Tender For Providing Antitermite Treatment ( Preconstruction ) For The Foundation And Ground Floor Of The Building As Per Is 6313 ( Part Ii ) Including Cost Of All Materials, Labour Charges, Lead, Lift, T&Ps Etc., Complete. Refilling With Excavated Earth Wellwatered And Consolidated In Layers Of Not More Than 150Mm Thick In Foundation And Basement As Directed By The Engineer In Charge Including All Labour Charges, Lead, Lift, T&Ps Etc., Complete. Supplying And Filling River Sand / M Sand Well Watered And Consolidated In Foundation And Basement In Layers Complying With Standard Specification As Directed By The Engineer In Charge Including Cost Of All Materials, All Labour Charges, Lead, Lift, T&Ps Etc., Complete. Supplying And Filling With Gravel From Borrow Pits In Layers For Basement Well Watered And Consolidated Complying With Standard Specification As Directed By The Engineer In Charge Including Cost Of All Materials, All Labour Charges, Lead, Lift, T&Ps Etc., Complete. Providing P.C.C. 1:4:8 Using 40Mm Hbg Metal For Foundation And Basement As Directed By The Engineer In Charge Including Cost Of All Materials, Labour Charges, Curing, T&P, Laed, Lift Etc., Complete. 10M ³ Providing Random Rubble Masonary In Cm 1.5 For Basement As Directed By The Engineer In Charge Including Cost Of All Materials, Labour Charges, Curing, T&P, Lead, Lift Etc., Complete. Providing R.C.C. M25 Grade For Footings, Strip Raft And Plinth Beam Using 12Mm To 20Mm Graded Hbg Metal With Minimum Cement Content Of 300Kg Per Cum And Maximum Watercement Ratio Of 0.5 As Directed By The Engineer In Charge Including Cost Of Form Work, Centering And Shuttering, Cost Of All Materials, Labour Charges, Vibrating The Concrete, Curing, All T&P, Lead, Lift Etc., Complete But Excluding Cost Of Steel Reinforcement For Footing