| 1 | 1 | Dismantling taking out HT cable from cable duct of substations for realingnment of cable and relaying with proper alingnment for the cable of size 3 core, 150 sqmm, 11000 volts grade complete all as specified and as directed.\nNote: (a) Each cable shall be measured and paid separately \n(b) Steel cable rack shall be measured and separately as supply and fix | | 200 | RM |
|---|
| 2 | 2 | All as per item No 1.00 above but for cable sizes 185 sqmm | | 250 | RM |
|---|
| 3 | 3 | All as per item No 1.00 above but for cable sizes 240 sqmm | | 350 | RM |
|---|
| 4 | 4 | All as per item No 1.00 above but for cable sizes 300sqmm | | 450 | RM |
|---|
| 5 | 5 | All as per item No 1.00 above but for cable sizes 400 sqmm | | 250 | RM |
|---|
| 6 | 6 | Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m in depth and getting out in soft / loose soil for cable work or from above cable duct complete all as specified and as directed. | | 30.5 | Cum |
|---|
| 7 | 7 | Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m in depth and getting out in soft disintegrated rock (considered for road cutting) complete all as specified and as directed. | | 15.5 | Cum |
|---|
| 8 | 8 | Returning, filling in including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick complete all as specified and as directed. | | 19 | Cum |
|---|
| 9 | 9 | Removing of excavated material not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and as directed. | | 5 | Cum |
|---|
| 10 | 10 | Material & labour for dry sand cushioning for under ground cable provided with layer and sand 8 cm deep before laying the cable and 15cm after laying the cable complete all as specified and as directed.\nNote : Punned depth only shall be measured as per SSR provisions. | | 21.2 | RM |
|---|
| 11 | 11 | Supply and laying un-reinforced precast concrete cable cover, class HV, Type 1, flat, size 300 mm x 180mm x 40mm complete all as specified and as directed.\nNote : Width of protection shall be equal to the length of cover. | | 1089 | Each |
|---|
| 12 | 12 | Material & labour for PCC 1:3:6, type-C 2, using 40mm graded aggregrate for repair to path/drain/road against dameged due to excavation/laying of cable complete all as specified and as directed. | | 2.5 | Cum |
|---|
| 13 | 13 | Supply & Lay in trenches or in duct or passing through pipe XLPE insulated, screened, PVC bedded, galvanised steel strip armoured, overall PVC sheathed electric power cables (heavy duty) with aluminium conductor, 11000 volts grade (Earthed) cross sectional area 150 sq mm 3 core including dismantling / taking down unserviceable one complete all as specified and as directed.\nNote : Pipe shall be measured and paid separately if cable passed through pipe. | | 30 | RM |
|---|
| 14 | 14 | All as per item No 13.00 above but of size 185 sq mm 3 core including dismantling / taking down unserviceable one complete all as specified and as directed. | | 30 | RM |
|---|
| 15 | 15 | All as per item No 13.00 above but of size 240 sq mm 3 core including dismantling / taking down unserviceable one complete all as specified and as directed. | | 90 | RM |
|---|
| 16 | 16 | All as per item No 13.00 above but of size 300 sq mm 3 core including dismentling / taking down unserviceable one complete all as specified and as directed. | | 100 | RM |
|---|
| 17 | 17 | All as per item No 13.00 above but of size 400 sq mm 3 core including dismantling / taking down unserviceable one complete all as specified and as directed. | | 30 | RM |
|---|
| 18 | 18 | Supply & fix cable jointing kit for 11 KV (Earthed) grade cable for indoor termination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 150 sqmm to 185 sqmm after opening VCB panel back side cable cover and bottom cable entry plate after disconneting unserviceable cable kit from busbar / CT, taking out from VCB cable chamber and fixing the same to original position, with new or old nuts, bolts & washers, bottom plate, back cover and making cable entry point totally sealed with putty complete all as specified and as directed. | | 2 | Each |
|---|
| 19 | 19 | All as per item No 18.00 above but for (indoor termination) cable of size 240 sqmm to 300 sqmm including dismantling / taking down unserviceable one complete all as specified and as directed. | | 11 | Each |
|---|
| 20 | 20 | All as per item No 18.00 above but for (indoor termination) cable of size 400 sqmm including dismantling / taking down unserviceable one complete all as specified and as directed. | | 2 | Each |
|---|
| 21 | 21 | Supply & Fix cable jointing kit for 11 KV (Earthed) grade cable for out-door termination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 240 sqmm to 300 sqmm after disconneting unserviceable cable kit from busbar at structure, taking out carefully after opening clamp at structure to GL and fixing the same to original position, with new or old nuts, bolts & washers, clamp at structure complete all as specified and as directed. | | 2 | Each |
