tender for Turnkey Solution For Cctv Surveillance At Three Complexes And Range Road In Chandipur , video surveillance infrastructure , 2 mp network ptz dome camera with power supply ( input 100-300v ac ) and horizontal pole mount kit with cable harness , 2mp network bullet camera , automatic number plate recognition camera , 6 tb hard disk , video management system , 55 inch display , workstation computer , 40 feet 3 leg self supporting tower with enclosure , 7 meters octagonal gi pole for camera and junction box mounting , 5 meters gi octagonal pole , 2 meters gi octagonal pole , communication infrastructure , 48 core single mode multi-tube steel tape armoured optical fibre cable , 24 core single mode multi-tube steel tape armoured optical fibre cable , 12 core fully loaded fibre distribution unit with pigtails , 48 core fully loaded fibre distribution unit with pigtails , sc-pc to lc fibre patch cord , 32 fo port layer 3 switch loaded with 1000 base-lx fibre sfp ( 10 km reachability ) , 1gbps ethernet fibre sfp module to support 40 km , 1gbps ethernet copper sfp module to support 100 km , 10 / 100 / 1000 mbps industrial grade ethernet media converter , ip-66 outdoor rack of size 6u , ip-66 outdoor rack of size 12u , hdpe pipe ( 40 mm diameter ) , pvc conduit ( 25 mm ) , dwc pipe ( 50 mm diameter ) , outdoor armoured 4-pair category 6 cable , sip telephone with poe support , power infrastructure , single phase , 230 vac , 50hz , 03 kva ups with battery backup 03 hours , single phase , 230 vac , 50hz , 01 kva ups with battery backup 03 hours , 6 sq . mm 3 core pvc insulated armored copper conductor power cable , ip67 pvc db with transparent cover along with 10 amps , 2 pole mcb , 6a 5 pin socket ( 03 nos ) , light indicator , power board consisting of 10 a , 2 pole mcb , 6a 5 pin socket ( 05 nos ) , 01 indicator , solar pv module 24 v 260 watt , solar off grid inverter 3 . 5 kva , 150 ah solar battery for 5 hrs backup time , mounting structure for pv module , battery rack and interconnecting cables , i ) 2200 mtrs of digging of hard / soft soil at 6ft depth through hdd machine including excavation and refilling of earth for fiber cable , splicing and termination at all camera locations and display locations ii ) 13000 mtrs of laying power cable by hdd method at 6 ft depth through pipe and termination , installation of camera , solar power infrastructure and connecting all communication equipments with existing cctv network , testing and documentation of whole project , training for 05 days at itr chandipur , 03 years on-site warranty service and technical support