| 1 | 1 | Dismantling of all damaged existing insulators of DSL & fixing lof new insulators with proper alignments of DSL angles at its old place and new extended position (Converter Bay & Slag Granulation Plant.) | Item-905520403 | 70 | NUMBER |
|---|
| 2 | 2 | Fixing of insulators with proper size high tensils hex head bolt nuts with double flat washers making proper holes etc., in WMI Cranes. | Item-905520434 | 70 | NUMBER |
|---|
| 3 | 3 | MATERIALS HANDLING: Dismantling & shifting of materials such as motors, electrical panels, & any other electrical accessories as and from shop to individual plants after its repair at Work Shop Weight above 100 Kg. to 500 Kg. | Item-905520614 | 26 | NUMBER |
|---|
| 4 | 4 | MATERIALS HANDLING: Dismantling & shifting of materials such as motors, electrical panels, & any other electrical accessories as and from shop to individual plants after its repair at Work Shopweight above 500 Kg. to 1000 Kg. | Item-905520615 | 15 | NUMBER |
|---|
| 5 | 5 | MATERIALS HANDLING: Dismantling & shifting of materials such as motors, electrical panels, & any other electrical accessories as and from shop to individual plants after its repair at Work Shop Weight above 5 Kg to 25 Kg. | Item-905520611 | 35 | NUMBER |
|---|
| 6 | 6 | MATERIALS HANDLING: Dismantling & shifting of materials such as motors, electrical panels, & any other electrical accessories as and from shop to individual plants after its repair at Work Shop Weight above 25 Kg. to 50 Kg. | Item-905520612 | 75 | NUMBER |
|---|
| 7 | 7 | MATERIALS HANDLING: Dismantling & shifting of materials such as motors, electrical panels, & any other electrical accessories as and from shop to individual plants after its repair at Work Shop Weight above 50 Kg. to 100 Kg. | Item-905520613 | 48 | NUMBER |
|---|
| 8 | 8 | Opening of Smelter ESP inspection doors, cleaning of accumulated dust from the collector plates & discharge electrodes. After still air testing, boxing up of the doors providing asbestos rope & pasting lagging compound, for ESP's | Item-905520701 | 120 | NUMBER |
|---|
| 9 | 9 | Opening of SAP Mist ESP inspection doors,cleaning of all the insulators, alignment of the electrodes or its lbottom guides and any other job of the related components. | Item-905520702 | 50 | NUMBER |
|---|
| 10 | 10 | Mannual rapping of Drier & Furnace ESP as and when required | Item-905520703 | 120 | NUMBER |
|---|
| 11 | 11 | Replacement of Smelter ESP geared motor/speed reducer along with their sprokets/driving chain/shafts/any other accessories & their alignments (as and when required) for both side rapping and electrodes hammer system. | Item-905520704 | 39 | NUMBER |
|---|
| 12 | 12 | Replacement/repair/refixing of ESP electrodes, bottom channels, guides etc. in Furnace/Drier/ Mist ESP as and when required including gas cutting, welding jobs. | Item-905520705 | 20 | NUMBER |
|---|
| 13 | 13 | Replacement/repair/refixing of Tumbler hammers/envils and its accessories. in Furnace/Drier Mist ESP as and when required including gas cutting, welding jobs. | Item-905520706 | 30 | NUMBER |
|---|
| 14 | 14 | Replacement/repair/refixing of Drop rod & their guide pipes in Furnace/Drier/ Mist ESP as and when required including gas cutting, welding jobs. | Item-905520707 | 15 | NUMBER |
|---|
| 15 | 15 | Replacement/repair/refixing of Socket insulators/cone insulator support insulators of Drier/furnace and Mist ESP as and when required including gas cutting, welding jobs. | Item-905520708 | 40 | NUMBER |
|---|
| 16 | 16 | Replacement/repair/refixing of Socket insulators of Drier/ Mist ESP & inspection doors and their hinges as and when required including gas cutting, welding jobs. | Item-905520709 | 10 | NUMBER |
|---|
| 17 | 17 | Replacement/refixing and proper alignment of ESP dust dislodging mechanism of furnace & Drier ESP. | Item-905520710 | 10 | NUMBER |
|---|
| 18 | 18 | Fabrication, erection & fixing of the structure, platform, cable tray, column etc including pipe line jobs. Necessary steel shall be supplied by HCL/ICC and necessary painting is under the scope of Contractor. | Item-905520802 | 8 | Metric Ton |
|---|
| 19 | 19 | Repair, alignment of 75 x 75 x 8 mm DSL power angle/ 50 x 50 x 6 mm cross angle (DSL & WMI Crane) and their fixing with proper fish plate joints etc. | Item-905521651 | 197 | METRE |
|---|