Construction Of Boundary Wall At Goalpara, Assam- Excavation Upto 1.5 M Depth: Excavation In All Types Of Soil, For Footings, Steps, Plinth Beams, Equipment Foundations, Pile Caps, Drains, Trenches, Manholes, Underground Tanks, Etc Including Shoring Strutting As Required As Per Site Condition, Dewatering Where Required (Until Foundation Work Is Complete). Item Also Includes Carting, Stacking If Required By Hpcl Eic, Spreading, Levelling And Compacting/Consolidating Surplus Materials Within Plant Premises At Unobjectionable Area Or As Per Instruction Of Hpcl Eic. , Excavation From 1.5 To 3.0 M Depth Excavation In All Types Of Sand, For Footings, Steps, Plinth Beams, Equipment Foundations, Pile Caps, Drains, Trenches, Manholes, Underground Tanks, Etc Including Shoring Strutting As Required As Per Site Condition, Dewatering Where Required (Until Foundation Work Is Complete). Item Also Includes Carting, Stacking If Required By Hpcl Engineer In Charge, Spreading, Levelling And Compacting/Consolidating Surplus Materials With Any Lead Within Plant Premises At Unobjectionable Area Or As Per Instruction Of Hpcl Eic., Filling With Available Excavated Earth/Debris In Trenches, Plinth, Sides Of Foundations Etc In Layers (Layers Of 150/200 Mm) And Consolidating Each Deposited Layer By Ramming And Watering Etc. Note: Agency Has To Submit, At The Time Of Billing, Reconciliation Statement Showing The Quantum Of Earth Work, Back Filling, Disposal And Dismantling. Quantity Arrived At After Certifying The Reconciliation Statement Shall Only Be Considered For Making Payment Towards Respective Items Of Earth Work, Back Filling, Disposal And Dismantling , Supply And Filling Murrum Soil In 150 Mm Thickness Layers Including Leveling, Watering, Compacting Each Layer With Plate Vibrator. Payment Will Be Made Only For Compacted Thickness. In Case A Job Requires Usage Of Vibrating Power Roller Vehicle (> 10 Ton) Etc