| 1 | 1 | Design, Supply, Installation, Testing, Commissioning & Maintenance for 03 years beyond warranty period of 40 kWp and 12 kWp On-Grid Rooftop Solar PV Power Plants solar plants in IOCL residential complex at sector 8 and sector 7 respectively at Bikaner BP (Estimated rates are exclusive of GST) | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | Supply Part-A :DESIGN, DETAILED ENGINEERING, SUPPLY OF GRID CONNECTED ROOF TOP SOLAR SYSTEM (Without Battery Bank Back up) OF 40 KWp Capacity INCLUDING PACKING TRANSPORTATION, LOADING UNLOADING, STORAGE AT SITE, RATE INCLUDES ALL LEADS AND LIFTS , TAXES, LEVIES, VAT, OCTROI etc EXCLUDING GST WHICH SHALL BE PAID EXTRA SEPREATELY AS PER ACTUAL.THE SPV SYSTEM MAIN COMPONENTS/EQUIPMENT INCLUDES :\nSOLAR PV MODULES, POWER CONDITIONING UNIT (PCU)/INVERTER MODULE, SOLAR MODULES MOUNTING STRUCTURES, METEOROLOGICAL EQUIPMENT, MULTI FUNCTIONING ENERGY METER/s, DIDGITAL VOLTAGE METERS, AMMETERS, KWH METERS,LIGHTENING ARRESTOR/PROTECTION SYSTEM, REMOTE MONITORING SYSTEM, ELECTRICAL PANELs, Distribution Boards,SWITCHES, MCBs, SURGE ARRESTOR,PROTECTION RELAYs.MATERIALS REQUIRED FOR CIVIL CONSTRUCTION, ELECTRICAL CABLES (SIGNAL, POWER, CONTROL, AC/DC ANY OTHER AS THE CASE MAY BE), CABLE TRAYS CABLE TRENCHES,EARTHING ELECTRODES,SUITABLE ELECTRICAL CONDUITS/EARTHING STRIPS/EARTHING WIRES, CABLE ROUTE MARKERS,Junction Boxes,CABLE TERMINATION GLANDS,LUGS,DANGER & OTHER BOARDs, NAME BOARDs, ELECTRICAL INSULATION MATs, PVC PIPEs, HUME PIPES , STRUCTURAL STEEL ETC., ANY OTHER ITEMS/COMPONENTS/EQUIPMENT REQUIRED FOR INSTALLATION / COMMISSIONING OF THE SYSTEM.FOLLOWING MANDATORY SPARESSPV MODULES: 0.5% OF TOTAL POPULATION, MCCBS/MCB/AC & DC FUSES: 5% OF TOTAL POPULATION OF EACH TYPE, DRIVE FOR PCU: 5% OF TOTAL POPULATION, CONTROL CARD OF EACH TYPE: 1SET, MODULE BYPASS DIODE: 5% OF TOTAL POPULATION, SET OF GASKET FOR TRANSFORMER: 1 NO. | BI01010001010000000000000515BI0100001113 | 1 | LS |
|---|
| 3 | 1.02 | Supply Part-A :DESIGN, DETAILED ENGINEERING, SUPPLY OF GRID CONNECTED ROOF TOP SOLAR SYSTEM (Without Battery Bank Back up) OF 12 KWp Capacity INCLUDING PACKING TRANSPORTATION, LOADING UNLOADING, STORAGE AT SITE, RATE INCLUDES ALL LEADS AND LIFTS , TAXES, LEVIES, VAT, OCTROI etc EXCLUDING GST WHICH SHALL BE PAID EXTRA SEPREATELY AS PER ACTUAL.THE SPV SYSTEM MAIN COMPONENTS/EQUIPMENT INCLUDES :\nSOLAR PV MODULES, POWER CONDITIONING UNIT (PCU)/INVERTER MODULE, SOLAR MODULES MOUNTING STRUCTURES, METEOROLOGICAL EQUIPMENT, MULTI FUNCTIONING ENERGY METER/s, DIDGITAL VOLTAGE METERS, AMMETERS, KWH METERS,LIGHTENING ARRESTOR/PROTECTION SYSTEM, REMOTE MONITORING SYSTEM, ELECTRICAL PANELs, Distribution Boards,SWITCHES, MCBs, SURGE ARRESTOR,PROTECTION RELAYs.MATERIALS REQUIRED FOR CIVIL CONSTRUCTION, ELECTRICAL CABLES (SIGNAL, POWER, CONTROL, AC/DC ANY OTHER AS THE CASE MAY BE), CABLE TRAYS CABLE TRENCHES,EARTHING ELECTRODES,SUITABLE ELECTRICAL CONDUITS/EARTHING STRIPS/EARTHING WIRES, CABLE ROUTE MARKERS,Junction