| 1 | 1 | Operation and maintenance services for 2x100 TR, 2x200 TR air cooled central air conditioning system plant for Navigation Complex & Calobration Test Facility for 03 (Three) Shifts all the day round the clock including Sundays and Holidays by deploying 09 (Nine) manpower only. | Item1 | 12 | Month |
|---|
| 2 | 2 | Comprehensive Annual maintenance for the following Ductable, Hi-wall split & window type A/C's as per details mentioned below.\nDNEC, RCI, HYDERABAD:-\na) 8.5 TR Ductable Split type A/C's - 3 Nos\nb) 5.5 TR Ductable Split type A/C's - 1 Nos\nc) 2.0 TR Capacity Split type A/C's - 22 Nos\nd) 2.0 TR Capacity Cassettes type A/C's - 3 Nos\ne) 2.5 TR Capacity cassettes type A/C's - 4 Nos\nf) 1.5 TR Capacity Split type A/C's - 3 Nos\ng) Water Coolers - 12 Nos\nh) 16 HP VRF System - 2 Nos\nj) Voltage Stabilizers - 1 Lot\n | Item2 | 12 | Month |
|---|
| 3 | 3 | A) Calibration and Test Facility:- | | | |
|---|
| 4 | 3.01 | Periodical maintenance of AHU Cooling coil using chemicals and high Pressure water jet pump and Servicing of other rotating equipments including lubrication, replacement/repair of blower belts, motor bearings etc.,complete all as recommended by OEM/Engineer-In-Charge. | Item3 | 7 | Job |
|---|
| 5 | 4 | Periodical Check and Servicing of 100TR Air cooled, Screw Type Chilling Unit including replacement of oil filter, strainer,piston orings,modular valves,refrigrant and all other consumables etc.,complete all as recommended by OEM/Engineer-In-Charge. . | Item4 | 2 | Job |
|---|
| 6 | 5 | Periodical Services as recommended by the OEM including necessary cleaning consumables,screws,bolts & nuts,bearings,fan belts,electrical component etc complete all as directed and prior approval by engineer-in-charge. | | | |
|---|
| 7 | 5.01 | Chilled water pump | Item5 | 3 | Nos |
|---|
| 8 | 5.02 | water generator 90 KW | Item6 | 1 | Nos |
|---|
| 9 | 5.03 | Hot water pump | Item7 | 2 | Nos |
|---|
| 10 | 6 | B) Navigation Complex:-\nPeriodical Maintenance of AHU Cooling coil using chemicals and high Pressure water jet pump and Servicing of other rotating equipments including lubrication, replacement/repair of blower belts, motor bearings etc.,complete all as recommended by OEM/Engineer-In-Charge. | Item8 | 32 | Job |
|---|
| 11 | 7 | Periodical Check and Servicing of 200TR Air cooled Reciprocating type chiller including replacement of oil filter, strainer,piston orings,modular valves,refrigrant and all other consumables etc.,complete all as recommended by OEM/Engineer-In-Charge. | Item9 | 2 | Job |
|---|
| 12 | 8 | Periodical Services as recommended by the OEM including necessary cleaning consumables,screws,bolts & nuts,bearings,fan belts,electrical component etc complete all as directed and prior approval by engineer-in-charge. | | | |
|---|
| 13 | 8.01 | Chilled water pump | Item10 | 3 | Set |
|---|
| 14 | Total in Figures | | | | |
|---|