| 1 | 1 | Remuneration for Local Staff | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.1 | Team Leader Cum Senior Highway Engineer (1 No) | BI01010001010000000000000515BI0100001113 | 48 | Nos |
|---|
| 3 | 1.2 | Resident cum Highway Engineer(1 No) | BI01010001010000000000000515BI0100001114 | 96 | Nos |
|---|
| 4 | 1.3 | Bridge/Structural Engineer (1 No) | BI01010001010000000000000515BI0100001115 | 36 | Nos |
|---|
| 5 | 1.4 | Senior Quality Cum Material Expert (1 No) | BI01010001010000000000000515BI0100001116 | 36 | Nos |
|---|
| 6 | 1.5 | Senior Pavement Specialist | BI01010001010000000000000515BI0100001117 | 36 | Nos |
|---|
| 7 | 1.6 | Road Safety Expert | BI01010001010000000000000515BI0100001118 | 36 | Nos |
|---|
| 8 | 1.7 | Sub-Professional Staff | BI01010001010000000000000515BI0100001119 | | |
|---|
| 9 | 1.71 | Survey Engineer (1nos during Construction Period) | BI01010001010000000000000515BI0100001120 | 36 | Nos |
|---|
| 10 | 1.72 | Assistant Highway Engineer (2 nos during Construction Period and 1 no during Maintenance Period) | BI01010001010000000000000515BI0100001121 | 72 | Nos |
|---|
| 11 | 1.73 | Assistant Quality cum Material Engineer (2nos during Construction Period) | BI01010001010000000000000515BI0100001122 | 72 | Nos |
|---|
| 12 | 1.74 | Quantity Surveyor (2 nos during Construction Period and 1 no during Maintenance Period) | BI01010001010000000000000515BI0100001123 | 72 | Nos |
|---|
| 13 | 1.75 | Highway Design Engineer (1nos during Construction Period) | BI01010001010000000000000515BI0100001124 | 6 | Nos |
|---|
| 14 | 2 | Support Staff (inclusive of per diem allowance) | BI01010001010000000000000515BI0100001125 | | |
|---|
| 15 | 2.1 | Office Manager (1 No) | BI01010001010000000000000515BI0100001126 | 96 | Nos |
|---|
| 16 | 2.2 | Accountant Cum Cashier (1 No) | BI01010001010000000000000515BI0100001127 | 96 | Nos |
|---|
| 17 | 2.3 | Steno cum Computer operator (1 No) | BI01010001010000000000000515BI0100001128 | 96 | Nos |
|---|
| 18 | 2.4 | Office Boy (1 No) | BI01010001010000000000000515BI0100001129 | 96 | Nos |
|---|
| 19 | 3 | Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run | BI01010001010000000000000515BI0100001130 | | |
|---|
| 20 | 3.1 | Scorpio or equivalent 4x4 vehicle(not more than 3 years old) (2 nos during Construction Period and 1 nos during Maintenance Period.) | BI01010001010000000000000515BI0100001131 | 96 | Nos |
|---|
| 21 | 4 | Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 20 round trip to Employer's Head Office and 20 round trip to Employer's regional office. (including Hotel Charges,travel costs etc. complete) | BI01010001010000000000000515BI0100001132 | 1 | LS |
|---|
| 22 | 5 | Office Rent (Fixed Costs) \nThe rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. \n | BI01010001010000000000000515BI0100001133 | | |
|---|
| 23 | 5.1 | Minimum 200 sqm area of Office shall be rented for Construction Period & Defect Liability Period(Maintenace Period) | BI01010001010000000000000515BI0100001134 | 96 | Nos |
|---|
| 24 | 6 | Office Supplies, Utilities and Communication (Fixed Costs) | BI01010001010000000000000515BI0100001135 | | |
|---|
| 25 | 6.1 | Office Supplies | BI01010001010000000000000515BI0100001136 | 96 | Nos |
|---|
| 26 | 6.2 | Drafting Supplies | BI01010001010000000000000515BI0100001137 | 96 | Nos |
|---|
| 27 | 6.3 | Computer Running Costs | BI01010001010000000000000515BI0100001138 | 96 | Nos |
|---|
| 28 | 6.4 | Domestic and International Communication | BI01010001010000000000000515BI0100001139 | 96 | Nos |
|---|
| 29 | 7 | Office Furniture and Equipment (Rental) : \nThe cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc. | BI01010001010000000000000515BI0100001140 | 1 | LS |
|---|
| 30 | 8 | Reports and Document Printing | BI01010001010000000000000515BI0100001141 | | |
|---|
| 31 | 8.1 | Monthly reports (Design and Construction) rate as per Copy:\n[Total Number of Copies are 198 = No. of Report (96) x No.of Copies for Report (3)]\n | BI01010001010000000000000515BI0100001142 | 288 | Nos |
|---|
| 32 | 8.2 | Half yearly Reports, rate as per Copy:\n[Total Number of Copies are 09 = No. of Report (3) x No.of Copies for Report (3)] | BI01010001010000000000000515BI0100001143 | 9 | Nos |
|---|
| 33 | 8.3 | Various other reports as provided in the Concession Agreement such as Completion Report | BI01010001010000000000000515BI0100001144 | 1 | LS |
|---|
| 34 | 9 | Road Survey Equipment (Rate as per 1 Km) | BI01010001010000000000000515BI0100001145 | | |
|---|
| 35 | 9.1 | Surface defects detection and roughness measurement using Network Survey Vehicle\n[Total Quantity is 568 = No. of time survey to be conducted (8) x Km (34)]\n | BI01010001010000000000000515BI0100001146 | 272 | Nos |
|---|
| 36 | 9.2 | Pavement strength measurement using FWD\n[Total Quantity is 284 = No. of time survey to be conducted (4) x Km (34)] | BI01010001010000000000000515BI0100001147 | 136 | Nos |
|---|
| 37 | 9.3 | Bridge inspection using Mobile Bridge Inspection Unit\n[Total Quantity is 568 = No. of time survey to be conducted (8) x Km (34)] | BI01010001010000000000000515BI0100001148 | 272 | Nos |
|---|
| 38 | 9.4 | Road signs inspection using Retro Reflectometer\n[Total Quantity is 568 = No. of time survey to be conducted (8) x Km (34)] | BI01010001010000000000000515BI0100001149 | 272 | Nos |
|---|
| 39 | 10 | Contigencies \nA fixed amount of Indian Rupees ONE MILLION (Rs 10 Lack) shall be included in the Financial Proposal | BI01010001010000000000000515BI0100001150 | 1 | Nos |
|---|