| 1 | 1 | a) DT Structure, DP STR and HT/LT OH Line Erection | | | |
|---|
| 2 | 2 | Supply of PSC Pole 9 m to work site including all other incidental charges. | | 3 | Each |
|---|
| 3 | 3 | Supply of Base Plate to work site including all other incidental charges. | | 3 | Each |
|---|
| 4 | 4 | Supply of Transformer structure materials Including of structure clamps (11419+4868) to work site including all other incidental charges. | | 2 | Set |
|---|
| 5 | 5 | Supply of 11 KV AB switch with PT insulator to work site including all other incidental charges. | | 2 | Set |
|---|
| 6 | 6 | Supply of 11 KV HG fuse set 2259+774 ((70+59)*6) to work site including all other incidental charges. | | 2 | Set |
|---|
| 7 | 7 | Supply of 11 KV LAs to work site including all other incidental charges. | | 6 | E |
|---|
| 8 | 8 | Structure Earthing at work site including all other incidental charges. | | 2 | E |
|---|
| 9 | 9 | Supply of Stay set to work site including all other incidental charges. | | 6 | Set |
|---|
| 10 | 10 | Supply of Guy insulators to work site including all other incidental charges. | | 6 | E |
|---|
| 11 | 11 | Supply of Jumpering materials (25Sq mm single core PVC cable 25 mts, 240 sqmm lug 30nos) (43*25)+(27*30) to work site including all other incidental charges. | | 2 | Set |
|---|
| 12 | 12 | Supply of Concreting per structure to work site including all other incidental charges. | | 2 | Loc |
|---|
| 13 | 13 | Supply of LT. LAs to work site including all other incidental charges. | | 6 | E |
|---|
| 14 | 14 | Supply of L.T. open type fuse units to work site including all other incidental charges. | | 4 | Set |
|---|
| 15 | 15 | Supply of LT fixed capacitor 2x9 KVAR unit to work site including all other incidental charges. | | 2 | Set |
|---|
| 16 | 16 | Supply of Bolts, Nuts and Binding wire etc to work site including all other incidental charges. | | 4 | Each |
|---|
| 17 | 17 | b)DP Structure Erection (with 2 AB Switches) - 2 Nos | | 1 | Each |
|---|
| 18 | 18 | Supply of PSC Pole 9 m to work site including all other incidental charges. | | 4 | Each |
|---|
| 19 | 19 | Supply of Base Plate to work site including all other incidental charges. | | 4 | Each |
|---|
| 20 | 20 | Supply of Double channel cross arm to work site including all other incidental charges. | | 2 | Each |
|---|
| 21 | 21 | Supply of 11 KV AB Switch with PT Insulator to work site including all other incidental charges. | | 4 | Set |
|---|
| 22 | 22 | Supply of Cross bracing set to site including all other incidental charges. | | 2 | Set |
|---|
| 23 | 23 | Structure Earthing at work site including all other incidental charges. | | 2 | Loc |
|---|
| 24 | 24 | Structure concreting work site including all other incidental charges. | | 2 | Loc |
|---|
| 25 | 25 | Supply of Stayset Complete with Guy insulators to work site including all other incidental charges. | | 8 | Set |
|---|
| 26 | 26 | Supply of Stay clamp pair (RCC 9.14m pole) to work site including all other incidental charges. | | 8 | E |
|---|
| 27 | 27 | Supply of Back clamp (RCC 9.14m Pole) to work site including all other incidental charges. | | 4 | E |
|---|
| 28 | 28 | Supply of Jumpering Materials to work site including all other incidental charges. | | 2 | Set |
|---|
| 29 | 29 | Supply of 11 KV LAs to work site including all other incidental charges. | | 6 | E |
|---|
| 30 | 30 | Supply of Bolt, Nuts and Binding wire etc, to work site including all other incidental charges. | | 4 | Loc |
|---|
| 31 | 31 | d)HT U.G.Cable Erection | | 1 | Each |
|---|
| 32 | 32 | Supply of 11KV, 3x300sq.mm XLPE cable to work site including all other incidental charges. | | 0.297 | Km |
|---|
| 33 | 33 | Supply of 11KV 3x300sq.mm Outdoor Type cable Termination Kit (HS type) to work site including all other incidental charges. | | 5 | E |
|---|
| 34 | 34 | Supply of 11KV 3x300sa.mm cable indoor Type cable Termination Kit (HS type) to work site including all other incidental charges. | | 1 | E |
|---|
| 35 | 35 | Supply of UG cable earthing by coil earthing to work site including all other incidental charges. | | 2 | LS |
|---|
| 36 | 36 | Supply of Spl clamp cable fixing to work site including all other incidental charges. | | 10 | E |
|---|
| 37 | 37 | Supply of Bolt, Nuts and Binding wire etc., to work site including all other incidental charges. | | 3 | Loc |
|---|
| 38 | 38 | e)LT U.G.Cable Erection | | 1 | Each |
|---|
| 39 | 39 | Supply of 6way Pillar Box to work site including all other incidental charges. | | 2 | E |
|---|
| 40 | 40 | Supply of 4 way Pillar Box FRB to work site including all other incidental charges. | | 15 | E |
|---|
| 41 | 41 | Supply of 4x240 Sq.mm LT UG cable to work site including all other incidental charges. | | 0.343 | Km |
