical Locations And Recording Observations And Distress Features If Any And Identifying The Same On The Drawings . , Physical Observations On All Rcc Members At All Levels , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Sak -Ultrasonic Pulse Velocity Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Sak -Rebound Hammer Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Sak - Cover Meter Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Sak - Half Cell Potential Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Sak - Carbonation Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Shl- Ultrasonic Pulse Velocity Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Shl- Rebound Hammer Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Shl - Cover Meter Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Shl- Half Cell Potential Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Shl- Carbonation Test , Carrying Theoretical Analysis To Check The Structural Adequacy With Insitu Ndt And Physical Observations Results As Design Inputs , Designing Of Remedial Engineering Measures Based On The Outputs Of Structural Analysis And Physical Observations , As Required , Furnishing Structural Audit Report And Structural Adequacy Certificate , Fire Water Pump House , Physical Observations Of Foundation System For Load Bearing Walls , Pile Caps , Brick Pillasters Etc . , At Critical Locations And Recording Observations And Distress Features If Any And Identifying The Same On The Drawings . , Physical Observations On All Rcc Members At All Levels , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Ground Floor- Ultrasonic Pulse Velocity Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Ground Floor- Rebound Hammer Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Ground Floor- Cover Meter Test , Carrying Out Ndt/Insitu Tests On All Rc Members At Ground And First Floor Level Selected On Criticality Basis . Ground Floor - Carbonation Test , Carrying Theoretical Analysis To Check The Structural Adequacy With Insitu Ndt And Physical Observations Results As Design Inputs , Designing Of Remedial Engineering Measures Based On The Outputs Of Structural Analysis And Physical Observations , As Required , Furnishing Structural Audit Report And Structural Adequacy Certificate , Light Wt . Roof Building- Nitrogen Plant , Physical Observations Of Foundation S

Key Value

Document Fees
Refer document
EMD
INR 26000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail