| 1 | 1 | Demolishing cement concrete manually / by mechanical means including disposal of material with all lifts and upto 50 m lead etc. complete as per direction of the Engineer- in-charge:- Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | BI01010001010000000000000515BI0100001112 | 43.8 | Cum |
|---|
| 2 | 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed | BI01010001010000000000000515BI0100001113 | 174.09 | Cum |
|---|
| 3 | 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete | BI01010001010000000000000515BI0100001114 | 147.2 | Cum |
|---|
| 4 | 4 | ItemNo-4 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: \n1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded well burnt brick aggregate 20 mm nominal size)\n | BI01010001010000000000000515BI0100001115 | 27.96 | Cum |
|---|
| 5 | 5 | Providing & fixing fly proof wire gauze to windows, clerestory windows & doors with M.S. Flat 15x3 mm and nuts & bolts complete. Galvanised M.S. Wire gauze with 0.63 mm dia wire and 1.4 mm aperture on both sides | BI01010001010000000000000515BI0100001116 | 3.6 | Sqm |
|---|
| 6 | 6 | Providing and laying flat brick flooring in cement mortar including cement slurry etc. complete. In cement mortar 1 : 4 ( 1 cement : 4 fine sand ) | BI01010001010000000000000515BI0100001117 | 37 | Sqm |
|---|
| 7 | 7 | Half brick masonry work with first class bricks in foundation and plinth including cost of all materials as required complete:- In cement mortar 1:4 ( 1 cement : 4 fine sand | BI01010001010000000000000515BI0100001118 | 22.2 | Sqm |
|---|
| 8 | 8 | Labour for Shifting of Seed bags from seed processing plant to Seed Go-down & Seed Go-down to seed processing plant. | BI01010001010000000000000515BI0100001119 | 300 | bag |
|---|
| 9 | 9 | Providing and laying cement concrete 1:2:4 (1 cement : 2 fine sand : 4 graded well burnt brick aggregate) flooring finished with a floating coat of neat cement including cement slurry, rounding of edges and strips etc. complete. 40 mm thick with 20 mm well burnt brick aggregate | BI01010001010000000000000515BI0100001120 | 648 | Sqm |
|---|