}

Tender For Civil Works For Access Control Room At Plant Gate-Unit Rate Towards All Kinds Of Soil As Per Scope Of Work. Unit Rate Towards 1:4:8 ( 1 Cement : 4 Coarse Sand : 8 Graded Stone Aggregate 40 Mm Nominal Size ) As Per Scope Of Work. Unit Ra-Odisha

Indian Rare Earths Limited has published Tender For Civil Works For Access Control Room At Plant Gate-Unit Rate Towards All Kinds Of Soil As Per Scope Of Work. Unit Rate Towards 1:4:8 ( 1 Cement : 4 Coarse Sand : 8 Graded Stone Aggregate 40 Mm Nominal Size ) As Per Scope Of Work. Unit Ra. Submission Date for this Tender is 12-02-2020. Bridge Work Tenders in Odisha. Bidders can get complete Tender details and download the document.




Tender Notice

23411667
Tender For Civil Works For Access Control Room At Plant Gate-Unit Rate Towards All Kinds Of Soil As Per Scope Of Work. Unit Rate Towards 1:4:8 ( 1 Cement : 4 Coarse Sand : 8 Graded Stone Aggregate 40 Mm Nominal Size ) As Per Scope Of Work. Unit Ra
Open Tender
Indian
Odisha
12-02-2020

Tender Details

Tender For Civil Works For Access Control Room At Plant Gate-Unit Rate Towards All Kinds Of Soil As Per Scope Of Work. Unit Rate Towards 1:4:8 ( 1 Cement : 4 Coarse Sand : 8 Graded Stone Aggregate 40 Mm Nominal Size ) As Per Scope Of Work. Unit Rate Towards Providing And Laying In Position Machine Mixed And Machine Vibrated Cement Concrete Of M20 Grade Reinforced Cement Concrete .As Per Scope Of Work. Unit Rate Towards Foundations, Footings, Bases Of Columns Etc. For Mass Concrete As Per Scope Of Work. Unit Rate Towards Columns, Pillars, Piers, Abutments, Posts And Struts.As Per Scope Of Work. Unit Rate Towards Lintels, Beams, Plinth Beams, Girders, Bressumers And Cantilevers As Per Scope Of Work. Unit Rate Towards Edges Of Slab And Breaks In Floors And Walls Under 20 Cms Wide As Per Scope Of Work. Unit Rate Towards Weather Shade, Chajjas, Corbels Etc., Including Edges As Per Scope Of Work. Unit Rate Towards Reinforcement For Rcc Work Including Supplying, Straightening, Cutting, Bending, Placing Position And Binding With 22Gauge Ms Binding Wire As Per Scope Of Work. Unit Rate Towards Brick Work With Bricks Of Minimum Crushing Strength 60 Kg / Cm2 In Foundation And Plinth Cement Mortar 1:6 ( 1 Cement : 6 Coarse Sand ) As Per Scope Of Work. Unit Rate Towards Brick Work With Bricks Of Minimum Crushing Strength 60 Kg / Cm2 In Superstructure Above Plinth Level Upto Floor V Level In Cement Mortar 1:6 ( 1 Cement : 6 Coarse Sand ) .As Per Scope Of Work. Unit Rate Towards 15 Mm Cement Plaster On Rough Side Of Single Or Half Brick Wall With A Floating Coat Of Neat Cement Of Mix 1:4 ( 1 Cement:4 Sand ) Including Cost And Conveyance Of All Materials, Labour, Scaffolding Etc. Complete As Directed By Engineerincharge At All Levels As Per Scope Of Work.

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail