Tender For Short Refit Work Package 50T Tug Sahas-1 Short Refit Work Package:- General Service. Scaffolding ( With Material ) To Be Arranged For Survey Purpose For A Total Number Of 80 Days. Quote For Services. 2 Fire Sentries With Necessary Fire Fighting Equipment, To Fight Fire Are To Be Provisioned. Quote For Services. 3 Cleaning Of All Tanks And Provide Gas Free Certificate. The Vendor Is To Be Provide All Consumables Required For Cleaning. Repair Plating, Structures And Fittings Of Water Ballast Tank And Fresh Water Tank As Per Survey Report. Damaged Area To Be Blasted Up To Bare Metal And Recoated As Per Existing Paint Scheme. Quote For Services. 4 Degutting & Regutting – Removal And Refiting Of Panels ( Approx 30 Sqm ) And Pipes. Quote For Both Services And Material. 5 Carry Out Non-Destructive Testing For Bollards, Fairleads And Hull Structure Including Stiffening Members In The Vicinity. ( A ) Survey To Be Done In Presence Of Nsry / Fab Survey Teams And Survey Reports To Be Provided. ( B ) Requirement To Undertake Renewal Of Structures, Based On Survey Report, To Be Included In Sow. Quote For Services And Material. 6 Testing Of Wt Compartment. All Tanks, Cofferdams And Sea Tubes Which Have Been Repaired By Build-Up / Renewal Or Have Been Subjected To Hot Work Through Welding Of Pad Piece / Foundation On Any Of Their Boundaries, Are To Be Air Pressure Tested. The Pressure Applied Should Never Exceed That Which Corresponds To A Pressure Of 0.2 Kh / Cm2 ( 02 Mtr Of Water Or 0.2 Bars Or 2 1 / 2 Ibf / In2 ) . Ballast Tank - Qty 03 , Fuel Tank – Qty 05, Fw Tank – Qty 02, Misc Tank - 04. Clearance Of Areas, Subject To Apt Will Be Accorded By Nsry / Fab Survey Team. Quote For Services . 7 Mast And Riggings. ( A ) Examine Mast Structure, Whip Aerial Platforms And The Surrounding Structure On Deck, Eye Plates, Load Carrying Members, For Signs Of Corrosion. Examine Bolted, Riveted And Intermittent Welded Structure Connections For Signs Of Fracture. Portable And Semi Portable Fittings To Be Removed For Closer Examination Of Structure Underneath. Defect To Be Rectified And Paint To Be Restored. All Marks Of Corrosion And Rust Are To Be Removed. Requirement Of Paint And Other Consumables To Be Catered For By The Vendor. Quote For Services And Material. 8 ( A ) Test All Standing & Running Riggings Fitted On Mast Structure Along With Associated Fittings. Renew All Wire Ropes And Associated Fittings As Necessary. ( B ) Carry Out Load Testing Of All Deck Eye Plates ( Qty 14 ) , Bottle Screws ( Qty 14 ) And Provide Load Test Certificate. Damaged Eye Plates And Bottle Screws Are To Be Renewed By The Vendor, Together With Relevant Load Test Certificates / Guarantee / Warrantee. Quote For Services. 9 Steel Renewal. Any Requirement To Include Transportation Of Steel And Preparation Of The Plates, Including Shaping And Positioning At Location Has To Be Catered For By The Vendor.Quote For Services. 10 Funnel. Examine, Clean And Restore Paint Of Eye Plates And Surroundings Structure, Funnel Structure ( Internal And External ) . Portable Or Semi-Portable Fittings That Obscure Structure Are To Be Removed And To Be Recoated Before The Fittings Are Replaced. Requirement To Ensure That Damaged Areas Requiring Steel Renewal Together With Paint Renewal Will Have To Be Undertaken By The Vendor. Quote For Services And Material. 11 Accommodation And Office. Repair / Renewal Of Wooden Furniture And Wooden Fittings Including Table, Chairs And Wooden Cupboards In Compartment And Accommodation Spaces. Quote For Services And Material. 12 Repair / Renewal Of Bunks, Mess Lockers And Their Securing Arrangements. Lockers And Securing Arrangements That Are Beyond Repairs, Are To Be Replaced With Suitable Alternatives. Quote For Services And Material. 13 Repair / Renewal Of Defective Deck Covering And Renewal Of Deck Plates Underneath As Per Survey Report Of Yard. Deck Coverings Being Renewed, Should Be Those That Have Been Approved By Navy. Quote For Services And Material. 14 Anchor, Chain Cable And Cable Locker. Lay Out All Cables, Survey Cable And Shackles, Break, Clean And Grease All Joining Shackles, Strip And Grease Slip In Cable Locker. Re-Arrange Cable Length To Ensure Equality Of Wear. Re-Mark Cable Length. Examine Hull Associated Fittings. Examine All Spare Chain Cable And Fittings, Clean And Coat With Boiled Linseed Oil. Dismantle Anchor. Clean And Grease Trunion Pin And Housing. Grease To Be Used:- Lg-280 Patt.No. 0474 / 910-0502. Hydrojet Lasting Of The Anchor Chain Cable To Be Carried Out. The Machined Surfaces Of The Joints Of Lugless Joining Shackles Are To Be Examined For Corrosion And All Such Shackles Are To Be Stripped, Greased And Re-Assembled. The Anchor, Chain And Cable Locker To Be Restored To Factory Fit Functionality. Quote For Services And Material. 15 Machinery Spaces. Clean All Bilges Using Approved Chemical Method. Clean Out All Limber Holes And Drain Holes. Examine Structures Not Covered By Lagging, Paying Particular Attention To Position Where Water Is Likely To Accumulate, Junctions Of Longitudinal With Side Platings And Machinery Bearers With Bottom Plating, Horizontal Surfaces Such As Tank Tops, Horizontal Stiffeners And Structure Obscured By Cable Plating. Portable Fittings That Obscure Structure Are To Be Removed For Examination Of Structure Behind. Carry Out Surface Preparation In Accordance With No 53 / 16 And Recoat The Damage Paint. Disposal Of Sludge ( Approx 50 Tons ) To Be Catered For By The Vendor. Consumables For Cleaning Also To Be Catered For By Vendor. Paint Scheme Restoration In All Areas As Per Existing Navy Standards. Quote For Services And Material. 16 Check The Condition Of The Vibration Mounts. Clean And Apply Necol Lacquer. Spm Readings Of Equipment Will Need To Be Certified By Nsry / Engg / Ele Teams. Vibration Damping If Not Adequate, Will Need To Be Replaced By The Vendor After Grouping Of Mounts. Certification I.R.O The Same May Be Provided. Quote For Services And Material. 17 Renew Damaged / Perished Lagging At Various Places Using Pin Method. Renew Paint Scheme Of Affected Areas Before Renewal Of Lagging. All Consumables Are To Be Catered For By The Vendor. Quote For Services And Material. 18 Capstan ( Oem - Geeta Engg ) . All Structural And Functional Defects Pertaining To Motor And Capstan Assembly To Be Rectified By The Vendor By Repairs / Renewal. Requisite Fluids To Be Positioned For Lubrication. Motor Spm Values And Power Ratings For Safe Operation To Be Proved During Trials. Offer For Trials To Ss Post Completion. 19 Anchor Windlass ( Oem - Geeta Engg ) . All Structural And Functional Defects Pertaining To Motor And Capstan Assembly To Be Rectified By The Vendor By Repairs / Renewal. Requisite Fluids To Be Positioned For Lubrication. Motor Spm Values And Power Ratings For Safe Operation. Offer For Trials To Ss Post Completion. Quote For Services And Material / Spares. 20 Renewal Of Mushroom Head With Spindle And Valves. Renewal To Also Include Safety Nets / Fasteners As Per Requirement / Joints And Gaskets. Quote For Services And Material. 21 Sewage Treatment Plant ( Oem – M / S Eva Coy N40ce ) . ( A ) Functioning Of Level Switches Of V-1 Tank. Operate All The Valves Which Have Not Been Changed From A Set Position To Prevent Jamming. Carryout De-Sludging Of V-2 Tank By Back-Flushing Line. Clean The Seawater ‘Y’ Type Strainer At The Inlet To ‘Bookcell’. Check Macerator Pump Oil Level By Removing The Pipe Plug Located On Top Of The Pump Casing. Oil To Be Renewed. Vendor To Cater For Disposal Of 5 Ton Sludge Associated With Stp System. Overhauling Of System And Auxiliaries To Be Undertaken. Qc Coverage For Overhauling To Be Provided By Nsry / Qc Team. Ber Valves / Pipes / Joints And Fittings To Be Renewed. All Fluid Replenishment To Be Undertaken As Required. ( B ) Clean Air Supply Filter / Regulator Element In Solvent By Removing The Screws That Secure The Air Chamber To The Filter Body. Drain, Inspect & Clean The ‘Bookcell’. Remove Large Deposits Of Hard Material With Diluted Hydrochloric Acid. Post Completion Of Routines, Operate System And Inspect For Leaks And Proper Cell Amperage. ( C ) Inspect The Tightness Of Belt And Check Leakage From Gland Of Discharge Pump. Repack The Gland ( If Required ) . Quote For Services And Material / Spares. 22 Macerator Pump. Carry Out The Following :- ( A ) Check To Ensure There Are No Leakages From The Main Seals. Renew Drive End Bearing And Seals If Required. ( B ) Check And Ensure That The Impeller Rotates Freely With No Vibration. ( C ) Inspect And Tighten Nuts And Bolts As Necessary. ( D ) Check Overload Units Operating Correctly. ( E ) Check All Valves For Correct Operation. ( F ) Remove Drain Plugs Provided At Each End Of The Bracket Of The Electric Motor And Allow Any Accumulated Moisture To Drain Away And Replace Plugs. Note. Replacement Of The Pump Assembly To Be Undertaken By The Vendor, If The Discharge Rate Does Not Meet Oem Designed Standards. Quote For Services And Material / Spares. 23 Clean And Lubricate All Plug Cock Valves. Lubricate Valves In Fully Opened Or Fully Closed Position Only. Quote For Services And Material. 24 ( A ) Undertake Effluent Test From Nabl Accredited Lab And Check Compliance To Marpol Norms. ( B ) Carry Out In-Situ Calibration Of Fixed H2s Sensor. Certificate Of Calibration To Be Obtained From The Oem. Date Of Calibration And Next Due Date Should Be Clearly Indicated On The Certificate. ( C ) Sewage Pollution Prevention Certificate Valid For Duration Of Five Years From A State Authorised Accredited Agencies As Specified In Mepc 115 ( 51 ) And 227 ( 64 ) For The Ship Adopted On 01 Apr 04 As Per Regulation 5 Of Revised Annex Iv Of Marpol 73 / 78 ( Ncd 3930, Issue 3, Sep 16 Is Relevant ) . Quote For Services. 25 Towing Hook With Quick Release Mechanism ( Oem - M / S Nautiluis Eng & Construction Company ) . Carry Out Load Testing Of Towing Hook And Undertake Repairs. Job Involves Serviceability Of Release Line And Repairs. Replacement Of The Towing Hook With Quick Release Mechanism To Be Undertaken If Existing Unit Exceeds Service Life / Not Functioning As Per Design. Quote For Services And Material / Spares. 26 Grease Filters Inside Exhaust Trunking In Galleys To Be Cleaned And Preserved. Renew If Defective. Quote For Services And Material. 27 Doors - Water Tight And Non-Wt Doors. Check Clips, Hinges For Looseness And Wedge Pieces For Signs Of Wear. Examine Leather Washers, Toridal Sealing Rings And Rubber Sealing. Renew Worn Out Parts And Carry Out Chalk Test Of All Wt Doors. Quote For Services And Material. 28 Scuttles & Windows. Check Hinge Fitting, Toughened Glass And Glass Rails For Looseness And Sign Of Wear / Damage. Renew Worn Out Parts As Necessary. Windows – Qty 32, Scuttles – Qty 18. Quote For Services And Material. 29 Hatch And Manholes. Survey Hatch And Manholes Covers. Remove And Clean Hatch And Tumbler Hinges & Pins. Apply Grease. Deteriorated Hatches And Manhole Covers To Be Fabricated. Securing Fasteners Wherever Damaged To Be Renewed With Stainless Steel Fasteners As Per Recommendations Of Survey Team. Carry Out Chalk Test Of All Wt Hatches And Renew Worn Out Parts As Necessary. Quote For Services And Material. 30 Ladders. Repair The Ladders With Associated Footsteps. Structural Defects In The Ladder Assembly Other Than Steps Also To Be Catered.Quote For Services And Material. 31 Single Arm Boat Davit ( Oem - Hemant Engg ) . Overhauling Of Boat Davit Along With Motor Assembly. Offer For Trials To Ss Post Completion. Structural And Functional Defects Of The Single Arm Boat Davit To Be Rectified By Repairs / Renewal Of Components. Quote For Services And Material. 32 Survey Wire Rope, Spare Gear And Other Associated Lifting Gears. Renew As Necessary. Renewal Of Wire Ropes To Be Undertaken As Per Existing Naval Guidelines. Quote For Services And Material. 33 Carry Out Load Testing With Davit Fully Rigged Up. After Completion Of Load Test, Examine The Complete Davit Structure And Associated Lifting Gears For Flaws, Distortion, Defects Etc. Flaws Must Be Examined And Repairs To Be Undertaken, Followed By Retesting. Quote For Services And Material. 34 Water Accumulation Observed On Both Side Of Foxle. Scupper System To Be Re-Positioned For Clearance Of Water Accumulation. Painting In Areas Affected By Hot-Work / Steel Renewal To Be Restored By Vendor. Quote For Services And Material. 35 02 Bullwark Doors Damaged. Hinges Corroded. To Be Renewed. Mat – Ms. Quote For Services And Material. 36 Bullwark Damaged / Deformed At Various Location. To Be Repaired / Renewed. Mat – Ms. Quote For Services And Material. 37 ( A ) Rubber Fenders On Both Side Of Tug Found Damaged / Perished. Fenders To Be Renewed. Length- 50 Mtr. ( B ) Securing Fasteners For Fenders Found Perished / Corroded. To Be Manufactured As Per Sample And Fitted Back. Note. Deformation Of Base Structure / Strengthening Members On To Which The Fenders Are Secured Are To Be Surveyed And Deformations, If Any To Be Rectified By Hotwork / Steel Renewal. Quote For Services And Material. 38 Wooden Fenders Damaged In Port And Stbd Side. To Be Renewed. Job Involves Re-Fitment Of Fenders On Ship Side. Quote For Services And Material. 39 Natural Air Vent Of All Compartments Wire Mesh Broken, Air Vent Corroded, Flaps Rubber Beading Perished. Hinges And Butterfly Nuts Corroded. To Be Renewed. Quote For Services And Material. 40 Sounding Points Of Fresh Water Tank Threads Worn Out. To Be Repaired / Renewed. Quote For Services And Material. 41 Securing Bracket Of Fire Hose Box Corroded At Multiple Locations. To Be Renewed. Quote For Services And Material. 42 Lifebuoy With Self Igniting Light And Smoke Signal ( Mob Marker ) Quick Release Type To Be Renew On Bridge Deck. Quote For Service And Mat. 43 Fibre Sheet For Weather Deck Canopy Damaged. To Be Renewed. Quote For Services And Material. 44 Platform For Head Bollard Corroded / Damaged. To Be Repaired / Renewed. Quote For Services And Material. 45 Platform For Quarterdeck Bollard Corroded / Damaged. To Be Repaired / Renewed. Mat - Wood. Quote For Services And Material. 46 ( A ) Fisherman Plate Along With Securing Pin Corroded. To Be Manufactured As Per Existing Plate And Pin ( Qty 02 ) . ( B ) Bottle Screw For Anchor Chain Stopper Corroded. To Be Renewed ( Qty 02 ) . Quote For Services And Material. 47 Life Raft Stowing Brackets ( Qty 02 ) Along With Sliding Ladder Damaged / Corroded. To Be Repaired / Renewed And Operational. Job Involves Renewal Of Life Raft Securing Straps. Quote For Services And Material. 48 Serviceability Checks Of Life-Rafts ( Qty 02 ) And Hru ( Qty 02 ) By Nabl Accredited Agency. Webbing Of Life-Raft To Be Renewed, If Damaged Beyond Repair. Quote For Services And Material. 49 Covers ( Both Compressor Safety Mesh Cover And Control Panel Cover ) For 02 Ac Compressor Units On Upper Deck Damaged / Broken. To Be Manufactured. Mat - Al Plate. Quote For Services And Material. 50 15 Cm Ms Strip On Upper Deck Wt Doors Damaged / Corroded. To Be Manufactured And Welded In-Situ. Quote For Services And Material. 51 Internal Super Structure - Repair Works To Be Under Taken On Internal Hull Structure Including Bulkhead And Fittings As Per Survey Report. Painting To Be Under Taken Post Repairs. Quote For Services And Material. 52 Refrigerator On-Board Defective. To Be Repaired / Renewed. Quote For Services And Material. 53 01 Weather Deck Locker Damaged. To Be Repaired / Renewed. Quote For Services And Material. 54 Executive Chairs Fitted At Wheel House Observed To Be Damaged. To Be Renewed. Quote For Services And Material. 55 Engine Room Blower Wire Mesh And Securing Ms Strips Broken / Corroded. To Be Renewed. Quote For Services And Material. 56 Sunmica And Wooden Beading Of Dining Hall Table Broken / Damaged. To Be Repaired / Renewed. Quote For Services And Material. 57 Canvas Covers Of Following Deck Equipment Torn / Perished. To Be Renewed. Windlass, And Control Stand, Rescue Boat, Search Light ( Qty 02 ) , Magnetic Compass, Capstan And Capstan Control, Boat Davit Motor, Me And Da Exhaust And Intake. Quote For Services And Material. 58 Anchor Cleaning Sea Water Line Chocked / Damaged. To Be Repaired / Renewed. Quote For Services And Material. 59 Mob Stand ( Qty 04 ) And Bracket Damaged. To Be Renewed. Quote For Services And Material. 60 ( A ) Foundation Of Port And Stbd Search Light Found Deteriorated. Repair To Be Carried Out. ( B ) Rotating Mechanism Of Port And Stbd Search Lights To Be Renewed. Quote For Services And Material. 61 Hull Survey. Clean All Tank Tops, Bilges Of Machinery Spaces And Other Accessible Internal Surfaces Of Underwater Hull. Damaged Area To Be Blasted And Paint To Be Restored As Per Existing Paint Scheme. Quote For Services And Material. 62 Underwater Platings. ( A ) Remove Marine Fouling From The Hull Using Hydro Jet With Maximum Pressure Not Exceeding 3000 Psi. ( B ) Areas Where Breakdown Of Abrasive Anticorrosive Paints Observed, To Be Blasted And Recoated With Full Paint Scheme. ( C ) Paint Scheme On Full Underwater Hull And Boot Top Including Wind And Water Areas I.E. Area Up To 500Mm Above Boot Top Area Is To Be Restored. ( D ) Application Of One Coat Of A / F Paint On Underwater Hull And Boot Top Area To Be Carried Out Post Adequate Surface Preparation. Quote For Services And Material. 63 Draught Marks. Draught Marks To Be Painted With Paint Scheme As Under Water Area And Top Coat To Be Painted With White Paint. ( A ) Fwd ( B ) Midship & ( C ) Aft. Renew Defective Draught Marks. Quote For Services And Material. 64 Above Water Area ( Ship Side, Superstructure And Fittings, Davit, Windlass, Capstan ) . ( A ) Clean The Hull Using Hydro Jet With Maximum Pressure Not Exceeding 3000 Psi. Damaged Area To Be Blasted Up To Bare Metal. ( B ) Carry Out Painting Of Above Water Area With High Performance ( Hpp ) Advanced Hybrid Coating System For Above Water Area ( Ship Side & Superstructure ) As Per Paint Scheme Mentioned Below:- ( I ) 02 Coats Of Primer To Achieve 80 Microns Dft. ( Ii ) 02 Coats Of Ral 7040 Colour Specification To Achieve 80 Microns Thickness. ( Iii ) Total Dft - 320 Microns. Note. Navy Approved Paint To Be Used. Requirement Of Paint, Other Consumables And Staging To Be Catered For By The Vendor. Quote For Services And Material. 65 Life Saving Appliances. ( A ) Stretcher ( Qty 01 ) For Life Saving Damaged. To Be Renewed. Size - Standard. ( B ) First Aid Box Locker Damaged At Various Location. To Be Renew And Fitted On Specific Locations. ( Oem - M / S Godrej & Boyce Mfg Co Ltd. ) . ( C ) Life Jacket With Light And Whistle Damaged ( Qty 19 ) . To Be Renewed As Per ( Lsa Code Msc 207 ( 81 ) ) . Testing Of Life Jackets To Be Carried Out. Quote For Service And Material. 66 Water Filter Cum Purifier Defective / Damaged In Crew Dining Hall. To Be Renewed. Job Involves Fitment. Quote For Services And Material. 67 Following Defective Wc And Bathroom Accessories To Be Renewed. ( A ) Shower - 05, ( B ) Water Tap - 06, ( C ) Urinal With Full Fittings And Accessories - 03, ( D ) Commode With Full Fittings And Accessories - 04, ( E ) Two Way Basin / Sink - 04. Note. Defective Valves And Reducers, To Be Renewed. Quote For Services And Material. 68 Carryout Chemical Cleaning Of All Trunkings. Renew Perished / Damaged Trunkings On Upper Deck And Mess. Paint To Be Restored Post Repairs As Per Existing Paint Scheme ( Qty - 80 Sqm ) . Quote For Services And Material. 69 Hose Box Damaged / Broken At Various Location ( Qty 07 ) . Securing Brackets Corroded. To Be Manufactured And Refitted In-Situ. Mat - Grp. Quote For Services And Material. 