| 1 | 1 | Excavation in earth work and disposal of all excavated earth in all leads and lifts, disposed earth to be levelled and neatly dressed: Spade work & Pickwork | | 1162.35 | Cum |
| 2 | 2 | Providing and laying cement concrete 1:2:4 (1 cement:2 sand :4 graded stone aggregate 40mm nominal size)and curing complete excluding cost of form work in Foundation and plinth including carriage of Materials in all leads & lifts.\n | | 83.29 | Cum |
| 3 | 3 | Providing and laying cement concrete 1:1:2 (1 cement : 1 Sand : 2 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work including carriage of materials in all leads & lifts.(a) In foundations, footings, bases of columns & the like & mass concrete. | | 186.18 | Cum |
| 4 | 4 | (b) Walls (any thickness but not less than 0.10 m thickness) including attached pilasters buttersses, plinth & string coarses etc. From top of foundation upto floor two level. | | 159.75 | Cum |
| 5 | 5 | Providing & laying cement concrete using nominal mix of \" M - 30 \" with 20 mm & down gauge nominal size graded stone aggregate) & curing complete excluding the cost of form work & reinforcement for reinforced concrete work including carriage of materials in all leads and lifts:(a) In foundations, footings, bases of columns & the like & mass concrete | | 14.28 | Cum |
| 6 | 6 | (b) Walls (any thickness but not less than 0.10 m thickness) including attached pilasters buttersses, plinth & string coarses etc. From top of foundation upto all floor levels. | | 11.9 | Cum |
| 7 | 7 | Extra for providing plasticizer / super plasticizer in RCC work of M-30 GRADE @ 1.70 Kg per Cu.m. of concrete including carriage of material in all leads and lifts. | | 44.51 | Kg |
| 8 | 8 | Steel work welded in built up sections,trusses and framed work,including cutting ,hoisting fixing in position and applying a priming coat of red lead paint In gratings framed guard bars,ladders,railling,brackets and similar works including carriage of materials in all leads and lifts. | | 44.48 | Qtl. |
| 9 | 9 | Providing mild steel/Tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto all floor levels-Tor Steel | | 22326.6 | Kg |
| 10 | 10 | Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. So as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work including carriage of materials in all leads and lifts in:\nFlat surfaces such as soffits of suspended floors,roofs,landings and the like floors etc.upto 200mm. In thickness | | 487.12 | Sqm |
| 11 | 11 | (b) Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters buttresses, plinth and string courses and the like. | | 3208.96 | Sqm |
| 12 | 12 | Steel work in single sections including cutting,hoisting,fixing in position and applying a priming coat of red lead paint In R.S.Joists,channels angles,tees | CuM | 90.25 | Kg |
| 13 | 13 | Providing and laying dry stone pitching 5 cm thick including supply of stones and preparing surface complete including carriage in all leads & lifts. | | 165.63 | Sqm |