|---|
| 22 | 22 | Supply & Fix cable joining kit for 11 KV (Earthed) grade cable for straight through heat shrink type joint complete with joining material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 150 sqmm to 185 sqmm including dismantling / taking down unserviceable one complete all as specified and as directed. | | 2 | Each |
|---|
| 23 | 23 | All as per item No 22.00 above but for (straight through heat shrink type joint) cable of size 240 sqmm to 400 sqmm including dismantling / taking down unserviceable one complete all as specified and as directed. | | 4 | Each |
|---|
| 24 | 24 | Supply & fix GI tubing 100mm bore ISI marked medium grade for cable protection under road crossing including dismantling taking down unserviceable one complete all as specified and as directed. | | 12 | RM |
|---|
| 25 | 25 | Material & labour for cleaning of HT indoor cable kit at VCB end after opening VCB panel back side cable cover and bottom cable entry plate after disconneting all cable end from busbar / CT, taking out from VCB cable chamber, checking for serviceability, cleaning & decarbonising complete cable kit and aluminium cable lugs using CTC and refixing the same to original position, with new or old nuts, bolts & washers and making cable entry point totally sealed with putty complete all as specified and as directed.\nNote: Required CTC, new nuts, bolts, washers shall be inclusive of quoted rate. Serviceable cable ends shall only be measured) | | 51 | Each |
|---|
| 26 | 26 | Material & labour for setting of 3 ph over current + earth fault numerical relays by secondary injection of current to CTs with suitable equipment for over current & earth fault with high set and low set including checking of all other parameters of relays for proper tripping order after disconnection of incoming or out going HT XLPE cable connection from VCB CTs and reconnection of cable ends at existing terminals after completion of relay setting complete all as specified and directed. \nNote: (a) Relay setting shall be made considering corresponding values of up stream and down stream VCB relays and recorded maximum demand of VCB. Any further adjustment of values as many times require shall be carried out within the quoted rate. \n(b) Recovery shall be made double the quoted rate if VCB fails to trip in indicated fault and if group tripping recorded. | | 25 | Each Job |
|---|
| 27 | 27 | Material & labour for finding of cable fault of UG 11000 volts grade cable inside trench (under soil / drain/ PCC / road / trench ) by disconnecting both cable ends, using insulation tester, cable path/fault finder and rectification complete by necessary excavation, cutting at fault position, fixing of straight through heat shrink joint, for cable sizes 150 sqmm to 400 sqmm, 3 core, 11000 volts grade or replacement of heat shrink indoor cable joint kit of size 150 sqmm to 400 sqmm, 3 core and reconnection of both cable end to original position after complete satisfactory insulation test, fixing with old or required new nuts-bolts-washers complete with testing all as specified and directed . \nNote: (a) Items required for rectification such as heat shrink indoor cable joint kit / heat shrink straight through joints / heat shrink sleeves and earth work shall be measured separately as material and labour.\n(b) Required aluminium cable lugs and nuts-bolts-washers shall be inclusive of quoted rate. \n(c) Contractor shall bring necessary testing equipment and rate shall be inclusive of quoted rate. | | 6 | Each Job |
|---|
| 28 | 28 | Supply and fix space heater, 230V, 100 watt inside cable chamber including necessary connection, testing complete all as specified and as directed.\nMake- Schneider, Part No-ETH-A-AA000-001 | | 47 | Each |
|---|
| 29 | 29 | Supply and fix including dismantling taking out unserviceable thermostat for space heater for 800A to 1600A Schneider make 11 KV VCB. \nMake-Schneider only | | 41 | Each |
|---|
| 30 | 30 | De-carbonizing / cleaning of HT 11 KV, 3 phase independent bus bar &, bus bar chamber of HT panel installed in sub-stations after removing top cover of Busbar chamber, cleaning of bus bar spout and busbar in position with CTC and forced hot air, checking all the connections, tightening the nuts, bolts of all joints complete all as specified and as directed. | | 12 | Each Job |
|---|
| 31 | 31 | Taking down HT 11 KV vacuum circuit breaker of capacity 400 Amps to 1250 Amps, checking the trolley of the breaker, opening the total mechanism of breaker, checking it’s contacts, baffle plates and other minor parts, cleaning the accessories carefully, checking of the mechanism condition, remove the carbon deposited inside the contacts, tank, baffle plates, rotating contacts, upper supports, lower supports, drive assemblies, re-installation and testing complete all as specified and as directed. | | 15 | Each Job |
|---|