70 Weather Deck & Bridge Top Deck Corroded / Undulation At Various Location. Hydro Blasting To Be Under Taken Prior Survey. Defects To Be Rectified As Per Survey Report Of Yard. ( A ) Aarea To Be Painted With High Performance Non- Skid Coating System For Weather Decks ( Hpp ) Paint Scheme As Mentioned Below Post Defect Rectification And Plate Renewal As Per Survey Report. ( B ) 07 Years Guarantee Paint Scheme Of Da Grey Colour To Be Used. ( C ) Navy Approved Paint Scheme To Be Used. ( D ) Paint Scheme Of Weather Deck And Platforms:- ( I ) 01 Coat Primer Coat - Dft 50 Microns. ( Ii ) 01Coat Anti Corrosive Intermediate Coat - Dft 200 Microns. ( Iii ) 01 Coat Non-Skid Top Coat - Dft - 800 Micron. ( Iv ) Total Dft - 1050 Microns. Note. Paint To Be Restored As Per Paint Scheme Post Repair And Inspection. Paint To Be Provided By Refitting Firm.Quote For Services And Material. 71 Combing Around Wheel House Deck Corroded / Damaged. To Be Repaired / Renewed In Situ. Mat - Ms Quote For Services And Material. 72 Panelling Damaged / Corroded At Various Location. To Be Renewed. Mat - Ss. Job Involves Removal Of Existing Panels And Fitment. Quote For Services And Material. 73 02 Mooring Rope Reel, 01 Towing Rope Reel And 01 Cable Reel Broken. To Be Manufactured And Replaced In-Situ. Job Involves Welding And Cutting Assistance And Fitment. Quote For Services And Material. 74 ( A ) Ships Name Box Along With Lighting Arrangement Defective. To Be Renewed. Mat - Ms ( Qty – 02 ) . ( B ) Ships Name Board On Port And Stbd Side To Be Renewed. Mat - Wood ( Qty – 02 ) . Quote For Services And Material. 75 Microtech Damaged At Various Location. Removal Of Old Microtech To Be Undertaken. Surface Preparation To Be Carried Out For Hull Survey. Defects To Be Rectified As Per Survey Report Of Yard. Microtech To Be Renewed Post Application Of Primer On Deck. Quote For Services And Material. 76 Dado Area In Wet Compartment Corroded / Damaged. To Be Repaired / Renewed. Job Involves Removing Of Gutting Degutting Of Panels. Quote For Services And Material. 77 Heavy Duty Tyre Fenders Of Barge Found Damaged. Renewal Of Fenders To Be Carried Out. Hot Work Required For Removal And Fitment Of Tyre Fenders To Be Carried Out ( Qty -20 ) With 60 Eye Pads And 16 Mm Galvanised Chain Along With D Shackle. Undertake Apt Of Hot Work Tanks If Any. New Heavy Duty Tyre Fenders To Be Provided By Firm. Quote For Services And Material. 78 Wire Mesh And Ball Valve Of Air Vent On Upper Decks Be Replaced If Required. Structural Defects On Air Vents To Be Repaired. Quote For Services And Material. 79 Strip, Clean And Overhaul Domestic Fresh Water System Valves, Stop Cock ( Qty 05 ) , Basin Beep Cock ( Pillar ) ( Qty 04 ) , Sink Beep Cock ( Pillar ) ( Qty 01 ) . Mat - Brass ( Chrome Plated ) . Quote For Services And Material. 80 ( A ) Ventilation Flaps Of All Compartments, Wire Mesh Broken, Air Vent Corroded, Flaps Rubber Beading Perished, Hinges And Butterfly Nuts Corroded, Ventilation Lowers Damaged / Corroded. To Be Renewed ( Qty 16 ) . ( B ) Punka Lowers Damaged At Various Trunkings. To Be Renewed And Fitted. Material To Be Provided By Firm ( Qty - 05 ) . Quote For Services And Material. 81 Cathodic Protection Sacrificial Anodes-Renew Sacrificial Anodes Fitted To Under Water Hull, Voith Blade, Rope Guard, Shaft Tunnel, Stern Tubes, Inlet And Outlets, Seachest, Biges And Cofferdams. 82 Enginering Dl: ( Port And Stbd Main Engine, Wartsilla, Model : 8L-26 2000H ) :- Carry Out 2000 Hourly Routine Of Main Engine :- ( A ) Check Engine Oil Leakage, Fixation Of Piping, Cables And Wring Rectify Leakage And Loose Cable Connection. N ( B ) Check Engine On Bolt Connection, Repair Loose Bolts. N ( C ) Check Engine Drain Points Of Charge Air Receiver And Possible Water. N ( D ) Check Oil Level, Charge Oil If Required. N ( E ) Check Foundation Bolt And Chocks. Repair If Required. N ( F ) Renew Fuel And Lub Oil Filter. N ( G ) Clean Centrifugal Filer. N ( H ) Drain Starting Air Vessels And Air Treatment Units. N ( J ) Servicebility Checks Of Ht And Lt Cooling Water. N ( K ) Clean Air Compressor By Water Injection. N ( L ) Inspect And Clean Air Filter To The Turbo Charger. N ( M ) Check Function Of By-Pass And Waste Gate Assembly. N ( N ) Lubricate Fuel Control Mechanism Linkage. N ( P ) Check If Alarm And Safety System Is On With Running Engine, Rectify If Not Working. N ( Q ) Check Function Of Measuring Devices, Calibrate If Not Working Properly. N ( R ) Check Function Of Oil Mist Detector, Calibrate If Not Working Properly. N ( S ) Check Operation Of Turning Gear And Start Inter Lock Device, Repair / Calibrate If Malfunctioning. N ( T ) Check / Adjust Valve Clearance. N ( U ) Main Engine Ups Control Panel Door Damaged. To Be Renewed. N ( V ) Main Engine Fresh Water Cerculating Pump No.1 Breaker Tripping Frequently. Defect To Be Rectified. N ( W ) Both Me Lcp Display Malfunctioning. To Be Renewed. N ( X ) Turbocharger Outlet Temperature Sensor Faulty, To Be Replaced ( Port Main Engine ) N ( Y ) Both Main Engine Starting Air Line Water Trap Valves To Be Overhauled N ( Z ) Both Pre-Heater To Be Dismantled, Mechanically Cleaned And Boxed Back. System To Be Pressure Tested And Proved For Operation Post Fitment Of Pre-Heater. Test Pr- 3 Kg / Cm2. N ( Aa ) Both Pre- Hetaer Circulating Pump Alongwith Motor To Be Overhauled N ( Ab ) Main Engine Expansion Tanks ( Qty - 03 ) To Be Cleaned And Paint To Be Restored As Per Paint Scheme. Respective Sight Glass ( Qty-01 ) To Be Renewed. N ( Ac ) Stbd Main Engine Rpm Not Exceeding Beyond 260 At Idle As Against 600 Rpm, Defect To Be Rectified ( M / S Wartsila Engine ) N ( Ad ) Fuel Injectors Of Both Main Engines To Be Calibrated ( M / S Wartsila Engine ) N ( Ae ) Governor Calibration Of Stbd Main Engine To Be Undertaken ( M / S Europe Actuatore ) N ( Af ) Excessive Lub Oil Consumption On Both Main Engine. Dr To Be Undertaken N N 83 ( Port And Stbd Da, M / S Cummins India Ltd, 3000H ) :- Carry Out 3000 Hourly Routine :- N ( A ) Remove Injectors. Clean, Inspect, Repair & Calibrate With New Spares. N ( B ) Remove Heat Exchanger. Clean & Pressure Test. N ( C ) Remove Turbocharger. Clean, Inspect & Repair With New Repair N Kit ( Check Turbocharger End Play And Radial Clearance ) Ntighten Nut & Cap Screw Of Air Inlet And Exhaust System. Ncheck Vibration Damper Visuallyrepair If Defective. N ( D ) Replace Belts And Accessories. N ( E ) Check All Cut-Out & Safety Controls. Renwe If Defective. N ( F ) Flush Cooling System With Restore Plus, Run Engine To Bring It To Operating Temperature. Stop The Engine Reflush Cooling System With Portable Water 2-3 Times. Refill Cooling System With Coolant. Run The Engine For Three To Five Minutes. N ( G ) Post Completion Of Routines, Start The Engine And Check All Gauges, Replace If Required, Check For Oil / Water Leakage, Exhaust Leakage, Stop The Engine And Recheck Engine Oil Level, Top Up If Required. After Necessary Inspection Restart The Engine. Run At Idle Speed For 15 Minutes; Carry Out Safety Device Checks. Undertake Full Load Trials On Completion. Post Complition Of Routine Carry Out Sdc Checks And Load Trails, Calibrate / Renw Defective Safety Divices. N ( H ) Da Control Panel Door Damaged. To Be Renewed. 