Renovation Repairs And Installation Of Venturi Scrubber And Allied Jobs To 150 Kg Per Hr Capacity Alpha Therm Make Incinerator Plant At Skims Soura, Skims Soura-Jammu And Kashmir
TDR : 22155067
Tender Notice
BOQ
Expired
Skims Soura
Jammu And Kashmir
Renovation Repairs And Installation Of Venturi Scrubber And Allied Jobs To 150 Kg Per Hr Capacity Alpha Therm Make Incinerator Plant At Skims Soura
Name of Work: Renovation/Repairs and installation of Venturi Scrubber & allied jobs to 150 kg/hr capacity Alpha Therm Make Incinerator plant at SKIMS Soura
Sl.No.
Item Description
Item Code / Make
Quantity
Units
1
1
Supply installation testing and commissioning of high pressure jet venture scrubber MOS SS3161 Droplet separator and integral Recirculation tank MOC, Mild steel rubber lined as per the techanical Specification on annexure (B) to this NIT.
A. Oxygen system:- Supply, installation, testing and commissioning of 10+10 size manifold extendable type complete with middle frame with chain for individual cylinder (bulk cylinder D-type) along with Non-Return Valves for every cylinder and copper tail pipes as per the Specification on annexure (B) to this NIT.
1
Job
2
2
Providing, Fixing, testing and commissioning of burner block (one ruuning & one stand by) for the 150Kg/hr Alpha therm incinerator as per the techanical Specification on annexure (B) to this NIT.
Supply, installation, testing and commissioning of Fully Automatic Digital Gas Control Panel for Oxygen with inlet for Liquid Oxygen Tank as per NFPA 99 as per the Specification on annexure (B) to this NIT.
2
Job
3
3
Dismantling of all the loosened up fire bricks/refractory, removing and shifting of broken bricks to nearby municipality container/dumping yard as per the techanical Specification on annexure (B) to this NIT.
Supply, installation, testing and commissioning of 6 + 6 Cylinders Emergency Oxygen Manifold with two stage High flow rate regulator with NRV for every cylinder and copper tail pipes as per the Specification on annexure (B) to this NIT. \n.
2
m²
4
4
Painting to all parts of the Alfa Therm make incinerator plant as per the techanical Specification on annexure (B) to this NIT.
1
job
5
5
Fabrication/fitting of 6 mm thick ms top cover cap for the chimney fitted with ms circular ring with locking arrangements as per the techanical Specification on annexure (B) to this NIT.
1
job
6
6
Overhauling of air blower run by 15 H.P electrical motor at incinerator plant as per the techanical Specification on annexure (B) to this NIT. \n
1
job
7
7
Complete overhauling of burner block 5E- 10 C ,6.2 Ost & its control system as per the techanical Specification on annexure (B) to this NIT. \n
Providing and fitting of Terminal Units (Gas Outlets) with probes/Adaptors as per NFPA,\nCSA UL Listed as per NFPA 99, as per the Specification on annexure (B) to this NIT.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.