|---|
| 42 | 42 | Supply of 4x120 Sq.mm LT UG cable to work site including all other incidental charges. | | 0.411 | Km |
|---|
| 43 | 43 | Supply of 4x25 Sq.mm LT UG cable to work site including all other incidental charges. | | 0.9 | Km |
|---|
| 44 | 44 | Supply of 2x16 Sq.mm LT UG cable to work site including all other incidental charges. | | 0.35 | Km |
|---|
| 45 | 45 | Supply of 240 Sq.mm Aluminiun lugs to work site including all other incidental charges. | | 84 | E |
|---|
| 46 | 46 | Supply of 120 Sq.mm Aluminiun lugs to work site including all other incidental charges. | | 72 | E |
|---|
| 47 | 47 | Supply of 25 Sq.mm Aluminiun lugs to work site including all other incidental charges. | | 144 | E |
|---|
| 48 | 48 | Supply of 16 Sq.mm Aluminiun lugs to work site including all other incidental charges. | | 28 | E |
|---|
| 49 | 49 | Pillar Box earthing by coil earthing at work site including all other incidental charges. | | 17 | LS |
|---|
| 50 | 50 | Supply of 4Spl Clamp cable fixing to work site including all other incidental charges. | | 8 | Km |
|---|
| 51 | 51 | Supply of Bolt, Nuts and Binding wire etc. to work site including all other incidental charges. | | 20 | Loc |
|---|
| 52 | 52 | c)HT/LT OH Feeder Erection | | 1 | Each |
|---|
| 53 | 53 | Supply of \"V\" X arm 3'-6\" to work site including all other incidental charges. | | 9 | Each |
|---|
| 54 | 54 | Supply of H T TI.Fitting to work site including all other incidental charges. | | 9 | Each |
|---|
| 55 | 55 | Supply of 11 KV Strain disc set with M/P to work site including all other incidental charges. | | 12 | Set |
|---|
| 56 | 56 | Supply of 11 KV Pin insulator with pin to work site including all other incidental charges. | | 21 | Each |
|---|
| 57 | 57 | Supply of ACSR Conductor 7/3.35mm to work site including all other incidental charges. | | 0.17 | KM |
|---|
| 58 | 58 | Supply of Stayset Complete with Guy sackle and G.I wire to work site including all other incidental charges. | | 1 | Set |
|---|
| 59 | 59 | Supply of Stay Clamp (RCC 9.14 mtr) work site including all other incidental charges. | | 15 | Each |
|---|
| 60 | 60 | Supply of Back clamp (RCC 9.14mt) to work site including all other incidental charges. | | 12 | Each |
|---|
| 61 | 61 | Supply of LT 3 phase x arm to work site including all other incidental charges. | | 2 | Each |
|---|
| 62 | 62 | Supply of LT 1 phase x arm to work site including all other incidental charges. | | 1 | Each |
|---|
| 63 | 63 | Supply of LT Shackle with M/P to work site including all other incidental charges. | | 8 | Each |
|---|
| 64 | 64 | Supply of Aluminium knobto work site including all other incidental charges. | | 2 | Each |
|---|
| 65 | 65 | Supply of Bolt, Nuts to work site including all other incidental charges. | | 2 | Loc |
|---|
| 66 | 66 | Labour for LT U.G Cable Erection (Actual cost worked by civil Estimate with applicable Tax) | | 1 | For new materials from stores (For item -d) |
|---|
| 67 | 67 | Labour for LT U.G Cable Erection (Actual cost worked by civil Estimate with applicable Tax) | | 1 | For new materials from stores (For item -e) |
|---|
| 68 | 68 | Labour for Transport charges |(for loading, unloading, transport @ 5% and erection of materials at new location @ 10% ) Total 15% (15/100x323788)-OH items only | | 1 | For new materials from stores (For item a to c) |
|---|
| 69 | 69 | Labour & Transpot charges for reerection of dismantled old materials at new site (for loading from old site, unloading at new site @10% and erection @10% at new location Total 20% (credit -A) | | 1 | for materials dismantled at old site and reused at new site - (A) |
|---|
| 70 | 70 | Dismantling, loading, unloading and transport charges for the reusable materials diamantled and to be sevoluted to stores | | 1 | (B) |
|---|
| 71 | 71 | Releasing and reerection of service connection charges, 3phase, 36xRs.120) | | 1 | (B) |
|---|
| 72 | 72 | Releasing and reerection of service connection charges, 1phase, 14xRs.80) | | 1 | (B) |
|---|
| 73 | 73 | Transport charges on the scrap materials to be devoluted to stores | | 1 | (D) |
|---|
| 74 | 74 | Calculation of SubTotal, GST and Total Amount carried out by system automatically | | | |
|---|
| 75 | 75 | Basic cost of value put to tender as per estimate | | 1 | (A) |
|---|
| 76 | 76 | Add GST at 18% | | 1 | (B) |
|---|
| 77 | 77 | Total Value put to Tender | | 1 | (A+B) |
|---|
| 78 | 78 | Differnce Amount (Excess/Less) | | 1 | (D) |
|---|
| 79 | 79 | Quoted Amount (Basic Rate Only) | | 1 | (E) |
|---|
| 80 | 80 | Add GST at 18% of of Quoted Amount | | 1 | (F) |
|---|
| 81 | 81 | Total Value of Quoted Amount Including 18% of GST | | 1 | (E+F) |
|---|