Boxes,CABLE TERMINATION GLANDS,LUGS,DANGER & OTHER BOARDs, NAME BOARDs, ELECTRICAL INSULATION MATs, PVC PIPEs, HUME PIPES , STRUCTURAL STEEL ETC., ANY OTHER ITEMS/COMPONENTS/EQUIPMENT REQUIRED FOR INSTALLATION / COMMISSIONING OF THE SYSTEM.FOLLOWING MANDATORY SPARESSPV MODULES: 0.5% OF TOTAL POPULATION, MCCBS/MCB/AC & DC FUSES: 5% OF TOTAL POPULATION OF EACH TYPE, DRIVE FOR PCU: 5% OF TOTAL POPULATION, CONTROL CARD OF EACH TYPE: 1SET, MODULE BYPASS DIODE: 5% OF TOTAL POPULATION, SET OF GASKET FOR TRANSFORMER: 1 NO. | BI01010001010000000000000515BI0100001114 | 1 | LS |
|---|
| 4 | 1.03 | Installation Part-B: Installation, Testing & Commissioning of Solar System (Without Battery Bank Back up) of 40 KWp WITH ALL LEADS & LIFTS INCLUDING ALL TAXES, DUTIES & LEVIES EXCEPT GST WHICH SHALL BE PAID EXTRA SEPREATELY AS PER ACTUAL.THE JOB INCLUDES INSTALLATION OF THE ALL THE ITEMS SUPPLED UNDER S. NO. 1 ABOVE (EXCEPT SPARES) AND ANY OTHER ITEMS/ EQUIPMENTS REQUIRED FOR COMPLETION OF THE WORK IN ALL ASPECTS. JOB INCLUDES ALL NECCESARY CIVIL/ELCTRICAL/MISC. WORKS INCLUDING MODULE CLEANING MECHANISM, FENCING WITH COST OF ALL CONSTRUCTION MATERIAL, LABOUR ETC. | BI01010001010000000000000515BI0100001115 | 1 | LS |
|---|
| 5 | 1.04 | Galvanum roofing work in sector 8 colony | BI01010001010000000000000515BI0100001116 | 1 | LS |
|---|
| 6 | 1.05 | Installation Part-B: Installation, Testing & Commissioning of Solar System (Without Battery Bank Back up) of 12 KWp WITH ALL LEADS & LIFTS INCLUDING ALL TAXES, DUTIES & LEVIES EXCEPT GST WHICH SHALL BE PAID EXTRA SEPREATELY AS PER ACTUAL.THE JOB INCLUDES INSTALLATION OF THE ALL THE ITEMS SUPPLED UNDER S. NO. 1 ABOVE (EXCEPT SPARES) AND ANY OTHER ITEMS/ EQUIPMENTS REQUIRED FOR COMPLETION OF THE WORK IN ALL ASPECTS. JOB INCLUDES ALL NECCESARY CIVIL/ELCTRICAL/MISC. WORKS INCLUDING MODULE CLEANING MECHANISM, FENCING WITH COST OF ALL CONSTRUCTION MATERIAL, LABOUR ETC. | BI01010001010000000000000515BI0100001117 | 1 | LS |
|---|
| 7 | 1.06 | AMC Part-C:Maintenance Services (Comprehensive O&M with spares) for Solar Sytem (without battery bank backup) of 40 KWp for a period of 3 years commencing after successful commissioningas per detailed tender conditions and instructions of site engineer/ maintenance engineer with all lead & lifts including all travelling, boarding & lodging expenses, taxes, duties & levies except GST which will be paid extra as per actuals. | BI01010001010000000000000515BI0100001119 | 3 | year |
|---|
| 8 | 1.07 | AMC Part-C:Maintenance Services (Comprehensive O&M with spares) for Solar Sytem (without battery bank backup) of 12 KWp for a period of 3 years commencing after successful commissioningas per detailed tender conditions and instructions of site engineer/ maintenance engineer with all lead & lifts including all travelling, boarding & lodging expenses, taxes, duties & levies except GST which will be paid extra as per actuals. | BI01010001010000000000000515BI0100001120 | 3 | year |
|---|