Construction of 33 kv line for 33kv s/s Selaqui alongwith 33 kv BOC line (Ofsroantlms of 33 KV Bracket/Channel in 33 KV BOC Line,Fixing of above Dismantled Bracket/Channel on the pole,Carriage of 33 KV XLPE Cable 3 x 300 mm store to site,Laying of 33 KV XLPE Cable in the Trench,Filling of 33 KV Cable Box,Providing & fixing of Gl pipe 4 Dia & length 3 mtr,Providing & ffxinq of pole extension pipe 2 mtr. Long,Fixing of M.S. Earth Rod.) CONSTRUCTION OF 33 KV SWITCHING SUB-STATION (Carriage of Stock Material,VCB. Isolators Panel,Excavation of Earth in mixed siol,Leaning, Levetinq and cutting of bushes etc,cement concrete,Cement Plaster,Earth filling,Straghtening and laying of Earth mat,Erection and assembling/fixing of Terminal gantry,Bus bar gantry,Isolator Structure (Line/Bus),Lightening Arrestor. Structure,CT structure,Cutting, Handling of R.S Joists,Bending, Laying, Connection welding cutting of 35x6/32 x 8 mm Gl Strtp/MS Strip,Making Special earthing at corner of switchyard by providing 40 kg. of wooden charcoal, 10 kg common salt, 2.5 kg. copper sulphate providing fixing 2 nos. 18 x 18 x 0.5 Cl earth Plate, jointing them with 6 long bolt and keeping them burried in side charcoal in standing position and connecting the same with main earth mat Gl wire No. 6 SWG passing to Gl wire through 40 mm dia 6 mtr long Gl pipe keeping the upper edge of the pipe 0.3 mtr above ground level and making suitable capping arrangement on top to avoid entering earth in pipe but same can be watered as & when desired by removing the cap complete job,Erection, complete fixing of VCB on structure and making necessary connection with almost care,Fixing & making bus bar connection,Shifting & erection of double/single Ckt. Control Panel,Laving of 2/4/6x2.5 mm control cable from T/F junction box to D.C/S.C T/F Control panel and to S.Gs burred the cable in switch yard making connections of cable with transformer indications board In S.Gs including providing perforated tray, sleeves, ferrules PVC flexible pipe and bends and laying of control cable in it on T/F end on control Panel to SGs end For VCB & Ct etc. control Panel of VCB at different size as per drawing complete job.,Fixing of clamps,Laying, stringing, sagging of 3nos conductor Bus bar of ACSR panther conductor,Laying, stringing, sagging and fixing of 3 parallel conductor jumper,Painting of Terminal gantry,Bus bar gantry,Isolator Structure,Lightening Arrestor structure, CT Structure,