Oustsourcing To Maintenance And Operation Of Central Type Ac Plants At Hanger No 1 To 6 And Hanger No 7 And 8 19 And 20 And Lca At Ins Kalinga Visakhaptnam , Out Sourcing For Manning And Operation Of Central Type Water Cooled Screw Chillers Ac Plant 3X180 Tr Capacity With 2 Units Running At A Time And 1 Unit Standby Attached To Hanger Installed At Hangar Nos . 1 To 6 For Manning And Operation By Providing One Refrigeration Mechanic Per Each Shift Of 8 Hours , 3 Shifts Per Day Round The Clock Including Sundays And Holidays , Comprising Of Microprocessor Controlled Chillers-03 Nos . , Chilled Water Pumps-03 Nos . , Condenser Pumps-03 Nos . , Ahus In Hangar 2 To 5 Each Hangar-01 No . And Hangae No . 1 & Hangar No . 6 Each-02 Nos . , Voltage Stabiliser 600 Kva-01 No . , Cooling Towers-02 Nos . , Supply And Return Air Ducting , Lt Electrical Panel-01 No . , Chilled Water Line And All Other Accessories Complete All As Specified And As Directed By The Engineer-In-Charge . , Out Sourcing For Manning And Operation Of Chilled Water Type Ac Plant 3X80 Tr Capacity With 2 Units Running At A Time And 1 Unit Standby Installed At Hangar Nos . 7 & 8 For Manning And Operation By Providing One Refrigeration Mechanic Per Each Shift Of 8 Hours , 3 Shifts Per Day Round The Clock Including Sundays And Holidays , Comprising Of Microprocessor Controlled Chillers-03 Nos . , Chilled Water Pumps-03 Nos . , Condenser Pumps-03 Nos . , Ahus-02 Nos . , Voltage Stabiliser 300 Kva-01 No . , Cooling Towers-01 No . , Supply And Return Air Ducting , Lt Electrical Panel-01 No . , Chilled Water Line And All Other Accessories Complete All As Specified And As Directed By The Engineer-In-Charge . , Out Sourcing For Manning And Operation To Chilled Water Type Ac Plant 3X60 Tr Capacity With 2 Units Running At A Time And 1 Unit Standby Installed At Hangar Nos . 19 & 20 For Manning And Operation By Providing One Refrigeration Mechanic Per Each Shift Of 8 Hours , 3 Shifts Per Day Round The Clock Including Sundays And Holidays , Comprising Of Microprocessor Controlled Chillers-03 Nos . , Chilled Water Pumps-03 Nos . , Condenser Pumps-03 Nos . , Ahus-02 Nos . , Voltage Stabiliser 200 Kva-01 No . , Cooling Towers-01 No . , Supply And Return Air Ducting , Lt Electrical Panel-01 No . , Chilled Water Line And All Other Accessories Complete All As Specified And As Directed By The Engineer-In-Charge . , Out Sourcing For Manning And Operation Of Chilled Water Type Ac Plant 3X35 Tr Capacity With 2 Units Running At A Time And 1 Unit Standby Installed At Lca For Manning And Operation By Providing One Refrigeration Mechanic Per Each Shift Of 8 Hours , In Two Shifts Per Day Including Sundays And Holidays , Comprising Of Microprocessor Controlled Chillers-03 Nos . , Csu Unit-1 No . , Chilled Water Pumps-03 , Condenser Pumps-03 Nos . , Ahus-01 Nos . , Voltage Stabiliser 100 Kva-01 No . , Cooling Tower-01 No . , Supply And Return Air Ducting , Lt Electrical Panel-01No . , Chilled Water Line And All Other Accessories Complete All As Specified And As Directed By The Engineer-In-Charge . Notes For Item Nos . 1 To 4:1 . Wage Paid By The Contractor To The Persons Employed Shall Not Be Less Than The Minimum Wages Fixed By State/Central Government From Time To Time Whichever Is Higher . The Payment Shall Be Made To The Workers Through A Nationalised Bank And The Bank Statement Of Fair Wages As Per Minimum Labour Wages As Mentioned Above Shall Be Submitted Along With The Rars/Fb For Payments . 2 . The Contractor Shall Be Responsible For The Epf , Esi , Bonus , Safety Etc . And Insurance Of All Trademen Employed By Him As Per Existing Labour Rules/Acts/Regulations . , Supply Only Compressor Oil Complete All As Specified And Directed By The Engineer-In-Charge . Make: Capila-D/Sheetal -80 , Supply Only Gas 134 A Complete All As Specified And As Directed By The Engineer-In-Charge . Make: Mafran/Floran , M&L For Taking Down The Defective Electric Motor Of Capacity 12 Hp , 415 Volts , 50 Hz , 3 Phase By Dismantling The Electric Connections , Removing The Motor From The Base Foundation By Decoupling The Pump , Transporting To The Workshope , Dismantling The Burnt Out Copper Winding From Motor/Stator And Rewinding The Rotor/Stator With Same Type Of Super Enamelled Copper Wire Of Same Guage And With Necessassry Insulating Material , Warnishing Etc . And Re-Assemble The Motor Completely , Transporting Back To The Site And Alignment With The Pump/ Compressor/Blower With All Electric Connections Including Testing And Commissioning Complete All As Specified And As Directed By The Engineer-In-Charge . Notes:1 . Burnt Out Removed Winding Wire Will Be The Property Of Contractor And Credited Through Schedule Of Credit . 2 . Bearings Will Be Measured And Paid Separately Under Relevant Items Of Sch A . , S&F In Repairs , Bearing Suitable For 12 Hp Motor Complete All As Specified And As Directed By The Engineer-In-Charge . , S&F In Repairs , Shaft Suitable For 12 Hp Motor Complete All As Specified And As Directed By The Engineer-In-Charge . , S&F In Repairs , Coupling Suitable For 12 Hp Motor Complete All As Specified And As Directed By The Engineer-In-Charge .