| 1 | 10 | ARC FOR TRANSPORTATION OF MATERIALS | Item 00010 | | |
|---|
| 2 | 10.001 | TRANSPORTATION OF INDUSTRIAL GOODS FROM PARADIP REFINERY TO OTHER LOCATION AS PER BELOW AND VICE-VERSA ON PART/TRANS-SHIPMENT BASIS UP TO 3 MT OF CONSIGNMENT WEIGHT. MINIMUM CHARGEABLE WEIGHT IS 200 KGS. | Item 10.10 | | |
|---|
| 3 | 10.002 | TO PANIPAT ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1796 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 18 DAYS. | Item 10.20 | 3000 | KG |
|---|
| 4 | 10.003 | FROM PANIPAT ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1796 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 18 DAYS. | Item 10.30 | 3000 | KG |
|---|
| 5 | 10.004 | TO BARODA ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1658 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 18 DAYS. | Item 10.40 | 3000 | KG |
|---|
| 6 | 10.005 | FROM BARODA ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1658 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 18 DAYS. | Item 10.50 | 3000 | KG |
|---|
| 7 | 10.006 | TO BARAUNI ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 800 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.60 | 3000 | KG |
|---|
| 8 | 10.007 | FROM BARAUNI ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 800 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.70 | 3000 | KG |
|---|
| 9 | 10.008 | TO GUWAHATI/BOGAINGAON ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1453 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 16 DAYS. | Item 10.80 | 3000 | KG |
|---|
| 10 | 10.009 | FROM GUWAHATI/BOGAINGAON ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1453 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 16 DAYS. | Item 10.90 | 3000 | KG |
|---|
| 11 | 10.01 | TO CHENNAI ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1333 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 14 DAYS. | Item 10.100 | 3000 | KG |
|---|
| 12 | 10.011 | FROM CHENNAI ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1333 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 14 DAYS. | Item 10.110 | 3000 | KG |
|---|
| 13 | 10.012 | TO HALDIA ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 435 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 8 DAYS. | Item 10.120 | 3000 | KG |
|---|
| 14 | 10.013 | FROM HALDIA ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 435 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 8 DAYS. | Item 10.130 | 3000 | KG |
|---|
| 15 | 10.014 | TO DIGBOI ON PART/TRANS-SHIPMENT | Item 10.140 | 3000 | KG |
|---|
| 16 | 10.015 | FROM DIGBOI ON PART/TRANS-SHIPMENT | Item 10.150 | 3000 | KG |
|---|
| 17 | 10.016 | TO MATHURA ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1565 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 19 DAYS. | Item 10.160 | 3000 | KG |
|---|
| 18 | 10.017 | FROM MATHURA ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1565 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 19 DAYS. | Item 10.170 | 3000 | KG |
|---|
| 19 | 10.018 | TO FARIDABAD ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1705 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 18 DAYS. | Item 10.180 | 3000 | KG |
|---|
| 20 | 10.019 | FROM FARIDABAD ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1705 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 18 DAYS. | Item 10.190 | 3000 | KG |
|---|
| 21 | 10.02 | TO HYDERABAD ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1157 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.200 | 3000 | KG |
|---|
| 22 | 10.021 | FROM HYDERABAD ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1157 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.210 | 3000 | KG |
|---|
| 23 | 10.022 | TO MUMBAI ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1733 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 18 DAYS. | Item 10.220 | 3000 | KG |
|---|
| 24 | 10.023 | FROM MUMBAI ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1733 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 18 DAYS. | Item 10.230 | 3000 | KG |
|---|
| 25 | 10.024 | TO BANGALORE ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1552 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 18 DAYS. | Item 10.240 | 3000 | KG |
|---|
| 26 | 10.025 | FROM BANGALORE ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1552 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 18 DAYS. | Item 10.250 | 3000 | KG |
|---|
| 27 | 10.026 | TO JAMSHEDPUR ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 360 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 5 DAYS. | Item 10.260 | 3000 | KG |
|---|
| 28 | 10.027 | FROM JAMSHEDPUR ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 360 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 5 DAYS. | Item 10.270 | 3000 | KG |
|---|
| 29 | 10.028 | TO BHOPAL ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1260 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 15 DAYS. | Item 10.280 | 3000 | KG |
|---|
| 30 | 10.029 | FROM BHOPAL ON PART/TRANS-SHIPMENT BASIS. APPROX DISTANCE - 1260 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 15 DAYS. | Item 10.290 | 3000 | KG |
|---|
| 31 | 10.03 | TRANSPORTATION OF INDUSTRIAL GOODS FROM PARADIP REFINERY TO OTHER LOCATION AS PER BELOW AND VICE-VERSA THROUGH 7.5 MT CAPACITY VEHICLE ON FULL TRUCK LOAD BASIS. TRANS-SHIPMENT NOT ALLOWED. | Item 10.300 | | |
|---|
| 32 | 10.031 | TO PANIPAT THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1796 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.310 | 5 | EA |
|---|
| 33 | 10.032 | FROM PANIPAT THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1796 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.320 | 5 | EA |
|---|
| 34 | 10.033 | TO BARODA THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1658 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.330 | 5 | EA |
|---|
| 35 | 10.034 | FROM BARODA THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1658 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.340 | 5 | EA |
|---|
| 36 | 10.035 | TO BARAUNI THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 800 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 6 DAYS. | Item 10.350 | 3 | EA |
|---|
| 37 | 10.036 | FROM BARAUNI THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 800 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 6 DAYS. | Item 10.360 | 3 | EA |
|---|
| 38 | 10.037 | TO GUWAHATI/BOGAINGAON THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1453 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 10 DAYS. | Item 10.370 | 1 | EA |
|---|
| 39 | 10.038 | FROM GUWAHATI/BOGAINGAON THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1453 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 10 DAYS. | Item 10.380 | 1 | EA |
|---|
| 40 | 10.039 | TO CHENNAI THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1333 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 8 DAYS. | Item 10.390 | 1 | EA |
|---|
| 41 | 10.04 | FROM CHENNAI THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1333 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 8 DAYS. | Item 10.400 | 1 | EA |
|---|
| 42 | 10.041 | TO HALDIA THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 435 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 2 DAYS. | Item 10.410 | 3 | EA |
|---|
| 43 | 10.042 | FROM HALDIA THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 435 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 2 DAYS. | Item 10.420 | 3 | EA |
|---|
| 44 | 10.043 | TO DIGBOI THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1936 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.430 | 1 | EA |
|---|
| 45 | 10.044 | FROM DIGBOI THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1936 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.440 | 1 | EA |
|---|
| 46 | 10.045 | TO MATHURA THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1565 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 11 DAYS. | Item 10.450 | 3 | EA |
|---|
| 47 | 10.046 | FROM MATHURA THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1565 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 11 DAYS. | Item 10.460 | 3 | EA |
|---|
| 48 | 10.047 | TO FARIDABAD THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1705 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.470 | 1 | EA |
|---|
| 49 | 10.048 | FROM FARIDABAD THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1705 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.480 | 1 | EA |
|---|
| 50 | 10.049 | TO HYDERABAD THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1157 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 7 DAYS. | Item 10.490 | 1 | EA |
|---|
| 51 | 10.05 | FROM HYDERABAD THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1157 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 7 DAYS. | Item 10.500 | 1 | EA |
|---|
| 52 | 10.051 | TO MUMBAI THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1733 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 13 DAYS. | Item 10.510 | 1 | EA |
|---|
| 53 | 10.052 | FROM MUMBAI THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1733 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 13 DAYS. | Item 10.520 | 1 | EA |
|---|
| 54 | 10.053 | TO BANGALORE THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1552 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 10 DAYS. | Item 10.530 | 1 | EA |
|---|
| 55 | 10.054 | FROM BANGALORE THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1552 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 10 DAYS. | Item 10.540 | 1 | EA |
|---|
| 56 | 10.055 | TO JAMSHEDPUR THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 360 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 3 DAYS. | Item 10.550 | 1 | EA |
|---|
| 57 | 10.056 | FROM JAMSHEDPUR THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 360 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 3 DAYS. | Item 10.560 | 1 | EA |
|---|
| 58 | 10.057 | TO BHOPAL THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1260 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 10 DAYS. | Item 10.570 | 1 | EA |
|---|
| 59 | 10.058 | FROM BHOPAL THROUGH 7.5 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1260 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 10 DAYS. | Item 10.580 | 1 | EA |
|---|
| 60 | 10.059 | TRANSPORTATION OF INDUSTRIAL GOODS FROM PARADIP REFINERY TO OTHER LOCATION AS PER BELOW AND VICE-VERSA THROUGH 19 MT CAPACITY VEHICLE ON FULL TRUCK LOAD BASIS. TRANS-SHIPMENT NOT ALLOWED. | Item 10.590 | | |
|---|
| 61 | 10.06 | TO PANIPAT THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1796 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.600 | 5 | EA |
|---|
| 62 | 10.061 | FROM PANIPAT THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1796 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.610 | 5 | EA |
|---|
| 63 | 10.062 | TO BARODA THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1658 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.620 | 5 | EA |
|---|
| 64 | 10.063 | FROM BARODA THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1658 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.630 | 5 | EA |
|---|
| 65 | 10.064 | TO BARAUNI THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 800 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 6 DAYS. | Item 10.640 | 3 | EA |
|---|
| 66 | 10.065 | FROM BARAUNI THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 800 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 6 DAYS. | Item 10.650 | 3 | EA |
|---|
| 67 | 10.066 | TO GUWAHATI/BOGAINGAON THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1453 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 10 DAYS. | Item 10.660 | 1 | EA |
|---|
| 68 | 10.067 | FROM GUWAHATI/BOGAINGAON THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1453 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 10 DAYS. | Item 10.670 | 1 | EA |
|---|
| 69 | 10.068 | TO CHENNAI THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1333 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 8 DAYS. | Item 10.680 | 1 | EA |
|---|
| 70 | 10.069 | FROM CHENNAI THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1333 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 8 DAYS. | Item 10.690 | 1 | EA |
|---|
| 71 | 10.07 | TO HALDIA THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 435 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 2 DAYS. | Item 10.700 | 3 | EA |
|---|
| 72 | 10.071 | FROM HALDIA THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 435 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 2 DAYS. | Item 10.710 | 3 | EA |
|---|
| 73 | 10.072 | TO DIGBOI THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1936 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.720 | 1 | EA |
|---|
| 74 | 10.073 | FROM DIGBOI THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1936 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.730 | 1 | EA |
|---|
| 75 | 10.074 | TO MATHURA THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1565 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 11 DAYS. | Item 10.740 | 3 | EA |
|---|
| 76 | 10.075 | FROM MATHURA THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1565 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 11 DAYS. | Item 10.750 | 3 | EA |
|---|
| 77 | 10.076 | TO FARIDABAD THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1705 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.760 | 1 | EA |
|---|
| 78 | 10.077 | FROM FARIDABAD THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1705 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.770 | 1 | EA |
|---|
| 79 | 10.078 | TO HYDERABAD THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1157 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 7 DAYS. | Item 10.780 | 1 | EA |
|---|
| 80 | 10.079 | FROM HYDERABAD THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1157 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 7 DAYS. | Item 10.790 | 1 | EA |
|---|
| 81 | 10.08 | TO MUMBAI THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1733 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 13 DAYS. | Item 10.800 | 1 | EA |
|---|
| 82 | 10.081 | FROM MUMBAI THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1733 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 13 DAYS. | Item 10.810 | 1 | EA |
|---|
| 83 | 10.082 | TO BANGALORE THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1552 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 15 DAYS. | Item 10.820 | 1 | EA |
|---|
| 84 | 10.083 | FROM BANGALORE THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1552 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 15 DAYS. | Item 10.830 | 1 | EA |
|---|
| 85 | 10.084 | TO JAMSHEDPUR THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 360 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 3 DAYS. | Item 10.840 | 1 | EA |
|---|
| 86 | 10.085 | FROM JAMSHEDPUR THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 360 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 3 DAYS. | Item 10.850 | 1 | EA |
|---|
| 87 | 10.086 | FROM BHOPAL THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1260 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 13 DAYS. | Item 10.860 | 1 | EA |
|---|
| 88 | 10.087 | TO BHOPAL THROUGH 19 MT VEHICLE ON FULL TRUCK LOAD BASIS. APPROX DISTANCE- 1260 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 13 DAYS. | Item 10.870 | 1 | EA |
|---|
| 89 | 10.088 | TRANSPORTATION OF INDUSTRIAL GOODS FROM PARADIP REFINERY TO OTHER LOCATION AS PER BELOW AND VICE-VERSA THROUGH 24 MT CAPACITY TRAILOR ON FULL TRAILOR LOAD BASIS. TRANS-SHIPMENT NOT ALLOWED. | Item 10.880 | | |
|---|
| 90 | 10.089 | TO PANIPAT THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1796 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.890 | 5 | EA |
|---|