84 Port And Stbd Voith Turbo Schneider, Model - 21 R 5 / 150-2:- Carry Out Docking Routines And 5000 Hourly Routines :- ( A ) Check The Screw Joint Renew If Dfective. N ( B ) Check For The Leakage From Blade Shaft Sealing, If There Any Keajage Rectify It. N ( C ) Check For The Leakage From Main Seal, Change Seal If Defective. N ( D ) Check Main Gear Toothing For Any Damage, Rpair It If Damaged. N ( E ) Check The Input Gear Rpair It If Damaged. N ( F ) Check For The Leakage From Mounting Gear. If There Is Any Leakage Rectify It. N ( H ) Check For Leakage From The Propeller Well. If There Is Any Keajage Rectified It. N ( J ) Check For Correct Fuctionnig Of Rotor Space Ventilation Repaired It If Defective. N ( K ) Renew Corrosin Protection. Note. Quote For Services And Material / Spares. N 85 Fuel And Lub Oil Centrifuge Make-Alfa Laval Pa 605:- Carry Out Five Yearly Routines On Fuel And Lub Oil Centrifuge :- ( A ) Clean And Inspect Inlet And Outlet Pipe Threads, Paring Disc, Housings And Frame Hood. Renewed Damaged / Defective Parts. N ( B ) Clean And Inspect Separator Bowl, Top Disc, Bowl Discs, Distributor, Nozzles In Bowl Body, Sliding Bowl Bottom, Discharge Mechanism, Threads On Bowl Hood And Bowl Body, Bowl Spindle Cone And Bowl Body Nave, Renewed Damaged / Defective Parts. N ( C ) Clean And Inspect Oil Mist Fan, Oil Pump, Water Tank, Bowl Spindle, Ball Bearing Housing, Indentations And Radial Bobble Of Bowl Spindle, Renewed Damaged / Defective Parts. N ( D ) Clean Oil Sump, Change Oil And Oil Filling Device. N ( E ) Clean And Inspect Friction Coupling, Renewed If Defective. N ( F ) Replace Electric Motor Bearing. N 86 Ows Make-Suyash, Modle-Sd0.5:- Carry Out Five Yearly Routines :- ( A ) Replace Coalesce. N ( B ) Replace Adsorber Elements. N ( C ) Replace Stuffing Box Packing. N ( D ) Check Stator And Rotor, Replace Worn Out Component. N ( E ) Replace Zinc Anode. N ( F ) Check Oil Level Of Pump Gear, Fill Up If Required. N ( G ) Open The Inspection Port Of The Oil Separator Housing, The Oil Separator Housing And The Adsorber Housing. Replace Worn Out Parts. N ( H ) Remove The Sludge And Clean Container. N ( I ) Check Seal And Piston Valves, Replace Damaged Seal And Components. N ( J ) Replace Sensor Electrode. N ( K ) Checks The Function Of Heater, If Defective Replace It. N ( L ) Shore Suuply Connection Box Damaged. Box To Be Renewed To Ensure Water Tight Integrity. N 87 Reciprocating Air Compressors Make Elgi ( Model Hp 10 300 ) :- Carry Out 1000 Houlry Routines Of Air Compressor :- ( A ) Change Oil. N ( B ) Observed Noise And Vibration. N ( C ) Check Fasteners, Renwed If Dfective. N ( D ) Check For Air Leakage, Rectify If There Any Air Leakage. N ( E ) Adjust Pressure Setting As Per Manual. N ( F ) Change Inlet Air Filter. N ( G ) Clean Breather Valve. N ( H ) Inspect Valves, Renewed If Defective. N ( I ) Check Nrv, Repaired If Defective. N ( J ) Check Cooler, Repaired If Defective. N 88 Co2 Fire Fighting System:- Carry Out Sr Yearly Routines On Co2 Fire Fighting System :- ( A ) Carry Out Survey Of Piping. Repair / Renew As Required. N ( B ) Calibrate Weighing Beam Scale ( Where Fitted ) . N ( C ) Check All Flexible Hoses For Cracks, Embrittlement And Sign Of Cracking. Renew Them After Assessing The Condition N ( D ) Overhaul Non-Return Valves And Safety Stop Valves ( Where Fitted ) . N ( E ) Remove And Inspect Cylinder Operating Heads. Test For Correct Functioning. N ( F ) Renew Bursting Discs Fitted In Pipe System ( Where Fitted ) . N ( G ) Weigh The Co2 Cylinder Using Beam Scale. If The Weight Falls Below 10% Of Initial Weight, Recharge The Cylinders. Maintain Record In Log Book. N ( H ) Admit Lp Air Into Ring Main Checking The System For ( J ) Leaks. Ensure That All The Discharge Pipes And Nozzles Are Clear. Calibrate Pressure Gauges Fitted In The System. N ( K ) Check Audio Visual Alarm Function, Limit Switches In Control Penal For Operation, Renewed If Defective . Note- Quote For Services And Material / Spares 89 Serviceability Checks Of Co2 Fire Fighting Control System To Be Undertaken And Repaired With Spares As Required. Note- Quote For Services And Material / Spares 90 Hinges To Be Provided On Chequred Plates Of Engine Room For Operating System Valves. Note- Quote For Services And Material / Spares 91 Sea Water Suction Strainers :- Remove Inspect, Clean And Paint With Epoxy Coating For Following Suction Strainers : Main Sea Chest, Bilge Suction And Da Suction. Renew If Required. Mat - Ss As Per Sample Note- Quote For Services And Material / Spares 92 System Pipelines :- Removal, Chemical Clean And Repair System Pipelines. Pressure Testing To 1.5Xworking Pressure ( Kg / Cm2 ) , Undertake Fitment Onboard And Prove For Satisfactory Performance :- Galvanised Steel ( A ) 100Mm 93 ( B ) 80Mm 94 ( C ) 65Mm 95 ( D ) 50Mm 96 Copper. ( A ) 40Mm 97 ( B ) 32Mm 98 ( C ) 25Mm 99 ( D ) 20Mm 100 ( E ) 18Mm 101 ( F ) 15Mm 102 Cu-Ni ( A ) 125Mm 103 ( B ) 100Mm 104 ( C ) 80Mm 105 ( E ) 65Mm 106 ( F ) 50Mm 107 ( G ) 40Mm 108 ( H ) 25Mm 109 System Pipelines :- Renew With End Fittings, Pressure Test To 1.5Xworking Pressure ( Kg / Cm2 ) , Fit Onboard And Prove. ( A ) Air Vent & Filling System, 150Mm 110 100Mm 111 65 Mm 112 50 Mm 113 Copper ( A ) Lub Oil & Sanitary System, 40Mm 114 32Mm 115 25Mm 116 20Mm 117 18Mm 118 15Mm 119 12Mm 120 Both Main Engine Fly Wheel Safety Guards Damaged. Guards To Be Manufactured. Note- Quote For Services And Material / Spares 121 Flap Cover Perished, To Be Renewed N ( A ) Stbd Main Engine Exhaust Funnel. N ( B ) Provision Of New Dd Compressure Exhaust Outlet Flap Cover Note- Quote For Services And Material / Spares 122 External Fire Fighting System Make-Jason Engg Ais, Modle-Sru-C255 Vk1.8Ccw-02 :- Port Fi Fi Clutch Lub Oil Cooler To Be Cleaned And Pressure Test To Be Carried Out. Serviceability Checks Of System To Be Undertaken Including Necessqary Spares. Note- Quote For Services And Material / Spares 123 Lub Oil Transfer Pump Make-Tushaco, Modle-R-20-Dg :- Pump To Be Overhauled View High Vibration. Note- Quote For Services And Material / Spares 124 External Fire Fighting System:- Actuator Of Nozzle Of Fifi System On Top Of Bridge Not Operating. Same To Be Repaired / Renewed Note- Quote For Services And Material / Spares 125 Following Defects On Fifi System N ( A ) Clutch Not Engaging In Remote Mode. Dr