| 1 | 1 | Excavation of all type soil | 1 | 6000 | Meter |
|---|
| 2 | 2 | Excavation of asphalt road | 2 | 200 | Meter |
|---|
| 3 | 3 | cutting of RCC/PCC & reinstatement | 3 | 300 | Cubic Foot |
|---|
| 4 | 4 | supply of river stone less sand | 4 | 6000 | Meter |
|---|
| 5 | 5 | supply & lying of bricks | 5 | 6000 | Meter |
|---|
| 6 | 6 | 200 /100/50.laying of U.G cable laying | 6 | 9000 | Meter |
|---|
| 7 | 7 | 20/10/5 pr U.G cable laying | 7 | 8000 | Meter |
|---|
| 8 | 8 | eathernet cable laying | 8 | 500 | Meter |
|---|
| 9 | 9 | Concealed conduiting 3/4' or 1' dia pvc | 9 | 150 | Meter |
|---|
| 10 | 10 | 50 / 20/10 Pr.laying of pvc cable | 10 | 4000 | Meter |
|---|
| 11 | 11 | 5/2/1 pr. layong of pvc cable | 11 | 20000 | Meter |
|---|
| 12 | 12 | Eathernet cable laying | 12 | 8000 | Meter |
|---|
| 13 | 13 | Dismantling of all type cables | 13 | 10000 | Meter |
|---|
| 14 | 14 | Dismantling of 50 pr or more D.P box | 14 | 50 | NO |
|---|
| 15 | 15 | Dismantling of 20 pr. or less D.p.box | 15 | 200 | NO |
|---|
| 16 | 16 | Concealing of iron box 4x4\" size | 16 | 25 | NO |
|---|
| 17 | 17 | Concealing of iron box6x4\" size | 17 | 25 | NO |
|---|
| 18 | 18 | 5'x5' white bakelite (hylem) | 18 | 800 | NO |
|---|
| 19 | 19 | 7'x5' white bakelite (hylem) | 19 | 400 | NO |
|---|
| 20 | 20 | Laying of G.I pipes 1/2 dia size | 20 | 100 | Meter |
|---|
| 21 | 21 | Laying of G.I pipes 1\" size | 21 | 150 | Meter |
|---|
| 22 | 22 | Laying of G.I pipes 1.5\" size | 22 | 50 | Meter |
|---|
| 23 | 23 | Laying of G.I pipes 2\" dia size | 23 | 150 | Meter |
|---|
| 24 | 24 | Laying of G.I pipes 4\" dia size | 24 | 50 | Meter |
|---|
| 25 | 25 | Erection of telephone cabinet | 25 | 20 | NO |
|---|
| 26 | 26 | Undre ground/tray OFC laying | 26 | 200 | Meter |
|---|
| 27 | 27 | Laying 50pr &more armored/pvc on tray | 27 | 8000 | Meter |
|---|
| 28 | 28 | Laying 20 pr.& less armored/pvc on tray | 28 | 10000 | Meter |
|---|
| 29 | 29 | Laying of 50 pr. & mofe PVC on wall | 29 | 6000 | Meter |
|---|
| 30 | 30 | Laying of 20 pr. & less PVC on wall | 30 | 6000 | Meter |
|---|
| 31 | 31 | Laying of 3/4' pvc pipe | 31 | 6000 | Meter |
|---|
| 32 | 32 | Laying of 1' pvc pipe | 32 | 4000 | Meter |
|---|
| 33 | 33 | Laying of 1/2 casing capping pipe | 33 | 5000 | Meter |
|---|
| 34 | 34 | Laying of 1' casing capping pipe | 34 | 2000 | Meter |
|---|
| 35 | 35 | Laying of 2' casing capping pipe | 35 | 500 | Meter |
|---|
| 36 | 36 | Supply & fixing og plug socket(ISI mark) | 36 | 1500 | NO |
|---|
| 37 | 37 | supply and fixing of celling ros | 37 | 50 | NO |
|---|
| 38 | 38 | Supply & fixing of 4x4 wooden box | 38 | 1000 | NO |
|---|
| 39 | 39 | Supply & fixing of 4x6' wooden box | 39 | 500 | NO |
|---|
| 40 | 40 | Supply & fixing of 4x4' pvc box | 40 | 200 | NO |
|---|
| 41 | 41 | Supply & fixing of 4x6' pvc box | 41 | 100 | NO |
|---|
| 42 | 42 | Installation of 100 Pr or above DP box | 42 | 50 | NO |
|---|
| 43 | 43 | Installation of 50 pair DP box | 43 | 100 | NO |
|---|
| 44 | 44 | Installation of 20 pair DP box | 44 | 150 | NO |
|---|
| 45 | 45 | Installation of 10/5 pair DP box | 45 | 200 | NO |
|---|
| 46 | 46 | Dressing of 100 pr or above cable | 46 | 40 | NO |
|---|
| 47 | 47 | Dressing of 50 pr cable | 47 | 40 | NO |
|---|
| 48 | 48 | Dressing of 20 pr cable | 48 | 100 | NO |
|---|
| 49 | 49 | Dressing of 10/5 pr cable | 49 | 150 | NO |
|---|
| 50 | 50 | Fixing of 200/100/50 pr canopy | 50 | 50 | NO |
|---|
| 51 | 51 | Fixing of 20/10/5 pr canopy | 51 | 50 | NO |
|---|
| 52 | 52 | Jointing of armoured cabl 50 PR. & more. | 52 | 100 | NO |
|---|
| 53 | 53 | Jointing of armoured cables20 pr& less | 53 | 150 | NO |
|---|
| 54 | 54 | Termination of telephone cables | 54 | 5000 | Each |
|---|
| 55 | 55 | Replacement of telephone cabinet | 55 | 20 | NO |
|---|
| 56 | 56 | Painting of telephone cabinet & DO Boxes | 56 | 1500 | Square Foot |
|---|
| 57 | 57 | Cleaning of telephone instruments | 57 | 13000 | NO |
|---|
| 58 | 58 | Installation of telephone cable marker | 58 | 50 | NO |
|---|
| 59 | 59 | Laying of OFC on wall | 59 | 200 | Meter |
|---|
| 60 | 60 | Fixing of panel box | 60 | 20 | NO |
|---|
| 61 | 61 | Supply of labour | 61 | 250 | NO |
|---|