| 1 | 1 | a) DT Structure, DP STR and HT/LT OH Line Erection | | | |
|---|
| 2 | 2 | a) Supply of RSJ joist 30' Pole to work site including all other incidental charges. | | 13 | Each |
|---|
| 3 | 3 | b) Supply of PSC Pole 9 m to work site including all other incidental charges. | | 8 | Each |
|---|
| 4 | 4 | Supply of Base Plates to work site including all other incidental charges. | | 21 | E |
|---|
| 5 | 5 | Supply of Transformer structure materials Including of structure clamps (11419+4868) to work site including all other incidental charges. | | 6 | Set |
|---|
| 6 | 6 | Supply of11 KV AB switch with PT insulator to work site including all other incidental charges. | | 19 | Set |
|---|
| 7 | 7 | Supply of 11 KV HG fuse set 2259+774 ((70+59)*6) to work site including all other incidental charges. | | 6 | Set |
|---|
| 8 | 8 | Supply of Jumpering materials (25 sq mm single core PVC cable 25 mts, 240 sqmm lug 30nos) (43*25)+(27*30) to work site including all other incidental charges. | | 13 | Set |
|---|
| 9 | 9 | Supply of L.T. LAs to work site including all other incidental charges. | | 15 | E |
|---|
| 10 | 10 | Supply of 11 KV LAs to work site including all other incidental charges. | | 27 | E |
|---|
| 11 | 11 | Supply of L.T open type fuse units | | 10 | Set |
|---|
| 12 | 12 | Supply of LT fixed capacitor 2x9 KVAR unit to work site including all other incidental charges. | | 5 | Set |
|---|
| 13 | 13 | a) Supply of Double channel cross arm to work site including all other incidental charges. | | 7 | Each |
|---|
| 14 | 14 | b) Supply of Cross bracing set to work site including all other incidental charges. | | 7 | Set |
|---|
| 15 | 15 | Supply of Structure Earthing to work site including all other incidental charges. | | 13 | Loc |
|---|
| 16 | 16 | Supply of Structure concreting to work site including all other incidental charges. | | 13 | Loc |
|---|
| 17 | 17 | Supply of Stayset Complete with Guy insulators to work site including all other incidental charges. | | 43 | Set |
|---|
| 18 | 18 | Supply of Stay clamp pair (PSC 9m pole) to work site including all other incidental charges. | | 25 | E |
|---|
| 19 | 19 | Supply of Stay clamp pair (RSJ pole) to work site including all other incidental charges. | | 26 | E |
|---|
| 20 | 20 | Supply of Back clamp (PSC 9m pole) to work site including all other incidental charges. | | 34 | E |
|---|
| 21 | 21 | Supply of Back clamp (RSJ pole) to work site including all other incidental charges. | | 26 | Each |
|---|
| 22 | 22 | Supply of \"V\" X arm 3'-6\" to work site including all other incidental charges. | | 21 | Each |
|---|
| 23 | 23 | Supply of H T TI.Fitting to work site including all other incidental charges. | | 21 | Each |
|---|
| 24 | 24 | Supply of Guarding cross arm to work site including all other incidental charges. | | 4 | Each |
|---|
| 25 | 25 | Supply of Tapping channel cross arm to work site including all other incidental charges. | | 10 | Each |
|---|
| 26 | 26 | Supply of LT 3 phase x arm to work site including all other incidental charges. | | 12 | Each |
|---|
| 27 | 27 | Supply of LT 1 phase x arm to work site including all other incidental charges. | | 4 | Each |
|---|
| 28 | 28 | Supply of 11 KV Strain disc set with M/P to work site including all other incidental charges. | | 33 | Set |
|---|
| 29 | 29 | Supply of 11KV Pin insulator with pin to work site including all other incidental charges. | | 57 | Each |
|---|
| 30 | 30 | Supply of ACSR Conductor 7/4.04 mm to work site including all other incidental charges. | | 2.1 | KM |
|---|
| 31 | 31 | Supply of ACSR Conductor 7/3.35 mm to work site including all other incidental charges. | | 0.743 | KM |
|---|
| 32 | 32 | Supply of LT Shackle with M/P to work site including all other incidental charges. | | 22 | Each |
|---|
| 33 | 33 | Supply of LT Pin insulator with GI Pin to work site including all other incidental charges. | | 24 | Each |
|---|
| 34 | 34 | Supply of Aluminium knob to work site including all other incidental charges. | | 6 | Each |
|---|
| 35 | 35 | Supply of GI Wire No.8 to work site including all other incidental charges. | | 40 | Kg |
|---|