To Be Undertaken. N ( B ) Fifi System Pipe Line Cracked / Damaged At 08 N Locations. Leakages To Be Rectified And System To Be Pressure Tested. Dia- 300 Mm, Mat- Cu Ni N ( C ) Operating Wheels Of Fifi System Valves ( 08 Nos ) Damaged. Same To Be Renewed. N ( D ) Hydraulic Valves Of Fifi System To Be Overhauled With Spares, Size - 300Mm, Qty-02 Note- Quote For Services And Material / Spares 126 Pressure Regulating Valves N ( A ) Operating At High Pressure Than Normal ( 01 In No ) , To Be Overhauled ( Range- 30 To 5 Bar ) N ( B ) Prv Operating At High Pressure Than Normal ( 02 Nos ) , To Be Overhauled ( Range- 30 To 9 Bar ) Note- Quote For Services And Material / Spares 127 Both Ru Tank Sight Glass Damaged. To Be Renewed. Note- Quote For Services And Material / Spares 128 Overhaul Air Starting Motor Of Main Engine, Make Wartsila Note- Quote For Services And Material / Spares 129 Fresh Water System Filling Point At Weather Deck Perished Same To Be Renewed With Flanges ( Aprrox Length- 0.25 Mtr. Mat-Gun Metal, Dia-65 Mm Nnote- Quote For Services And Material / Spares 130 Repair / Renewal Of Hand Pump Fitted On Foxle Note- Quote For Services And Material / Spares 131 Following Oil Pressure Setting To Be Adjusted On Both Voith-: ( A ) Lub Oil Pressure ( B ) Control Oil Pressure , Rotor Oil Pressure. 132 Voith Turbo Schneider, Model - 21 R 5 / 150-2 :- Following Voith Parameter Not Showing In Mcr Alarm Monitor Panel:- ( A ) Control Oil Pressure, ( B ) Lub Oil Pressure, ( C ) Rotor Oil Pressure, ( D ) Bearing Oil Temperature. To Be Rectified. 133 Safety Device Checks To Be Undertaken On Both The Voith System 134 Air Starting Motor Of Port Main Engine Defective, To Be Repaired With Oem Listed Spares As Required . 135 Valves Of Various Systems :- Removal, Overhauling, Pressure Testing And Fitment Of Following System Valves:- ( A ) 65 Mm Sdnr Valve 136 ( B ) 65 Mm Sd Valve 137 ( C ) 80 Mm Gate Valve 138 ( D ) 80Mm Globe Valve 139 ( E ) 125 Mm Strom Valve 140 ( F ) 150 Mm Sdnr Valve 141 ( G ) 200 Mm Gate Valve 142 ( H ) 200 Mm Butter Fly Valve 143 ( J ) 300 Mm Butter Fly Valve 144 ( K ) 100 Mm Gate Valve 145 ( L ) 40 Mm Sdnr Valve 146 ( M ) 40 Mm Globe Sd Valve 147 ( N ) 40 Mm Sd Valve 148 ( O ) 32 Mm Sd Valve 149 ( P ) 15 Mm Sdnr Valve 150 ( Q ) 65 Mm Strom Valve 151 ( R ) 80 Mm Strom Valve 152 ( S ) 125 Mm Sdnr Valve 153 ( T ) 50 Mm Quick Shut Down Valve 154 ( U ) 50 Mm Sdnr Valve 155 ( V ) 20 Mm Sdnr Valve 156 ( W ) 25 Mm Quick Shut Down Valve 157 ( X ) 15 Mm Cock Valve 158 Remove, Dismantle, Chemically Clean, Assemble And Pressure Test To Required Pressure With Spares For The Following N ( A ) Lub Oil Heat Exchangers Of Both Main Engine N ( B ) Both Alfa Cooler To Be Insitu Dismantled, Nmechanically Cleaned And Boxed Back With New Gaskets. System To Be Pressure Tested And Proved For Operation Post Fitment Of Coolers. Test Pr- 3.5 Kg / Cm2. N ( C ) Existing Inlet And Outlet Pipe Of Both Alfa Coolers To Be Repaced With Cu-Ni Pipe. Length- 0.3 Mtr, Mat- Ss, Dia- 80 Mm N ( D ) Sea Water Inlet Pressure Guage Line Adaptor Of Both Alfa Cooler Damaged, To Be Renewed Note- Quote For Services And Material / Spares 159 Renewal Of Hot Lagging For Da And Main Engine Compartment Note- Quote For Services And Material / Spares 160 Temperature Gauges Of Various System Lines To Be Renewed. Note- Quote For Services And Material / Spares 161 Suction And Discharge Pressure Gauges Of Various System Lines To Be Renewed. Note- Quote For Services And Material / Spares 162 Overhauling Of Fire Hydrants To Be Carried Out.Note- Quote For Services And Material / Spares 163 Leakage Observed From Dirty Oil Pipe Flange. Brazing And Pressure Test To Be Carried Out. Mat-Cu Ni, Dia-50 Mm. Note- Quote For Services And Material / Spares 164 Leakage Observed From Fuel Filling Line In Engine Room. Pipe To Be Replaced. Dia-50 Mm. Lenght-0.5Mtr, Mat-Ms.Note- Quote For Services And Material / Spares 165 Port Main Engine Breather Line Cracked. Pipe To Be Renewed. Mat-Ms, Dia-85 Mm, Length-0.5 Mtr.Note- Quote For Services And Material / Spares 166 Both Da Lub Oil Temperature Increasing. Both Lub Oil Cooler To Be Cleaned And Pressure Tested.Note- Quote For Services And Material / Spares 167 Both Da Sea Water Pressure Line Perished. Line To Be Replaced. Dia-5 Mm. Lenght-10 Mtr, Mat-Copper. Note- Quote For Services And Material / Spares 168 Port Main Engine Speed Sensor No-St173 And Temperature Sensor Is Not Operational. Sensors To Be Replaced With New Sensor. Note- Quote For Services And Material / Spares 169 Lub Oil Leakage Observed From Turbo Charger Return Line. Defect To Be Rectified. 170 Fuel Centrifugal Filter Of Main Engine Defective. Fuel Centrifugal To Be Replaced. Note- Quote For Services And Material / Spares 171 Air And Co2 Bottles To Be Pressure Tested At 1.5 Times Of Working Pressure. 172 Electrical Dl:Clean Winding And Ventilation Ducts. Check Condition Of Winding Insulation Including End Connections And Renew Windings If Insulation Values Below 1 M Ohm. Check Stator Connection For Good Contact, Retighten Screws. Replace Earthing Terminals. Carry Out The Complete Overhaulling Of Excitation Panel And Replace Spares Required For Factory Designed Performance. Check For Healthiness Of Avr. Avr Tuning To Be Undertaken By Vendor If Required Based On Trial / Performance Reports. Vendor To Also Cater For Avr Replacement If Required. Load Trials To Prove Performance Of Alternator To Be Undertaken By The Vendor. Requisite Load Bank Also To Be Arranged By The Vendor. Quote For Services And Spares. 173 Navigation Control Panel To Be Overhauled And Repair Of Defective Lamps To Be Undertaken . Note- Quote For Services And Material / Spares 174 Repair Of Mb Sre Amplifier Unit To Be Carried Out 175 Emergency Lights With Assembly In Various Locations Defective. To Be Replaced With New Lights. Quote For Services And Spares. N 176 Fifi Monitor Remote Operation Non-Ops. Suspected Cable Damaged. Cable To Be Replaced And Rotary Switch To Be Renewed. Cable Specifications : 1 Sq Mm, 2 Core. Note- Quote For Services And Material / Spares 177 Carry Out Sr Routines Of All Transformers Fitted Onboard With Oem Recommended Components As Required:- ( A ) Using A Soft Brush And Vacuum Cleaner, Clean And Blow-Out Dust Nand Dirt From The Terminal Insulation Block, Between Lamination And Nthe Side And Bottom Ventilation Grills. N ( B ) Check Tightness Of All Connections And Earth Bonding Straps. Tight Loose Connections. N ( C ) Check All Lamination Securing Nuts For Tightness. Tight Loose Nuts. N ( D ) Examine Condition Of Insulation And Cable Spills For Sign Of Ncracking And Over-Heating. Change