5 5. Routine & Bd Mtce Of C&I Phi Vimprovement Works & Panel Cleaning Works Labour Charges For Rectification / Replacing Corroded Impulse Lines And Fittings, Replacing The Existing Lines By Special Type Tubes, Dcs And Markv, Local Control Panels, Panel Wiring Modifications, Providing / Changing New Terminal Blocks In Junction Boxes And Panels As Per The Instruction Of Engineer Incharge. Blower Cleaning Of Panels, Cleaning Of All I / O Modules With Ipa Like Di, Do, Ai, Ao, Processor, Local Bus Modules, Intra Plant Bus Modules, Quick Response Modules, Termination Modules Etc., Cleaning Of Racks With Ipa, Checking / Lubricating The Cooling Fans, Checking The Earth Connections, Checking The Mcbs, Relays, Incoming Supply Levels Etc. Total No Of Improvement / Cleaning Of Panels Expected 200 6 6. Routine & Bd Mtce Of C&I Phi Vimiscellaneous Works Labour Charges For Removing / Refixing Of Instruments Such As Pressure / Temperature Gauges , Pressure / Temperature Switches, Thermocouple, Rtd, Solenoid Valves, Limit Switches, Sample Line, Impulse Line, Control Valves And Hydraulic Valves, On / Off Valves Instruments Such As Positioners, I / P, I / H, Air Regulator, Volume Boosters, Position Transmitters Etc., From Gtg , Stg , Hrsg, Gbc, Bop, Ia / Pa Compressor, Dm Plant For The Work Of Other Sub Division Works ( Mechanical & Electrical ) Like Overhauling And Inspection ..............Etc ( Refer Tender Document )