| 36 | 36 | Supply of Bolt,Nuts and Binding wire etc. to work site including all other incidental charges. | | 18 | Loc |
|---|
| 37 | 37 | b) HT U.G. Cable Erection | | | |
|---|
| 38 | 38 | a) Supply of 11 KV, 3X300 Sq.mm X LPE cable to work site including all other incidental charges. | | 1.038 | Km |
|---|
| 39 | 39 | b) Supply of 11KV 3X300 Sq.mm straight joining Kit (HS type) to work site including all other incidental charges. | | 1 | E |
|---|
| 40 | 40 | Supply of 11 KV 3X300 Sq.mm Outdoor Type cable Termination Kit (HS type) to work site including all other incidental charges. | | 16 | E |
|---|
| 41 | 41 | Supply of UG Cable earthing by coil earthing to work site including all other incidental charges. | | 9 | LS |
|---|
| 42 | 42 | Supply of Spl Clamp cable fixing to work site including all other incidental charges. | | 32 | E |
|---|
| 43 | 43 | Supply of Bolt,Nuts and binding wire etc. to work site including all other incidental charges. | | 8 | Loc |
|---|
| 44 | 44 | c) LT U.G.Cable Erection | | | |
|---|
| 45 | 45 | Supply of 6 way Pillar Box to work site including all other incidental charges. | | 3 | E |
|---|
| 46 | 46 | Supply of 4 Way Pillar Box FRB to work site including all other incidental charges. | | 11 | E |
|---|
| 47 | 47 | Supply of 4X240 Sq.mm LT UG cable to work site including all other incidental charges. | | 0.407 | Km |
|---|
| 48 | 48 | Supply of 4X120 Sq.mm LT UG cable to work site including all other incidental charges. | | 0.206 | Km |
|---|
| 49 | 49 | Supply of 4X25 Sq.mm LT UG cable to work site including all other incidental charges. | | 0.6 | Km |
|---|
| 50 | 50 | Supply of 2X16 Sq.mm LT UG cable to work site including all other incidental charges. | | 0.275 | Km |
|---|
| 51 | 51 | Supply of 240 Sq.mm Aluminiun lugs to work site including all other incidental charges. | | 96 | E |
|---|
| 52 | 52 | Supply of 120 Sq.mm Aluminiun lugs to work site including all other incidental charges. | | 36 | E |
|---|
| 53 | 53 | Supply of 25 Sq.mm Aluminiun lugs to work site including all other incidental charges. | | 96 | E |
|---|
| 54 | 54 | Supply of 16 Sq.mm Aluminiun lugs to work site including all other incidental charges. | | 22 | E |
|---|
| 55 | 55 | Supply of Pillar Box earthing by coil earthing to work site including all other incidental charges. | | 14 | LS |
|---|
| 56 | 56 | Supply of SPL Clamp cable fixing to work site including all other incidental charges. | | 10 | E |
|---|
| 57 | 57 | Supply of Bolt,Nuts and Binding wire etc. to work site including all other incidental charges. | | 18 | Loc |
|---|
| 58 | 58 | a) Labour for HT U.G Cable Erection (Actual cost worked by civil Estimate with applicable Tax) | | 1 | For new materials from stores (For item -b) |
|---|
| 59 | 59 | b) Labour for LT U.G Cable Erection (Actual cost worked by civil Estimate with applicable Tax) | | 1 | For new materials from stores (For item -c) |
|---|
| 60 | 60 | Labour for Transport charges |(for loading, unloading, transport 2 5% and erection of materials at new location @ 10% ) Total 15% (15/100x1279396)-OH items only | | 1 | For new materials from stores (For item -a) |
|---|
| 61 | 61 | Labour & Transpot charges for reerection of dismantled old materials at new site (for loading from old site, unloading at new site @10% and erection @10% at new location Total 20% (credit -A) | | 1 | for materials dismantled at old site and reused at new site - (A) |
|---|
| 62 | 62 | Dismantling, loading, unloading and transport charges for the reusable materials diamantled and to be sevoluted to stores | | 1 | C |
|---|
| 63 | 63 | Releasing and reerection of service connection charges, 3phase, 24xRs.120) | | 1 | C |
|---|
| 64 | 64 | Releasing and reerection of service connection charges, 1phase, 11xRs.80) | | 1 | C |
|---|
| 65 | 65 | Transport charges on the scrap materials to be devoluted to stores | | 1 | C |
|---|
| 66 | 66 | Calculation of SubTotal, GST and Total carried out by system automatically | | | |
|---|
| 67 | 67 | Sub Total Amount for above all items (excluding GST) | | 1 | subtotal |
|---|
| 68 | 68 | GST 18% for above SubTotal Amount | | 1 | gst |
|---|