Low Insulations / Damaged Cable. N ( E ) Grease Threads Of Cover Securing Nuts And Bolts Using Anti-Seize Ngrease And Replace Covers. N ( F ) Examine Shock / Vibration Mountings, Renew If Required. N ( G ) Clean Out Using Soft Brush And Blower. N ( H ) Check All Connections And Terminal Screws Are Tight. N ( I ) Examine All Wiring For Signs Of Deterioration. Renewed Defective N ( J ) Examine Components For Over-Heating / Cracking And Capacitors Nfor Leakage. Renewed Defective Parts. N ( K ) Revarnishing Of The Coils To Be Undertaken Post Routines N N 178 Motors & Starters:- Carry Out Overhauling Of Following Motors And Starters ( Including Remote Operation ) . Motor Bearings To Be Replaced And Trials To Be Offered To Ship Staff. Rewinding Of The Motors To Be Undertaken If Insulation Values Below 1 M Ohm. Replacement Of Ber / Aber Motors To Be Undertaken As One To One Replacement. Vendor To Also Cater For Dismantling And Refitment Of The Motor. Equipment Performance To Be Restored To Factory Designed Condition. Replacement Of All Defective Parts To Be Catered By The Vendor. Note- Quote For Services And Material / Spares - ( A ) Fire & Gs P / P ( 7.5Kw ) 179 ( B ) Bilge Ballast Gs Pp ( 11Kw ) 180 ( C ) Fo Transfer Pump ( 0.75Kw ) 181 ( D ) Lo Transfer Pp ( 0.75Kw ) 182 ( E ) E / Room Supply Fan ( 7.5Kw ) 183 ( F ) Dirty Oil Pp ( 0.75Kw ) 184 ( G ) Lub Oil Cetrifuge ( 0.75Kw ) 185 ( H ) Voith Cooling Pp ( 3.7Kw ) 186 ( J ) Windlass Motor ( 5.6Kw ) 187 ( K ) Capstan Motor ( 7.5Kw ) 188 ( L ) O / Bilge Water Seperator ( 0.55Kw ) 189 ( M ) Boat Davit ( 7.5Kw ) 190 Lighting Circuit Cable And Switches ( 30 Nos ) At Various Locations Perished / Damaged. Cable / Switch Renewal To Be Undertaken. Cable Specifications 2.5 Sq Mm, 2 Core. 191 Rewinding Of 10Kva Lighting Transformers View Low Insulation Of Primary And Secondary Windings. Note- Quote For Services And Material / Spares 192 Sart Battery To Be Replaced And Instruments To Be Tested On Board. Battery Specification 12 V, 7 Ah. Note- Quote For Services And Material / Spares 193 Renewal Of 08 In No. Mob Fitted On Weather Deck, Type Lsa Code Msc 207 ( 81 ) . Note- Quote For Services And Material / Spares 194 Repair Of Navigational Lights Fitted On Main Mast Qty - 04 . Note- Quote For Services And Material / Spares 195 Replacement Of Test Equipments:- Multimeter Make- Fluke. 196 Tong Tester . Make- Fluke. 197 Analog Megger. Make- Fluke. 198 Replacement Of Battery And Hrg ( Hydrostatic Release Gear ) Of Epirb. Battery Specs - 12 V, 7 Ah.Note- Quote For Services And Material / Spares 199 Echo Sounder Calibration Including Fitting Of Hull Appendages To Be Undertaken. Printer Fitted In Wheel House Defective. To Be Replaced. Note- Quote For Services And Material / Spares 200 E / R Alarm Panel Display Monitor Not Working. To Be Replaced. 201 Split Ac Fitted In Wheel House Defective. To Be Repaired. Note- Quote For Services And Material / Spares 202 Control Batteries Of Da To Be Replaced. 12 V 120 Ah 203 Control Batteries Of Da To Be Replaced . 12 V 150 Ah 204 Control Batteries Of Da To Be Replaced . 12 V 180 Ah 205 Control Batteries Of Da To Be Replaced . 12 V 200 Ah 206 Tank Content Gauges ( Nivo System ) Not Working. Functional Checks All Gauges To Be Carried Out. Defective Components And Sensors To Be Replaced. Tank Level Calibration To Be Undertaken Thereafter. Display Module Serviceability Checks And Calibration To Be Undertaken. Replace If Ber / Defective. Quote For Services 207 Tubelight Fitted Onboard At Various Locations To Be Replaced With Led Tubelights . Note- Quote For Services And Material / Spares 208 Serviceability Of Magnetic Compass And Anemometer To Be Undertaken Followed By Calibration With Spares. Renew If Defective. Qoute For Services And Spares 209 Air Whistle Not Working. Overhauling And Repair To Be Undertaken With Oem Recommended Components As Required. Quote For Services And Spares 210 E / R General Calling Alarm Not Working. To Be Repaired 211 Spt Fitted Onboard At Various Locations Found Defective, To Be Replaced. 212 Window Wiper And Associated Mechanisms And Clear View In Wheel House Defective. To Be Renewed Including Spares. Quote For Services And Spares. 213 E / R Alarm Panel Display Key Board In Wheel House Not Working. To Be Repaired With Oem Recommended Components As Required. 214 03 In No Flood Light And 02 In No Search Light Not Working. To Be Replaced. Note- Quote For Services And Material / Spares 215 Port Main Engine Emergency Stop Push Button Is Defective At The Wheel House. To Be Replaced With New One. 216 Renewal Of Flood Lights Fitted In Engine Room With Led Lights. Note- Quote For Services And Material / Spares 217 Double Pole Switch With Single Way Are Defective. To Be Replaced With New One. Note- Quote For Services And Material / Spares 218 Deck Lights Guard / Fitting Are Broken. To Be Replaced With New One. Note- Quote For Services And Material / Spares 219 Repair Gps Display Unit Garmin With Oem Recommended Components As Required And Undertake Serviceability Checks. Note- Quote For Services And Material / Spares 220 Tru Batteries Not Holding Charge. To Be Replaced With New One 12V 180 Ah Maintenance Free Batteries . Note- Quote For Services And Material / Spares 221 Following Defective. To Be Repaired / Replaced N ( A ) Wall Mounted Fan Defective ( 20 Nos ) . N ( B ) Galley Hot Plate ( 02 Nos ) 222 5Kva Ups Defective. Batteries To Be Renewed. Battery Specification 12 V, 150 Ah ( 2 Nos ) 223 Deck Washing Machine Non Opertional To Be Renewed. Note- Quote For Services And Material / Spares 224 Lighting Switches Are Broken At Various Locations. To Be Replaced With Holder Assembly. Note- Quote For Services And Material / Spares 225 Serviceability Checks Of Navigational Radar Including Vswr And Power Output Checks. Replace Defective Transreceiver Pcb And Other Components As Necessary. Qoute For Services And Spares. 