| 1 | 1 | Excavation of Pole/Stay pits | | | |
|---|
| 2 | 2 | Excavation of pole pit up to 27”(8.0m) pole | | 100 | Nos. |
|---|
| 3 | 3 | Stay bit 4.5” to 5” depth | | 50 | Nos. |
|---|
| 4 | 4 | Excavation of pole pit up to 9.14 Mtr pole | | 40 | Nos. |
|---|
| 5 | 5 | Erection of Poles | | | |
|---|
| 6 | 6 | RCC poles/Metal pole up to 8.00m (27’) | | 100 | Nos. |
|---|
| 7 | 7 | RCC poles/Metal pole up to 9.14.m(30’) | | 40 | Nos. |
|---|
| 8 | 8 | Erection of stay set complete | | 50 | Nos. |
|---|
| 9 | 9 | Fixing of line materials | | | |
|---|
| 10 | 10 | HT V Cross arms / Channel Cross arms / Guarding Cross arm 4 1/2 | | 40 | Nos. |
|---|
| 11 | 11 | LT 3 Phase cross arm | | 80 | Nos. |
|---|
| 12 | 12 | LT single Phase cross arm | | 50 | Nos. |
|---|
| 13 | 13 | HT / LT TI Fitting | | 40 | Nos. |
|---|
| 14 | 14 | Fixing of HT Pin Insulators (11/22/33KV) | | 120 | Nos. |
|---|
| 15 | 15 | Fixing of HT 11KV stain disc | | 50 | Nos. |
|---|
| 16 | 16 | Fixing of LT Pin Insulators | | 500 | Nos. |
|---|
| 17 | 17 | Fixing of LT Shackle | | 300 | Nos. |
|---|
| 18 | 18 | Fixing of knob | | 110 | Nos. |
|---|
| 19 | 19 | Paving and Stringing of conductor | | | |
|---|
| 20 | 20 | Paving of conductor ,Stringing , binding , Jumpering etc..7/4.09mm ACSR | | 50 | Nos. |
|---|
| 21 | 21 | 7/3.35mm ACSR 7/3.15mmAAAC | | 350 | Nos. |
|---|
| 22 | 22 | 7/2.59mm ACSR & 7/2.50mm AAAC | | 1200 | Nos. |
|---|
| 23 | 23 | Structure Erection | | | |
|---|
| 24 | 24 | Structure poles ,fixing of top channel seating | | 6 | Nos. |
|---|
| 25 | 25 | Transporting of poles | | | |
|---|
| 26 | 26 | Transporting of poles from road side to pole pit up to 27” | | 100 | Nos. |
|---|
| 27 | 27 | Transporting of poles from road side to pole pit 30”and above including RSJ pole | | 40 | Nos. |
|---|
| 28 | 28 | DP Erection | | | |
|---|
| 29 | 29 | Erection of D.P structure with AB switch top channel , cross bracing ,Earthing, Painting, providing stay and pole concreting | | 1 | Nos. |
|---|
| 30 | 30 | Guarding Arrangements | | | |
|---|
| 31 | 31 | Flat Guarding including fixing of 2 Nos. Cross arms | | 20 | Nos. |
|---|
| 32 | 32 | HT Guarding | | 10 | Nos. |
|---|
| 33 | 33 | Service Connections | | | |
|---|
| 34 | 34 | Releasing of Single Phase service wire and refixing | | 400 | Nos. |
|---|
| 35 | 35 | Releasing of Three Phase service wire and refixing | | 100 | Nos. |
|---|
| 36 | 36 | Releasing of grills from RCC Poles | | | |
|---|
| 37 | 37 | Releasing of grills from RCC Poles | | 50 | Nos. |
|---|
| 38 | 38 | Dismandling of Line Materials | | | |
|---|
| 39 | 39 | Dismandling of pole (9.14mtr) | | 10 | Nos. |
|---|
| 40 | 40 | Dismandling of pole (7.5mtr & 8mtr) | | 50 | Nos. |
|---|
| 41 | 41 | Dismandling of HT Pin Insulator | | 90 | Nos. |
|---|
| 42 | 42 | Dismandling of HT TI Fitting | | 20 | Nos. |
|---|
| 43 | 43 | Dismandling of 11 KV disc | | 60 | Nos. |
|---|
| 44 | 44 | Dismandling of 3 PH X arm | | 50 | Nos. |
|---|
| 45 | 45 | Dismandling of Tapping X arm, V X arm & Guarding X arm | | 20 | Nos. |
