Tender For Development Of Ros Chitradurga Distric, Hyderabad-Telangana
Tender Notice
22384367
Tender For Development Of Ros Chitradurga Distric
Tender
Indian
Telangana
Hyderabad
18-11-2019
Tender Details
Tender For Development Of Ros Chitradurga District- Surface dressing of the ground including removing small plants, bushes ,vegetation (dia less than 4) and making surface levelled and disposal of rubbish outside HPCLs premises to an unobjectionable place, as directed by the Engineer in Charge. , Excavation for foundation upto required depth below ground level in any type of soil except hard rock . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, foundation, trenches/plinth beam etc compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCLs premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths.EXCAVATION IN EARTH BETWEEN 1.5 TO 3 M,Excavation for foundation upto required depth below ground level in any type of soil except hard rock . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCLs premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. EXCAVATION IN EARTH BETWEEN 3 TO 4.5 , Excavation for foundation upto required depth below existing ground level up to 1.5 m. depth in concrete road by chiselling / pneumatic drilling . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the job to restore the original state of the ground and disposal of surplus excavated earth within/outside HPCLs premises to an unobjectionable place, as directed by the Engineer in Charge including curing, watering and compaction and complete . The measurement of the excavation would be based on actual depth of excavation., Excavation for foundation upto required in hard rock and excavation shall be done by chiselling / pneumatic drilling or Blasting. Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, trenches/plinth beam etc compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCLs premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. EXCAVATION IN HARD ROCK 1.5 mts- 3.0 mts
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.