| 1 | 1 | Labour portion | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking. | BI01010001010000000000000515BI0100001113 | 0.8 | km |
|---|
| 3 | 1.02 | Dismantling (without damage) one AB switch from existing structure and bringing back to section store. | BI01010001010000000000000515BI0100001114 | 1 | No |
|---|
| 4 | 1.03 | Dismantling one Channel cross arm from existing DP structure, and bringing back to section store. | BI01010001010000000000000515BI0100001115 | 6 | No |
|---|
| 5 | 1.04 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | BI01010001010000000000000515BI0100001116 | 16 | No |
|---|
| 6 | 1.05 | Dismantling one damaged 11kV TW/RSJ/Rail pole after disconnecting stays, strut etc. and stacking the same. | BI01010001010000000000000515BI0100001117 | 1 | No |
|---|
| 7 | 1.06 | Loading HT PSC pole to Hand cart from the stacking place and unloading the same at work site. | BI01010001010000000000000515BI0100001117 | 2 | No |
|---|
| 8 | 1.07 | Transporting one HT PSC pole by Hand cart (limited to 4km). | BI01010001010000000000000515BI0100001117 | 1 | P/km |
|---|
| 9 | 1.08 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. | BI01010001010000000000000515BI0100001117 | 1 | No |
|---|
| 10 | 1.09 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. | BI01010001010000000000000515BI0100001117 | 4 | No |
|---|
| 11 | 1.1 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. | BI01010001010000000000000515BI0100001117 | 4 | No |
|---|
| 12 | 1.11 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. | BI01010001010000000000000515BI0100001117 | 0.01 | km |
|---|
| 13 | 1.12 | Additional rate for providing one disc set on any type of HT pole for making cut point. | BI01010001010000000000000515BI0100001117 | 6 | No |
|---|
| 14 | 1.13 | Fitting one set AB switch and giving connection | BI01010001010000000000000515BI0100001117 | 1 | No |
|---|
| 15 | 1.14 | Excavation of cable trench in all classes of soil and backfilling after laying of cable (excluding laying of cable). | BI01010001010000000000000515BI0100001117 | 2500 | m |
|---|
| 16 | 1.15 | Laying HT XLPE UG cable (of sizes beyond 3x185 sqmm and upto and incl. 3x300 sqmm) as per specification excl. excavation and backfilling. | BI01010001010000000000000515BI0100001117 | 2500 | m |
|---|
| 17 | 1.16 | Doing straight joint on cables of sizes beyond 3x185 sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally as per specification. | BI01010001010000000000000515BI0100001117 | 9 | No |
|---|
| 18 | 1.17 | Doing one cable end termination on cables of sizes beyond 3x185 sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally. | BI01010001010000000000000515BI0100001117 | 2 | No |
|---|
| 19 | 1.18 | Mounting the cable ends of all sizes upto and incl. 3x300 sq mm with special type cable clamps incl. cost of extra materials if needed and giving necessary connections. | BI01010001010000000000000515BI0100001117 | 2 | No |
|---|
| 20 | 1.19 | Additional rate for excavating trench on tarred/concrete surface of specified size. | BI01010001010000000000000515BI0100001122 | 200 | m |
|---|
| 21 | 1.2 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. | BI01010001010000000000000515BI0100001123 | 2 | No |
|---|
| 22 | 1.21 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. | BI01010001010000000000000515BI0100001124 | 1 | No |
|---|