|---|
| 46 | 46 | Dismandling of 1 PH X arm | | 25 | Nos. |
|---|
| 47 | 47 | Dismandling of Alu Knob | | 50 | Nos. |
|---|
| 48 | 48 | Dismandling of LT pin Insulator | | 250 | Nos. |
|---|
| 49 | 49 | Dismandling of LT Shackle Insulator | | 180 | Nos. |
|---|
| 50 | 50 | Stay set complete dismandling | | 25 | Nos. |
|---|
| 51 | 51 | Dismandling of 7/4.09mm ACSR | | 30 | Nos. |
|---|
| 52 | 52 | 7/3.35mm ACSR 7/3.15mmAAAC Dismandling | | 150 | Nos. |
|---|
| 53 | 53 | 7/2.59mm ACSR & 7/2.50mm AAAC Dismandling | | 250 | Nos. |
|---|
| 54 | 54 | Re-Stringing of Lines | | | |
|---|
| 55 | 55 | Re-Stringing of LT Lines for all sizes of conductor | | 180 | Nos. |
|---|
| 56 | 56 | Re-Stringing of HT 7/2.59 | | 50 | Nos. |
|---|
| 57 | 57 | Re-Stringing of HT 7/3.35 | | 50 | Nos. |
|---|
| 58 | 58 | Re-Stringing of HT 7/4.09 | | 30 | Nos. |
|---|
| 59 | 59 | HVDS Structure Erection | | | |
|---|
| 60 | 60 | Structure poles ,fixing of top channel seating | | 5 | Nos. |
|---|
| 61 | 61 | Loading of poles | | | |
|---|
| 62 | 62 | Loading of poles up to 27” | | 100 | Nos. |
|---|
| 63 | 63 | Loading of Poles upto 30”and above including RSJ pole | | 40 | Nos. |
|---|
| 64 | 64 | Unloading of poles | | | |
|---|
| 65 | 65 | Unloading of poles up to 27” | | 100 | Nos. |
|---|
| 66 | 66 | Unloading of Poles upto 30”and above including RSJ pole | | 40 | Nos. |
|---|
| 67 | 67 | Transporting of poles | | | |
|---|
| 68 | 68 | Transporting of poles up to 27” from road side to pole pit | | 100 | Nos. |
|---|
| 69 | 69 | Transporting of Poles upto 30”and above including RSJ pole from road side to pole pit | | 40 | Nos. |
|---|
| 70 | 70 | Loading / Unloading of Transformer | | | |
|---|
| 71 | 71 | Loading / Unloading of transformer up to 200KVA | | 4 | Nos. |
|---|
| 72 | 72 | Erection of transformer up to 200 KVA | | 4 | Nos. |
|---|
| 73 | 73 | Drilling of Holes | | | |
|---|
| 74 | 74 | Drilling of Holes in channel only etc ¾ & 1” per hole | | 100 | Nos. |
|---|
| 75 | 75 | Transporting of Materials | | | |
|---|
| 76 | 76 | Transporting of Materials / Conductors and other materials (excluding loading & unloading charges) | | 5 | Nos. |
|---|
| 77 | 77 | Service Erected | | | |
|---|
| 78 | 78 | Erection of street light including fixture fitting | | 20 | Nos. |
|---|
| 79 | 79 | Erection of street light service | | 10 | Nos. |
|---|
| 80 | 80 | Fixing of SV/MV lamp fittings | | 10 | Nos. |
|---|
| 81 | 81 | Fixing of new CFL / LED lamp fittings | | 50 | Nos. |
|---|
| 82 | 82 | Service Dismandling | | | |
|---|
| 83 | 83 | Dismandling of street light including fixture fitting | | 20 | Nos. |
|---|
| 84 | 84 | Dismandling of street light service | | 10 | Nos. |
|---|
| 85 | 85 | Dismandling of SV/MV lamp fittings | | 10 | Nos. |
|---|
| 86 | 86 | Dismandling of new CFL / LED lamp fittings | | 50 | Nos. |
|---|
| 87 | 88 | E.S.I. @3.25 % should be Entered by the Bidder | | 1 | Percentage |
|---|
| 88 | 89 | G.S.T. @18% should be Entered by the Bidder | | 1 | Percentage |
|---|