CONSTRUCTION OF 33 KV SWICHING SUB-STATION (Layinq of 11 KV XLPE cable,Dismantlinq of stay sett,Carriaqe of 33 KV XLPE Cable,Fillingof 11 KV Cable box,Dismantling and refixing of street light,Providing and fixing of Gl pipe 4 dia. & length 3 meter,Laying of 33 KV XLPE cable 3x120 sq mm in trench,Filling of 33 KV Cable box,Makingof Cable Trench,i) Digging of Earth (250x2x1 mtr),iij Stone Pad in 1:4;8 CC size (250x1.5x0.20 mtr),Hi) CC work 1:3:6 for trench wall t0.40x1x2wall) x 250mtr,iv) RCC Slab 1:2:4 CC work with round bar (1.5xO.10)mmx250mtr,Digging of earth in the river,size(3mtrx3mtr x2mtr) x15Nos.,C:Cwork1:3:6 for 33 KV Pole plinth In the river,Re-filling of Earth,33 KV Cable jointing kit for 3x300sq mm cable,Fillinq of cable box,Filling of Switchyard & Cotrol Room (15x27x1) mtr,Testing & Comissioning of VCB, CT & Control Panel,Dismantling of Line/Bus Isolator,C.Ts,VCB,P.Ts,L.As,Manual Shifting of above dismantled material,Line/Bus Isolator,C.Ts,VCB,P.Ts,L.As,Erection of Line/Bus Isolator,C.Ts,VCB,P.Ts,L.As,Dismantling of Structure,Dismantling of Line Isolator,C.Ts,VCB,Control Panel,Erection of Line Isolator,C.Ts,VCB,Control Panel,Dismantling & Re-erection of Bus Isolator,Dismantling of damaged CT,Dismantling & Re-laying of control cable,Dismantlinq & Re-erection of L.As,Providing & fixing of G. I. Pipe 4 Dia & length 3 mtr.,Rearranggement of structure of VCB, CT, Isolator* L.As,Dismantlinq & re-layinq of 33 KV XLPE Cable 3x300 mm)