| 91 | 10.09 | FROM PANIPAT THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1796 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.900 | 5 | EA |
|---|
| 92 | 10.091 | TO BARODA THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1658 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.910 | 5 | EA |
|---|
| 93 | 10.092 | FROM BARODA THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1658 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.920 | 5 | EA |
|---|
| 94 | 10.093 | TO BARAUNI THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 800 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 6 DAYS. | Item 10.930 | 3 | EA |
|---|
| 95 | 10.094 | FROM BARAUNI THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 800 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 6 DAYS. | Item 10.940 | 3 | EA |
|---|
| 96 | 10.095 | TO GUWAHATI/BOGAINGAON THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1453 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 10 DAYS. | Item 10.950 | 1 | EA |
|---|
| 97 | 10.096 | FROM GUWAHATI/BOGAINGAON THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1453 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 10 DAYS. | Item 10.960 | 1 | EA |
|---|
| 98 | 10.097 | TO CHENNAI THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1333 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 8 DAYS. | Item 10.970 | 1 | EA |
|---|
| 99 | 10.098 | FROM CHENNAI THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1333 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 8 DAYS. | Item 10.980 | 1 | EA |
|---|
| 100 | 10.099 | TO HALDIA THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 435 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 2 DAYS. | Item 10.990 | 3 | EA |
|---|
| 101 | 10.1 | FROM HALDIA THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 435 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 2 DAYS. | Item 10.1000 | 3 | EA |
|---|
| 102 | 10.101 | TO DIGBOI THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1936 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.1010 | 1 | EA |
|---|
| 103 | 10.102 | FROM DIGBOI THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1936 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.1020 | 1 | EA |
|---|
| 104 | 10.103 | TO MATHURA THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1565 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 11 DAYS. | Item 10.1030 | 3 | EA |
|---|
| 105 | 10.104 | FROM MATHURA THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1565 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 11 DAYS. | Item 10.1040 | 3 | EA |
|---|
| 106 | 10.105 | TO FARIDABAD THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1705 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.1050 | 1 | EA |
|---|
| 107 | 10.106 | FROM FARIDABAD THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1705 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 12 DAYS. | Item 10.1060 | 1 | EA |
|---|
| 108 | 10.107 | TO HYDERABAD THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1157 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 7 DAYS. | Item 10.1070 | 1 | EA |
|---|
| 109 | 10.108 | FROM HYDERABAD THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1157 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 7 DAYS. | Item 10.1080 | 1 | EA |
|---|
| 110 | 10.109 | TO MUMBAI THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1733 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 13 DAYS. | Item 10.1090 | 1 | EA |
|---|
| 111 | 10.11 | FROM MUMBAI THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1733 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 13 DAYS. | Item 10.1100 | 1 | EA |
|---|
| 112 | 10.111 | TO BANGALORE THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1552 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 11 DAYS. | Item 10.1110 | 1 | EA |
|---|
| 113 | 10.112 | FROM BANGALORE THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1552 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 11 DAYS. | Item 10.1120 | 1 | EA |
|---|
| 114 | 10.113 | TO JAMSHEDPUR THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 360 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 3 DAYS. | Item 10.1130 | 1 | EA |
|---|
| 115 | 10.114 | FROM JAMSHEDPUR THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 360 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 3 DAYS. | Item 10.1140 | 1 | EA |
|---|
| 116 | 10.115 | TO BHOPAL THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1260 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 11 DAYS. | Item 10.1150 | 1 | EA |
|---|
| 117 | 10.116 | FROM BHOPAL THROUGH 24 MT TRAILOR ON FULL TRAILOR LOAD BASIS. APPROX DISTANCE- 1260 KM. MAXIMUM VEHICLE TRANSIT TIME ALLOWED IS 11 DAYS. | Item 10.1160 | 1 | EA |
|---|
| 118 | 20 | DEPLOYMENT OF ADDITIONAL DRIVER & GPS | Item 00020 | | |
|---|
| 119 | 20.1 | DEPLOYMENT OF ONE ADDITIONAL DRIVER & INSTALLATION OF GPS SYSTEM OVER THE VEHICLE ,,,,,,,, | Item 20.10 | | |
|---|
| 120 | 20.2 | DEPLOYMENT OF ONE ADDITIONAL DRIVER TO COVER DISTANCE OF MORE THAN 350 KM AVERAGE PER DAY OF 24 HRS | Item 20.20 | 1 | TAG |
|---|
| 121 | 20.3 | DEPLOYMENT OF GPS SYSTEM OVER THE VEHICLE CARRYING IMPORTANT CONSIGNMENTS FOR ONLINE TRACKING DURING WHOLE TRIP. UOM 'EA' CORRESPONDS TO 'PER TRIP PER VEHICLE'. | Item 20.30 | 1 | EA |
|---|