226 Hull Spares: Capstan Fixed Contacts. ( Ser No. 18 ) 227 Moving Contacts ( Ser No. 213 ) 228 Indicating Lamps ( Red ) . ( Ser No. 210 ) 229 Fuse Links ( Ser No. 206 ) 230 Controller Contacts ( Fixed ) ( Ser No. 190 ) 231 Controller Contacts ( Moved ) ( Ser No. 190 ) 232 Friction Lining For Disc Brake ( Ser No. 14 ) 233 Boat Davit Limit Switch ( Ser No. 31 ) 234 Fuse Elements ( 2A, 4A, 32A ) ( Ser No. 200 ) 235 Indicating Lamps ( Red ) ( Ser No. 206 ) 236 Push Button ( Green ) ( Ser No. 206 ) 237 Liner For Brake ( Ser No. 25 ) 238 Fuse For ( 1A, 2A, 4A, 10A, 16A, 32A ) ( Ser No. 178 ) 239 Master Controller Contact Kits ( Ser No. 177 ) 240 Contractor Kits ( Ser No. 174 ) 241 Lamps ( Ser No. 173 ) 242 Bearing For Motor ( Ser No. 179 ) 243 Friction Liner For Disc Brake ( Ser No. 14 ) 244 Gland Packing, Walker Remix ( P.No.Bba2522-879 ) ( Ser No. 26 ) 245 Indication Lamps ( Ser No. 21 ) 246 Mp Filter Hp0372a10an, Italy ( P. No. Hp0372a10an ) ( Ser No. 24 ) 247 Washer Od 100X1d 80 ( Ser No. 24 ) 248 Main Engine, Wartsilla, Model : 8L-26 Spares :- Fuel Filter ( 4761002 ) ( Ser No. 82 & 158 ) 249 Filter Paper ( 4713047 ) ( Ser No. 82 & 158 ) 250 Gasket ( 1072002 ) ( Ser No. 82 & 158 ) 251 Gasket ( 1072003 ) ( Ser No. 82 & 158 ) 252 O-Ring 20X3 ( 121007 ) ( Ser No. 82 & 158 ) 253 O-Ring ( 4712063 ) ( Ser No. 82 & 158 ) 254 Gasket ( 4712062 ) ( Ser No. 82 & 158 ) 255 Screw ( 218003 ) ( Ser No. 82 & 158 ) 256 Valve ( 2180049 ) ( Ser No. 82 & 158 ) 257 O-Ring ( 2180059 ) ( Ser No. 82 & 158 ) 258 Starting Air Pipe ( 2180063 ) ( Ser No. 82 & 158 ) 259 Sealing Ring ( 2180076 ) ( Ser No. 82 & 158 ) 260 O-Ring ( 2180077 ) ( Ser No. 82 & 158 ) 261 Washer ( 2180085 ) ( Ser No. 82 & 158 ) 262 Gasket ( 2180086 ) ( Ser No. 82 & 158 ) 263 Following Spares Main Diesel Alternator Model:6Cta8.3D / M ( Mandatory Spares ) :- Element Lub Oil ( Lube Oil Filter ) Make : Fleetguard ( 3401544 ) ( Ser No. 83 ) 264 Ring Compress ( 3919918 ) ( Ser No. 83 ) 265 Ring Compress ( 3922686 ) ( Ser No. 83 ) 266 Ring Retainer ( 3920692 ) ( Ser No. 83 ) 267 Ring, Oil Piston ( 3921919 ) ( Ser No. 83 ) 268 Regulator, Vol. Stamford Mx321, Eoo-23212 ( 2890759 ) ( Ser No. 83 ) 269 Rectifier ( 2890014 ) ( Ser No. 83 ) 270 Bearing, Main ( Thrust ) ( 3944153 ) ( Ser No. 83 ) 271 Bearing, Main ( Thrust ) ( 3944158 ) ( Ser No. 83 ) 272 Bearing Crank ( Thrust ) ( 3944163 ) ( Ser No. 83 ) 273 Valve, Intake ( 3924492 ) ( Ser No. 83 ) 274 Valve, Intake ( 3921444 ) ( Ser No. 83 ) 275 Collet, Valve ( 3901177 ) ( Ser No. 83 ) 276 Guide, Valve ( 3925863 ) ( Ser No. 83 ) 277 Injector ( 3926787 ) ( Ser No. 83 ) 278 Valve Spring ( 3991085 ) ( Ser No. 83 ) 279 Gasket, Exh. Ou; ( 3873509 ) ( Ser No. 83 ) 280 Valve Insert ( 3970278 ) ( Ser No. 83 ) 281 Bearing Connection ( 3901430 ) ( Ser No. 83 ) 282 Piston Pin ( 3934046 ) ( Ser No. 83 ) 283 Fuel Filter ( 3931063 ) ( Ser No. 83 ) 284 Valve Insert ( 3908830 ) ( Ser No. 83 ) 285 Element Air Cleaner ( 3814313 ) ( Ser No. 83 ) 286 Element Air Cleaner ( 3814312 ) ( Ser No. 83 ) 287 Gasket Set ( Gasket Turbo ) ( 3755843 ) ( Ser No. 83 ) 288 Belt V Ribbed ( 3289124 ) ( Ser No. 83 ) 289 Seal, Valve St ( 3927642 ) ( Ser No. 83 ) 290 Bolt, Connection ( 3928870 ) ( Ser No. 83 ) 291 Nut Connection ( 3934864 ) ( Ser No. 83 ) 292 Pump Fuel Injector ( 5263870 ) ( Ser No. 83 ) 293 Tube Injector ( 5271935 ) ( Ser No. 83 ) 294 Sensors, Pr. ( 2 To 10 Bar ) ( 4911882 ) ( Ser No. 83 ) 295 Sensors ( Temperature ) ( 4911877 ) ( Ser No. 83 ) 296 Pump, Sea Water ( 4963510 ) ( Ser No. 83 ) 297 Seal Oil ( 3942535 ) ( Ser No. 83 ) 298 Seal Oil ( 5259499 ) ( Ser No. 83 ) 299 Seal Injector ( 3909886 ) ( Ser No. 83 ) 300 Gasket Exhaust ( 3932063 ) ( Ser No. 83 ) 301 Gasket Gear , H ( 3944293 ) ( Ser No. 83 ) 302 Gasket Cover ( 3939258 ) ( Ser No. 83 ) 303 Gasket Hydraulic ( 3940245 ) ( Ser No. 83 ) 304 Gasket Cylinder ( 3938267 ) ( Ser No. 83 ) 305 Washers Lock ( 611 ) ( Ser No. 83 ) 306 Screw Hex, Flange ( 3243948 ) ( Ser No. 83 ) 307 Plug Pipe ( S911b ) ( Ser No. 83 ) 308 Hardness Wiring ( 3875359 ) ( Ser No. 83 ) 309 Control Governor ( 3974704 ) ( Ser No. 83 ) 310 Washer Plain ( 640 ) ( Ser No. 83 ) 311 Nut Heavy Hex ( 204 ) ( Ser No. 83 ) 312 Screw Haxagon ( 112C ) ( Ser No. 83 ) 313 Washers Plain ( S602 ) ( Ser No. 83 ) 314 Washers Lock ( 604 ) ( Ser No. 83 ) 315 Clamp Hose ( 43828 ) ( Ser No. 83 ) 316 Brace, Tube ( 101470 ) ( Ser No. 83 ) 317 Clip ( 107460 ) ( Ser No. 83 ) 318 Screw Hexagon ( 109 ) ( Ser No. 83 ) 319 Connection Ex ( 3814793 ) ( Ser No. 83 ) 320 Flange, Weld ( 3226087 ) ( Ser No. 83 ) 321 Clip ( 500694 ) ( Ser No. 83 ) 322 Screw Hexagon 112C ) ( Ser No. 83 ) 323 Screw Hexagon ( 1137 ) ( Ser No. 83 ) 324 Nut Hex Heavy ( 204 ) ( Ser No. 83 ) 325 Nut Hex Heavy ( 203 ) ( Ser No. 83 ) 326 Washers Lock ( 604 ) ( Ser No. 83 ) 327 Washers Lock ( 611 ) ( Ser No. 83 ) 328 Washers Plain ( 640 ) ( Ser No. 83 ) 329 Gasket Exhaust Ou 2880039 ) ( Ser No. 83 ) 330 Gasket Dia 135 Pcd 115 Dia ( 3940245 ) ( Ser No. 83 ) 331 Washer Plain ( 640 ) ( Ser No. 83 ) 332 Connection Se ( 2867840 ) ( Ser No. 83 ) 333 Connection Se ( 2867838 ) ( Ser No. 83 ) 334 Tools :-½ Breaker Bar-15’’ Long ( Ser No. 83 ) 335 Procurement Of Following Spares Of Voith Turbo Schneider Propulsion Type Vsp 28R5 / 234-2Ae45 Kw Rpm ( Mandatory Spares ) :- Shaft Seal Ring Adck-300X340x16 ( H01.067195 ) ( Ser No. 84 ) 336 Round Cord Ring V-420X4.5Nbr70 ( H01.086366 ) ( Ser No. 84 ) 337 O - Ring 560X5 Nbr70 ( H01.032840 ) ( Ser No. 84 ) 338 O- Ring 454X8 Nbr 70 ( H01.064102 ) ( Ser No. 84 ) 339 Bulb Lamp 35X18.5-24V 5W ( H01.095322 ) ( Ser No. 84 ) 340 Filter Element Hydac 12782361300R020 ( H01.016221 ) ( Ser No. 84 ) 341 Repair Kit ( H01.012435 ) ( Ser No. 84 ) 342 Alfa Laval Fuel Oil Centrifuge:- Major Service Kit - 546670-07-08 343 Ows Make-Suyash, Modle-Sd0.5:- Cover Gasket ( 8320025002 ) ( Ser No 86 ) 344 Coaleser Element ( 2704002501 ) ( Ser No 86 ) 345 Sacrificial Anode ( 6453020001 ) ( Ser No 86 ) 346 Set Stuffing Box-Packing ( 546040207Ep1 ) ( Ser No 86 ) 347 Desicator Cartridge ( 51110Em027 ) ( Ser No 86 ) 348 Reciprocating Air Compressors Make Elgi ( Model Hp 10 300 ) :- V Belt ( 000905283 ) ( Ser No 87 ) 349 Inlet Air Filter ( 022100929 ) ( Ser No 87 ) 350 Gasket Free End Civer ( 020365450 ) ( Ser No 87 ) 351 Gasket Fly End ( 000425510 ) ( Ser No 87 ) 352 Gasket Valve Flate ( 000411530 ) ( Ser No 87 ) 353 Valve Finger Type ( 0003300950 ) ( Ser No 87 ) 354 Valve Finger Type ( 000330970 ) ( Ser No 87 ) 355 Gasket ( 0001004A ) ( Ser No 87 ) 356 Anchor Windlass:- Packing For Top Cover ( 02211-6235-1015 ) ( Ser No. 19 ) 357 Friction Lining For Slipping Clutch ( 02-18-6232-Sc-875240 ) ( Ser No. 19 ) 358 Spring For Slipping Clutch ( 02-18-6232-Sc-875270 ) ( Ser No. 19 ) 359 Rivets For Friction Lining ( 02-18-6232-Sc-875 ) ( Ser No. 19 ) 360 Friction Lining For Emb ( B-Emb-2451-B-3024 ) ( Ser No. 19 ) 361 Rivets For Friction Lining ( A-Emb-1900-180-3092 ) ( Ser No. 19 ) 362 Spring For Emb ( B-Emb-2451-B-3017 ) ( Ser No. 19 ) 363 Procurement Of Following Maintenance Free Lead Acid Batteries ( A ) 120 Ah - 12 Nos ( Ser No. 19 ) 364 ( B ) 150 Ah - 12 Nos ( Ser No. 19 ) 365 ( C ) 180 Ah - 12 Nos ( Ser No. 19 ) 366 ( D ) 200 Ah - 10 Nos ( Ser No. 19 ) 367 Fuse ( 0219-6232-9000-F1-F10 ) ( Ser No. 19 ) 368 Indication Lamp ( 02-19-6232-9000-H1-H2 ) ( Ser No. 19 ) 369 Service Charge For Third Party Inspection ( For Hull Survey And Qc )