| 1 | 1 | Charges for removal of the local Pressure/Temperature Gauges, and refixing them after calibration in Boiler, Turbine & Generator areas. | BI01010001010000000000000515BI0100001112 | 200 | Nos |
|---|
| 2 | 2 | Charges for removal of Pressure / Temperature Transmitters including disconnecting the control cables, removal of clamps & manifold and refixing them after calibration in Boiler, Turbine & Generator areas. | BI01010001010000000000000515BI0100001113 | 240 | Nos |
|---|
| 3 | 3 | Charges for removing and refitting of accessories in pneumatic control valves & dampers such as I/P Convertors, Air lock relay, Air regulators, Positioners and position feedback transmitters sending to lab for testing and receiving the tested instruments from lab. | BI01010001010000000000000515BI0100001114 | 40 | Nos |
|---|
| 4 | 4 | Charges for cutting and welding of take off catch pot in mills, flue gas, primary and secondary air path. | BI01010001010000000000000515BI0100001115 | 40 | Nos |
|---|
| 5 | 5 | Charges for 3 Nos. of single point cutting and welding of pipe size 1/2\" impulse lines of mills, flue gas, primary and secondary air path including cost of gas, welding electrodes & consumables such as cotton waste, hacksaw blade, etc.,, | BI01010001010000000000000515BI0100001116 | 50 | Nos |
|---|
| 6 | 6 | Charges for calibration of RTD, TC, I/P convertors and Solenoid Valves, Pressure Switches and Temperature Switches and Vacuum Switches. | BI01010001010000000000000515BI0100001117 | 360 | Nos |
|---|
| 7 | 7 | Charges for flushing of impulse lines of all types of transmitters in Boiler & Turbine Area. | BI01010001010000000000000515BI0100001118 | 300 | Nos |
|---|
| 8 | 8 | Charges for material and tool handling disassembling and reassembling works in the calibration of control actuators. | BI01010001010000000000000515BI0100001119 | 90 | Nos |
|---|
| 9 | 9 | All types of Panel cleaning includes DCS, UPS, Power Packs, Power Supply Panel, etc., removal of Modules, Cleaning of Modules and refixing the Modules. | BI01010001010000000000000515BI0100001120 | 180 | times |
|---|
| 10 | 10 | Releasing, transporting, overhauling, checking, re-fixing and conducting functional test on 4 nos. Burner tilt Power cylinders | BI01010001010000000000000515BI0100001121 | 2 | Nos |
|---|
| 11 | 11 | Overhauling of Actuators. Charges for releasing of ID/FD/PA/HAD/CAD Electrical Actuators in Boiler area from Gear Box in existing location, Cleaning, Inspection of defective spares. | BI01010001010000000000000515BI0100001122 | 15 | Nos |
|---|